Board of Supervisors
Agenda — April 8, 2021
- Date
- April 8, 2021
- Type
- Agenda
- Year
- 2021
- File
- PDF · 13.4 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 5,174 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS MARCH 11,2021 ENGINEER'SAGENDA Subdivision Review Status Checklist Next Supervisors Meeting April 8, 2021. All plans current. Subdivision / Zoning / LDP KopferPlanning Module approval. Giorgi Mushroom zoning hearing March 15. Kopfer final plan, see SDE March 3, 2021 review Itr; no action. Giorgi Mushroom Prel.Plan, see SDE March 3, 2021 review Itr; no action. Projects Street Projects 2021 Scope of work under review with Twp. Manager and Road Foreman. Tree tops subdivision streets Storm water basin inspection -- Inspections to continue; weather dependent. Storm Damage Storm water committee first mtg.March 8, 2021 Rt.222 parking study Getting PennDOT guidance/requirements SubdivisionImprovementLOC/EscrowRelease None Sewage Enforcement Officer Activity Report See Attached Page1of1 I:\Projects\MaidencreekTownship/21-0019-0100\Engineer'sAgendal03.11.21.docx No. I:/ProjectsIMaidencreek Township PCISubdivision StatuslSubdivision Status Checklists/20213.3.2021 Redner's Quickshop and Car Wash Prelm Plan Project Name David Kopfer Subdivision Jojaz Subdivision Giorgi Mushroom Co 100 White Star Road APPROVED/PENDINGPLANS: CURRENT PLANS: Prelim Plan Sketch Plan Prelm/Final Plan Stage Final Plan Plan Review Period 06/03/20 06/03/20 03/03/21 06/03/20 Begins 90-Day MAIDENCREEKTOWNSHIP,BERKSCOUNTY Period Ends SUBDIVISION STATUS 06/01/21 09/01/20 09/01/20 09/01/20 Review 90-Day 3/3/2021 than one extension) 3/1/2021 6/1/2021 (may reflect more 11/30/2020 5/31/2021 12/1/2020 2/28/2021 Extension 12/01/20 BY BOS Approved 11/12/20 Plan approval 11/12/20. Waiting 90 period will begin with Zoning Appeal. BOS granted conditional Prel. Zoning Variance granted on HOP and court date for Preliminary or Final Plan DEP Planning Module submitted to Comments Letter Date Most Recent 10/7/2020 3/3/2021 11/3/2020 3/3/2021 1/6/2021 Review 3850-FM-BCW0355Rey.5/2016 COMMONWEALTHOFPENNSYLVANIA pennsylvania DEPARTMENTOFENVIRONMENTALPROTECTION DEPARIMENTOFEVIRONMENTAL BUREAU OF CLEAN WATER PAOTECTION TRANSMITTALLETTER FOR SEWAGE FACLITIES PLANNING MODULE DEPARTMENTOFENVIRONMENTALPROTECTION(DEP)USEONLY DEPCODE CLIENTID# A3 -00992-19- SITEID* APSID AUTH. ID # TO: Approving Agency (DEP or delegated local agency) Date AVE Dear Sir/Madam: DAUID KePFER (Name) for (Title) a subdivision, cammsrcialorindustriat facifity located in MHiORNCREEK (Nama) BhDks County. (City,Borough,Township) Check one proposed revision supplement for new land development to its Official Sewage Facilities Plan (Official Plan), and is adopted for submission to DEP transmitted to the delegated LA for approval in accordance with the requirements of 25 Pa. Code Chapter 71 and the Pennsylvania Sewage Facilities Act (35 P.S. s750), OR I (ii) The planning module wil not be approved by the municipality as a proposecl revision or supplement for new land development to is Oficial Plan because the project described therein is unacceptable for the reason(s) checked below: Check Boxes Additional studies are being performed by or on behaff of this municipality which may have an effect on the planning module as prepared and submitted by the applicant. Attached hereto is the scope of services to be performed and the time scheduie for completion of said studies. The planning module as submitted by the applicant fails to meet limitations imposed by other iaws or 25 Pa. Code Chapter 71). Specific reference or applicable segments of such laws or plans are attached hereto. Other (attach additional sheet giving specifics). approving agency. Resolution of Adoption Sewage Collection/Treatment Facilities Module Completeness Checklist 14A Municipal PlanningAgencyReview 3s Small Flow TreatmentFacilities 12IndividuaiandCommunityOnlot 4B CountyPlanning AgencyReview Disposalof Sewage 4C CountyorJointHealthDepartment Review Municipal Secretary (print) Signature Date Telephone Governing Body Seal of Municipal Address: 20 adopted, the Township (Borough) (City) Resolution # Secretary. attached hereto. finds that the subdivision described in the attached municipality WHEREAS. other, (please specify). new , and described in the attached Sewage Facilities Planning Module, and nameof subdivision has proposed the development of a parcel of iand identifiedi as land developer WHEREAS WHEREAs Section 5 of the Aci of January 24, 1966. P.L. 1535, No. 537. known as the Pennsylvania Sewage ADRUCEEEK (TOWNSHIP) (BEROLIG(eTTY), FOR NEWLAND DEVELOPMENT RESOLUTION FORPLANREVISION 43-0942-119-2 BUREAUOF CLEANWATER DEPARTMENTOFENVIRONMENTAL PROTECTION DEP Code No. DEPARTMENTOFENVIRONMENTALPROTECTION COMMONWEALTH OFPENNSYLVANIA 3850-FM-BCW0356ReV.5/2016 SYSTEMSDESIGN SDE ENGINEERING,INC sdei net March 3,2021 Maidencreek Township Manager 1 Quarry Road Blandon,PA19510 Re: David Kopfer Lot 2Subdivision Final Plan Review Ms.Hollenbach: Systems Design Engineering, Inc. is in receipt of a Final Plan entitled "David Kopfer Lot 2." The on the northeast side of Pleasant Hill Road. The second is the smaller portion that is located on the southwest side of Pleasant Hill Road at the intersection with Hoch Road. The Plan was prepared by Tarson, LLC. The submission consisted of the following: Sheet 1of 1 Final Plan Dated1/24/2020,rev.1/19/2021 E&S Plan Sheet 1of 3 Dated1/24/2020,rev,1/19/2021 E&SPlan Sheet 2 of 3 Dated1/24/2020,rev.1/19/2021 E&SPlan Sheet 3 of 3 Dated4/20/2020,rev.1/19/2021 Sewage Planning Module Dated 2/16/2021 Stormwater Analysis Dated 2/10/2021 Response Letterto SDEreview Undated Berks County Conservation District Letter Dated6/1/2020 BACKGROUND: The purpose of the plan is to subdivide an existing tract that is zoned for Agricultural Preservation (AP). The tract consists of two (2) portions that are deeded together and currently total 103.1 acres in size. The smaller of the two portions would be subdivided. The subdivision would create a 1.65-acre flag lot that would be used for single-family residential. The new lot would have access to Hoch Road via a flag lot access strip and would not have access to Pleasant Hill Road. The lot is to be served by private well and on-lot sewage disposal. I:/Prpjects/MaidencreekTownshipPC120-0024-0718David Kopfer SubdivisionlSubdivision Review#2.docx 1032James Drive, Leesport, PA19533P:610.916.8500F:610.916.8501 SchuylkillHaven,PA.P:570.385.5549 Boyertown,PAP: 610.369.1319 SDE as exempt from Standard procedures. The plan title should be updated. Per Subsection A, a plan must be labelled as a Final Plan to be considered procedures. The Applicant intends the submitted plan to be considered exempt from standard 1. Per $190-29, Plans Exempt from Standard Procedures SALDO: frontage as shown on the plan and to allow the proposed flag lot. Addressed. Relief was granted on November 17, 2020 to allow the road The required road frontage is 150 feet. proposed lot size of 1.65-acres is necessary due to on-lot sewage planning. The lot area must be 1.5 acres in size. 2.Per 5220-17,Area and Bulk Regulations Farm Actdisclosure. subject to the stipulations of Section $220-17, which includes the 1982 Right-to- Single-family residential is permitted in the Agricultural Preservation District 1. Per 5220-16, Permitted Uses Additional comments arepresented below. residence. The property is located in the Ap -- Agricuitural Preservation District. The use of the proposed ZONING: the criteria of "Plans Exempt from Standard Procedure." This letter presents comments on the second review of the proposed subdivision. This plan fits REVIEW: Final PlanReview Page 2 of 7 David Kopfer Subdivision Re: March3,2021 MaidencreekTownshipPlanning Commission MaidencreekTownship Planning Commission March 3, 2021 Re: David Kopfer Subdivision Page 3 of 7 Final PlanReview Addressed.The planis now labelled a Final Plan. Per Subsection E(3),the plan must show compliance withArea and Bulk requirements. Addressed. The plan complies withArea and Bulk requirements nowthat zoning relief was granted. 2. Per $190-33, Driveways Per subsection A(2), at least the first twenty (20) feet of driveway must be paved, starting at the edge of the cartway. oAddressed. A note was added to the plan stating that the first twenty (20) feet of driveway will be paved, A clear sight triangle should be added to the plan for the proposed driveway. o Addressed. applicant and shall be prepared by a professional engineer licensed as such by the Commonwealth of Pennsylvania. SEWAGE ENFORCEMENT: 1. The proposed on-lot sewage system utilizing spray irrigation is under review by the Township. The Sewage Facilities Planning Module will be sent to DEP for review and approvalas appropriate. STORMWATERMANAGEMENT: 1.Per 5182-11, Erosion and Sediment Control -- The Erosion & Sediment Control Plan should be submitted to the Berks County Conservation District for review and approval. A copy of the approval letter should be submitted to the Township. Addressed.A copy of the approval letter has been submitted. SDF include that "Either Proposed Lot 2 or the remaining lands may use the remaining impervious cover being approved for Lot 2. The note needs to be revised to Partially addressed: Note 5 has been added to the plan regarding the proposed remaining allowable impervious cover for any future dwelling unit construction. total new impervious cover on the parent tract. if an exemption is requested, the plan from the drainage plan requirements, which allows a maximum of 15,o00 square feet of 5. Per $182-21.B.(1), Exemptions --The project meets the requirements for an exemption 16. Addressed: An exemption has been requested for an allowable 15,o00 sf of Comment below for 182-21, Exemptions. However, an exemption from this section of the ordinance would be applicable; see be increased as a result of the proposed driveway and house construction, and based on located in Management District B2 which requires post-development site runoff to be 4. Per §182-16, Stormwater Management Districts -- The property being developed is Outstanding: See Item 10 of this section. requirement. 1-yr pre-development rate. The designer should contact our office to discuss this 3. Per $182-15, Streambank Erosion Requirements -- The current design does not meet the .Addressed. theberm/basin. The design infiltration rate should be based only on the tests located in close proximity to Addressed. Test pit numbers are consistent with the Soil Testing Report. three (3)test locations shownontheplan. correspond to the test pit numbers in the Soil Testing Report. It appears there are only 2. Per 182-13.B, Groundwater Recharge -The test pit numbers on the plan should FinalPlanReview Page 4 of 7 DavidKopferSubdivision Re: March 3, 2021 MaidencreekTownshipPlanning Commission MaidencreekTownshipPlanning Commission March3, 2021 Re: David Kopfer Subdivision Page 5 of 7 Final Plan Review exemption only applies to the rate caiculations. Groundwater recharge, Water Quality, and Streambank Erosion controls must be addressed at that time". Based on the computations submitted, the streambank erosion peak rate reduction must still be addressed. Addressed. 6. Per 182-22.B.(22), Drainage Plan Contents -A note should be added to the plan and signed by the landowner acknowledging that any revision to the approved drainage plan $182-22.E.(2)(d). Addressed. A signature block has been added to Sheet 1 of 1 Final Plan. 7.Per§182-22.D.(1)--The following construction details should be provided: 1)Infiltrationberm/basincross-section 2) Emergency spillway Partially addressed: A detail has been provided for the berm cross-section that includes the elevation for top of berm and the emergency spillway. Provide the top width of the berm as well as the width of the emergency spillway on the detail and the pians. Label the spilway on the plan set and revise grading to show basin grades at a 4:1 side slope. Add a note stating "All basins shall be structurally sound and shall be constructed of durable materials" and,"Embankments shall be placed in maximum eight-inch lifts to a minimum of 95% of maximum dry density, as establishedbyASTMD-1557"per182-17.C(7). 8. Per $182-32 and $182-34, Operations and Maintenance Agreement for Privately Owned Stormwater Controls and BMPs --The Stormwater Management Controls and Best Management Practices Operations and Maintenance Agreement in Appendix Aof the Stormwater Management Ordinance should be submitted for review and approval by the Township. Outstanding:The Operations and Maintenance Agreement shall be submitted for review and approval. SDE cultivation is prohibited. should include any restriction to cultivation. Markers may need to be placed in the field if 1. The applicant should address any restriction in use within the nitrate easement. This MISCELLANEOUS: driveway radius or flared construction. point of intersection with the cartway edge. Revise the plan and detail to show the five feet or shall have a flare construction that is equivalent to this radius at the Outstanding: Driveway entrances shall either be rounded at a minimum radius of Partially addressed: A driveway paving cross-section has been added to the plans. 1. A driveway cross-section and paving detail should be provided. MISCELLANEOUS DRAFTING COMMENTS: documentation that the basin will empty within four days. 11. Per 182-13.D.A(2)(c), the infiltration facility shall be capable of completely infiltrating the increased on the adjacent property owners. discharge criteria specified in this chapter. Provide calculations that runoff is not permission of the affected property owner(s) and shall be subject to any applicable property shall not be altered in any manner which could cause property damage without Addressed. Note 6 has been added to sheet 1 of 1 Final Plan. note on the Cover Sheet providing a blanket easement is acceptable. should be provided to allow access for inspection, maintenance or preservation of the 9. Per s182-33, Stormwater Management Easements -Stormwater management easements added to sheet 2 of 3 of the E & S Plan. should be noted on the plan. The long-term operations and maintenance requirements for the infiltration berm/basin Final PlanReview Page 6 of7 David Kopfer Subdivision Re: March 3, 2021 MaidencreekTownshipPlanning Commission Maidencreek Township Planning Commission March3,2021 Re: David Kopfer Subdivision Page 7of 7 FinalPlanReview Addressed. Nitrate easements are not required on spray irrigation systems. 2. Township and DEP approval for an on-lot system should be obtained prior to Final Plan approval of the subdivision plan. Outstanding: Will remain until the approval has been received. 3. The applicant may need to amend the proposed boundaries of the nitrate easement to the satisfaction of DEP. Addressed. Nitrate easements are not required on spray irrigation systems. 4. Final Pian ordinance requirements are on shown Final Plan, Sheets 1 of 1, and on E & S Pians, Sheets 1-3 of 3,. All plans should be recorded to ensure all relevant information is recorded. Include a note on Sheet 1 of 1 that reflects sheet numbers to be recorded. 5. The rear and front yard setback should be shown the full width of the lot until they intersect with the sideyard setback.Revise the plans. 6.Note8is subjecttoDEP Planning Moduleapproval. 7. Add a note to the plan at the intersection of the driveway and Hoch Road stating that the driveway shall be graded to prevent water runoff onto the cartway. If you should have any questions or comments,please do not hesitate to contact our office Sincerely, SYSTEMS DESIGN ENGINEERING,INC. PhilipJ.Ashear Township Planning Consultant Cc: MaidencreekTownshipPlanningCommissioners Eugene Orlando,Jr./Township Solicitor Dan Laudenslayer/Applicant's Surveyor David Kopfer / Appicant (via mail) SDE Boyertown, PA . P: 610.369.1319 Schuyikill Haven,PAP:570.385.5549 2/16/2021 C.2-64 PCSM Details 2/16/2021 C.2-63 PCSM Plan -Sheet 2 of 2 2/16/2021 C.2-62 PCSM Plan-Sheet 1of 2 2/16/2021 C.2-61 Pre-construction Conditions Plan - Sheet 2 of 2 2/16/2021 C.2-60 Pre-constructionConditionsPlan-- Sheet1of2 2/16/2021 C.2-03 Grading Plan - Sheet 3 of 3 2/16/2021 C.2-02 Grading Plan - Sheet 2 of 3 2/16/2021 C.2-01 Grading Pian --Sheet 1 of 3 2/16/2021 C.1-52 Demolition Plan 2/16/2021 C.1-51 Existing Conditions and Site Analysis -- Sheet 2 of 2 2/16/2021 C.1-50 Existing Conditions and Site Analysis - Sheet 1 of 2 2/16/2021 C.1-03 Site Plan Sheet 3 of 3 2/16/2021 C.1-02 Site Plan - Sheet 2 of 3 2/16/2021 C.1-01 SitePlan-Sheet1of 3 2/16/2021 C.0-02 Legends and Notes 2/16/2021 C.0-01 Cover Sheet Date Dwg No. Title Stormwater Management report and the following: neighboring parcel to the south and another on June Ave via an access easement thought the Co." The site has two (2) access points; one on Park Road via an access easement through the Ms. Hollenbach: Preliminary Plan Review#1 Giori Mushroom Co. Re: Blandon,PA19510 1 Quarry Road Maidencreek Township Diane Hollenbach,TownshipManager March 3, 2021 sdei.net ENGINEERING,INC SDE SYSTEMSDESIGN MaidencreekTownshipPlanning Commission March3,2021 Re: GiorgiMushroom Co. Page2of 11 Preliminary Plan Review C.2-65 PCSM Details 2/16/2021 C.2-66 PCSM Plan Details and Notes 2/16/2021 C.3-01 Utility Plan - Sheet 1 of 2 2/16/2021 C.3-02 Utility Plan - Sheet 2 of 2 2/16/2021 C.4-01 Drive A, Storm Sewer and Sanitary Profiles 2/16/2021 C.4-02 Drive B and Sanitary Profiles 2/16/2021 C.4-03 Cross-Country Storm Sewer Profiles 2/16/2021 C.4-04 Cross-Country Storm Sewer, Sanitary and Process Waste Profiles 2/16/2021 C.6-01 Site Construction Details -- Sheet 1 of 2 2/16/2021 C.6-02 Site Construction Details -Sheet 2 of 2 2/16/2021 EL.1-01 Electrical Site Lighting-Overall Plan 2/16/2021 EL.1-02 Electrical Site Lighting- lumination Point by Point -- Part One 2/16/2021 EL.1-03 Electrical Site Lighting- Ilumination Point by Point -- Part Two 2/16/2021 EL.4-01 Electrical Site Lighting-Lighting Fixture Cutsheets 2/16/2021 BACKGROUND: The purpose of the plan is to establish a 169,830.5 square foot building that will be used for a mushroom farm. The building would be constructed in three (3) phases and would have access to Park Road via the adjacent parcel. The subject site is zoned I -- Industrial while the neighboring parcel that would include the access drive is zoned SlA -- Special Intensified Agriculture. REVIEW: This letter presents comments on the flrst review of the submitted Preliminary Plan. ZONING: The subject site is located in the I-lndustrial Zoning District while the access drive is located in the SIA-Special Intensified Agriculture Zoning District. 1.Per$220-48,PermittedUses The applicant's interpretation of"front yard,""side yard," and"rear yard" is unclear. The required front yard setback is 4o feet and the front setback line should be added to the plan. Clarification should be provided. SDE add it tothe Zoning Requirements table. for the proposed use is unclear. The applicant should justify the parking count and 35 parking spaces are provided, including 2 ADA spaces. The parking calculation 3.Per $220-61, Parking and Truck Loading Requirements demonstrate conformity with this section. building shall be specified and added to the Zoning Requirements table to except that the setback requirement for the accessory structure shall not have a Accessory structures for agriculture are exempt from the height requirement Therefore, this section applies. According to the Special Exception granted in 2003, the use of the subject site for 2.Per $220-58, AccessoryUses andStructures also be provided. Information regarding the principal use on the neighboring parcel should Zoning District. an accessory use on an adjacent lot should be evaluated. See section s220- prior application to the ZHB. The request for a Special Exception to allow conforming use" is not appropriate. The applicant should investigate the conforming use. seeking a decision that the use of the property for mushroom farming is a non- The current ZHB application dated January 29, 2021 states that the applicant is special exception. that accessory uses on a separate lot from the principal use are permitted by A Special Exception was granted in 2003 to allow mushroom farming as an speciat exception or conditional use in the Industrial Zoning District. Agricultural use. Mushroom farming is not listed as a use permitted by-right, District; however, the mushroom farm use is considered a Special Intensified Per subsection A(14), general agriculture is a permitted use in the Industrial Zoning Preliminary Plan Review Page3 of 11 GiorgiMushroom Co. Re: March3,2021 MaidencreekTownship Planning Commission MaidencreekTownshipPlanning Commission March3,2021 Re: GiorgiMushroomCo. Page 4of 11 PreliminaryPlanReview Loading spaces are not shown on the plan. The loading space count should be justifiedand shownontheplanwith12'by50'spaces. LIGHTINGSTANDARDS: 1.Per$186-47,Design and Performance Criteria Per subsection A(1), the minimum average maintained footcandle is 2.0 for a 4:1 uniformity ratio, The applicant shall add the average maintained footcandle to the plan and state the uniformity ratio. Per subsection B(3)(b)[1], lighting not used for security shall be switched off between11:00pmanddawn. Per subsection B(3)(b)[2], a note shall be added to the plan stating that all-night security lighting will not exceed 25% of normal levels. SALDO: 1.Per$190-15,PreliminaryPlanRequirements Per Subsection C,the plan shall be sealed bythe professional responsible for the plan, prior to Final Plan approval. Per subsection G,provide all existing easements including the access easement and the existing encroachment easement. Per subsection I(2), provide the Special Exception request on the cover sheet. Per subsection N(1), provide the location and width of all proposed rights-of-way, utility easement locations, and a statement of any conditions governing their use. Per subsection N(2), provide the building setback lines along Route 222,if appropriate. 2.Per s190-16, lnformation to accompanypreliminary plan Per subsection F(1),provide tract boundary with bearings and distances. Per subsection F(9),provide existing uses on surrounding properties. SDE Township shall be installed within 6oo feet of all existing and proposed structures, provided, fire hydrants suitable for the coupling of equipment serving the Per subsection D, fire hydrants, wherever a public or community water system is watercapacityfortheproposed use. maintenance of such distribution system. Provide supporting documentation of establishedforthedesign,specifications, construction, ownership,and shall be submitted with the final plan. Suitable agreements shall also be specifications of the Middle Department Association of Fire Underwriters. A copy each lot, with adequate main sizes and fire hydrants located to meet the distribution system shall be designed to furnish an adequate supply of water to system is geographically and economically accessible to a proposed subdivision, a 5.Per 190-40, Water supply proposed building use, sewage treatment plant is designed to process the additional flows of the the maintenance thereof. Provide supporting documentation that the existing Protection and such system shall be further subject to satisfactory provision for subject to the approval of the Pennsylvania Department of Environmental Per subsection G.(1), the design and installation of a community system shall be 4.Per190-38, Sanitarysewage disposal existingdrivefromParkRoad. bays and turnaround areas. Provide dimensions on the drive areas including the Per subsection A(5), driveways to serve commercial and industrial uses shall have a 3. Per $190-33, Driveways Per subsection l, provide a Water resources study. sewage treatment plant. Township. Provide supporting documentation regarding the usage of the existing all residents of such subdivision or land development and not deeded to the development which proposes land or facilities to be owned or used in common by Per subsection G (1), a trust agreement shall be created for any subdivision or land Preliminary Plan Review Page5of 11 Giorgi Mushroam Co. Re: March 3, 2021 MaidencreekTownship Planning Commission Maidencreek Township Planning Commission March3,2021 Re: GiorgiMushroomCo. Page 6 of 11 PreliminaryPlanReview such distance to be measured by way of accessible streets (as specified by the Middle Department Association of Fire Underwriters). Hydrant locations shall be selected upon consultation with the initial response fire company for the development and shall be approved by the Maidencreek Township Water Authority. 6.Per$190-41,ErosionControl Per subsection C, provide supporting documentation that the project meets the standards and specifications of the Berks County Conservation District and the guidelines under Chapter 102 of Administrative Code Title 25 for the Pennsylvania DepartmentofEnvironmentalProtection. 7. Per$190-42, Storm Drainage Per subsection C(11), all developments must also include design provisions that allow for the averland conveyance of the post Qioo year storm flows through the site without damage to any private or public property. Provide 10o year drainage calculations for Swale #1 to ensure it can convey the 1oo year storm flow. Per subsection F(i)(c), an access easement shall be provided for all detention basins. Per subsection F(2)(b), a method of carrying low fiow through the basin area shall be provided. Provide additional information on how the detention basin meets this requirement. Per subsection F(2)(d), the storage duration shall not exceed 24 hours after rainfall has ceased, Provide dewatering information for the basins. Per subsection F(2)(f), basins shall have provisions for de-watering, particularly the bottom, and shall not create swampy or otherwise unmaintainable conditions. Per subsection F(4)(f), a minimum one-foot freeboard above the maximum design water surface elevation at the emergency spillway shall be provided. The infiltration basins do not have 1' of freeboard over the maximum design water surface elevation. Revise to meet this requirement. Per subsection G, the preliminary plan shall reflect or be accompanied by documentation identifying the ownership of and the method of administering and to be utilized for infiltration. infiltration basins. Provide clarification if the flat bottom of the detention basin is Per subsection C.(2), provide loading ratio calculations forthe bottoms of the flow to be infiltrated has been pretreated. Per subsection A.(2)(d), provide supporting documentation that the volume of (infiltration) volume within four days (96 hours). infiltration facility is capable of completely infiltrating the required retention Per subsection A.(2)(c), provide dewatering calculations showing that the 3. Per g182-13, Groundwaterrecharge to maintain maximum infiltration capacity. be protected from sedimentation and compaction during the construction phase Per subsection F. (1), provide a note that areas proposed for infiltration BMPs shall .Per subsection C, under 25 Pa.Code Chapter 92, a DEp"NPDES construction 2. Per g182-11, Erosion and Sediment Control watercourses. drainage easements shall be provided conforming to the line of such Per subsection F, where a development site is traversed by existing watercourses, 1. Per 5182-9,General Requirements STORMWATER MANAGEMENT: Provide the methodology that will be utilized. by dedication to the Township, Maintenance by a private entity or by agreement. site, Also, Ownership, administration, and maintenance of these facilities shall be Management Maintenance. Revise the note to specific to the locatlon of project their design capacity. There is a note on the cover sheet regarding Stormwater facilities to be owned by the developer or his assigns shall be maintained to retain PreliminaryPlan Review Page7of11 Giorgi Mushroom Co. Re: March 3,2021 MaidencreekTownshipPlanning Commission MaidencreekTownshipPlanningCommission March 3,2021 Re: GiorgiMushroom Co. Page8of 11 PreliminaryPlanReview 4.Per$182-15,Streambankerosion Per subsection A., provisions shall be made (such as adding a small orifice at the bottom of the outlet structure) so that the proposed condition one-year storm takes a minimum of 24 hours to drain from the facility from a point where the maximum volume of water from the one-year storm is captured. Provide supporting documentation that the one-year storm takes a minimum of 24 hours to drain. 5.Per s182-17,Design criteriafor stormwater management and conveyance BMPs. Per subsection C.(8),all basins not including groundwater recharge and/or water quality storage shall include an outlet structure to permit draining the basin to a completely dry condition within 24 hours following the end of the design rainfall. Provide dewatering calculations. Per subsection C.(11), iow flow channels shall be provided from each water-carrying facility to the outlet structure for all basins that do not include groundwater recharge and/or water quality storage. Low flow channels shall be 1% minimum slope and shall be designed to enable ease of maintenance. Provide low flow channels in the detention basin if it is not to be used for recharge or water quality. Per subsection C.(12), minimum slope within a basin that does not include groundwater recharge and/or water quality storage shall be 2% positive grade to the lowflowchannel. must have watertight joints. sewer pipes, culverts. Provide Energy dissipater sizing calculations and include a detail on the plan. 6.Per$182-22,Drainageplancontents Per subsection A.(4), provide an Erosion and Sediment Control Plan. Per subsection A.(19),provide a twenty-foot-wide access easement around all stormwater management facilities that would provide ingress to and egress from a public right-of-way. SDE Commonwealth to reflect the current project information. 4. On sheet C.2-66, update the Soils Information and the Receiving Waters of the along the retaining wall. existing gravel drive. Include the area in which the gravel drive is to be reconstructed 3. Delineate the location of the gravel and paved areas in the project site and along the should.be shown on theplan. The 2005 plan also showed an access easement to Park Road. This easement most recent plans. structure that crossed parcel lines. That easement should be shown on be shown on the 2. The recorded plan in 2005 showed a fifty (50) foot encroachment easement for a analysis - sheet 2 of 2." GENERAL: requested waivers. regard to plan scale and profile scale, respectively. The Planning Commission should 1. The applicant is requesting Waivers from Sections $190-14.A(3) and 190-16.B with WAIVERS: controls. for the timely installation and proper construction of all stormwater management Per subsection A, provide a financial guarantee to the Township of Maidencreek 7.Per 182-30, Performance guarantee with $182-31. Per subsection C.(1)(f). provide an operation and maintenance plan in accordance by the Township of Maidencreek and the Conservation District. acknowledging that any revision to the approved drainage plan must be approved Per subsection A.(22), provide a statement, signed by the landowner, PreliminaryPlanReview Page 9of 11 Giorgi Mushroom Co. Re: March 3, 2021 MaidencreekTownshipPlanningCommission MaidencreekTownshipPlanning Commission March 3, 2021 Re: GiorgiMushroomCo. Page 10of 11 PreliminaryPlanReview 5. On sheet DA.1, it appears that Basin 2 and 3 drainage areas do not include the linear area along the northern property line (just north of the detention basin) and the paved drive that runs west from the detention basin spillway although they are labeled as B2 and B3, respectively. Revise the drainage divides to reflect the full drainage areas to the basins. 6. On Sheet DA.1, the Time of concentrations for Basins A and B should begin at the top of the embankment of the detention basin. Revise the TC path and update the values in the report. 7.The TC for PR-1 is calculated at 24.3 but the Pre hydrographs are computed with a TC of 23.4. Revise the calculations to be consistent. 8. On sheet C.2-65, the Detention Basin Outlet Structure top of grate and outfaill pipe are inconsistent between the report information and the Detention Basin 1 cross section detail.Revise details and/orreport to be consistent. 9. Provide the Pond report for the Basin-1 Emergency Spillway routing on B53 of the report. 1o.Provide the Pond report for Hydrograph 9, JB-18 to Split Flow. 11. On sheet C.2-65, include the invert of the 12" pipe on the JB-18 Detail. Ensure the invert from MH 17 to JB 18 is consistent between the profile and the detail. 12.On sheet C.2-65, The invert of JB-20to ES21 is 306.14 on the detail and 307.07 on the profile. Understanding that the top of the "Tee" is 307.07, add notes to the profile to clarify the "Tee" invert and adjust the slope between JB 20 and ES 21. 13. Label and dimension the infiltration setbacks around Tp-1 and Tp-2. 14.The retaining wall with scuppers appears to drain onto a 2:1 slope. Provide erosion protection in this area. 15. it appears there is a "drive" area going into the detention basin area. Label the use for this areaand provide erosion control if applicable. 16. The paved area for vehicular circulation is extended to the building face in areas where there are man doors located. How will pedestrians be protected from conflicts with vehicles when they exit the buildings? SDF SDEfile#21-0024-0721 Kevin Manmiller/Applicant Kim Fastnacht/Applicant's Engineer Eugene Orlando,Jr./Township Solicitor MaidencreekTownship Planning Commissioners Cc: Township Planning Consultant PhilipJ.Ashear SYSTEMSDESIGN ENGINEERING,INC. Sincerely, pass the drainage area without ponding more than 3 inches. 19. There is a large drainage area flowing to inlet I-8A. Provide calculations that the grate can within thegrass for the storm flow to cross prior to flowing down the steep slopes. slope which could cause erosion gullies. The designer may want to provide a leveling area 18. The sheet flow from the south and west paved areas is sheet flowing directly to a 2:1 area to the building will be accomplished. accessible aisle. Provide additional notes as to how the accessible route from the parking 17. The curb line along the northern part of the parking area appears to run through the PreliminaryPlan Review Page 11 of 11 GiorgiMushroom Co. Re: March3,2021 Maidencreek Township Planning Commission Chk # Billed/Paid Paid Paid Paid Paid Fee Paid to 968.00 $2,105.00 Applicant Date By $1,500.00 $570.00 SEO annual report-2/24/21-Deliver necessaryfilework toTownship 1/27/21 - Review sewage pianning module. Sign SEO portion and 2/3/21 - Review/sign module. Hand off to TSU for municipal 12/10/20- Observe additional soil probes per planning module Maidencreek Road; Developer wants to create 3 lots and one 1/14/21-Review design/issue permit for new septic system 6/2/20 - Rec incomplete planning module. Send letter to MAIUENCKEEK IUWNSHIP 872Park Rd - Issue permit for septic system SEOACTIVITYREPORT 2/19/21-Discussplanningmodulew/TsU Applicant/Activity February, 2021 9/23 & 9/24/20 - Observe soil probes. 9/25/20 - Observe percolation testing. Reschedule fieldwork due to snow. , filing, reports 63 Hecktown Road residual lot (4 total). comment ASAP. requirements. of the farm. signatures. Misc admin, consultant. design. JoJaz Subdivsion Subdivision Z165738 Z210426 App. # General 15-0019-0470 20-0019-0485 20-0019-0481 20-0019-0487 T. Unger 2 copies SDE # 21-0019-0300 21-0019-0302 SEO Desk Cc: