MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
MARCH 11,2021
ENGINEER'SAGENDA
Subdivision Review Status Checklist
Next Supervisors Meeting April 8, 2021.
All plans current.
Subdivision / Zoning / LDP
KopferPlanning Module approval.
Giorgi Mushroom zoning hearing March 15.
Kopfer final plan, see SDE March 3, 2021 review Itr; no action.
Giorgi Mushroom Prel.Plan, see SDE March 3, 2021 review Itr; no action.
Projects
Street Projects 2021
Scope of work under review with Twp. Manager and Road Foreman.
Tree tops subdivision streets
Storm water basin inspection -- Inspections to continue; weather dependent.
Storm Damage
Storm water committee first mtg.March 8, 2021
Rt.222 parking study
Getting PennDOT guidance/requirements
SubdivisionImprovementLOC/EscrowRelease
None
Sewage Enforcement Officer Activity Report
See Attached
Page1of1
I:\Projects\MaidencreekTownship/21-0019-0100\Engineer'sAgendal03.11.21.docx

No.
I:/ProjectsIMaidencreek Township PCISubdivision StatuslSubdivision Status Checklists/20213.3.2021
Redner's Quickshop and Car Wash Prelm Plan
Project Name
David Kopfer Subdivision
Jojaz Subdivision
Giorgi Mushroom Co
100 White Star Road
APPROVED/PENDINGPLANS:
CURRENT PLANS:
Prelim Plan
Sketch Plan
Prelm/Final
Plan Stage
Final Plan
Plan
Review Period
06/03/20
06/03/20
03/03/21
06/03/20
Begins
90-Day
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
Period Ends
SUBDIVISION STATUS
06/01/21
09/01/20
09/01/20
09/01/20
Review
90-Day
3/3/2021
than one extension)
3/1/2021 6/1/2021
(may reflect more
11/30/2020
5/31/2021
12/1/2020
2/28/2021
Extension
12/01/20
BY BOS
Approved
11/12/20
Plan approval 11/12/20. Waiting
90 period will begin with
Zoning Appeal.
BOS granted conditional Prel.
Zoning Variance granted
on HOP and court date for
Preliminary or Final Plan
DEP
Planning Module submitted to
Comments
Letter Date
Most Recent
10/7/2020
3/3/2021
11/3/2020
3/3/2021
1/6/2021
Review

3850-FM-BCW0355Rey.5/2016
COMMONWEALTHOFPENNSYLVANIA
pennsylvania
DEPARTMENTOFENVIRONMENTALPROTECTION
DEPARIMENTOFEVIRONMENTAL
BUREAU OF CLEAN WATER
PAOTECTION
TRANSMITTALLETTER
FOR SEWAGE FACLITIES PLANNING MODULE
DEPARTMENTOFENVIRONMENTALPROTECTION(DEP)USEONLY
DEPCODE
CLIENTID#
A3 -00992-19-
SITEID*
APSID
AUTH. ID #
TO: Approving Agency (DEP or delegated local agency)
Date
AVE
Dear Sir/Madam:
DAUID KePFER
(Name)
for
(Title)
a subdivision, cammsrcialorindustriat facifity located in
MHiORNCREEK
(Nama)
BhDks County.
(City,Borough,Township)
Check one
proposed  revision  supplement for new land development to its Official Sewage Facilities Plan (Official
Plan), and is  adopted for submission to DEP  transmitted to the delegated LA for approval in accordance
with the requirements of 25 Pa. Code Chapter 71 and the Pennsylvania Sewage Facilities Act (35 P.S. s750),
OR
I (ii) The planning module wil not be approved by the municipality as a proposecl revision or supplement for new
land development to is Oficial Plan because the project described therein is unacceptable for the reason(s)
checked below:
Check Boxes
Additional studies are being performed by or on behaff of this municipality which may have an effect on the
planning module as prepared and submitted by the applicant. Attached hereto is the scope of services to
be performed and the time scheduie for completion of said studies.
The planning module as submitted by the applicant fails to meet limitations imposed by other iaws or
25 Pa. Code Chapter 71). Specific reference or applicable segments of such laws or plans are attached
hereto.
Other (attach additional sheet giving specifics).
approving agency.
Resolution of Adoption
Sewage Collection/Treatment Facilities
Module Completeness Checklist
14A Municipal PlanningAgencyReview
3s Small Flow TreatmentFacilities
12IndividuaiandCommunityOnlot
4B CountyPlanning AgencyReview
Disposalof Sewage
4C CountyorJointHealthDepartment
Review
Municipal Secretary (print)
Signature
Date

Telephone
Governing Body
Seal of
Municipal Address:
20
adopted,
the Township (Borough) (City) Resolution #
 Secretary.
attached hereto.
finds that the subdivision described in the attached
municipality
WHEREAS.
other, (please specify).
new
, and described in the attached Sewage Facilities Planning Module, and
nameof subdivision
has proposed the development of a parcel of iand identifiedi as
land developer
WHEREAS
WHEREAs Section 5 of the Aci of January 24, 1966. P.L. 1535, No. 537. known as the Pennsylvania Sewage
ADRUCEEEK
(TOWNSHIP) (BEROLIG(eTTY),
FOR NEWLAND DEVELOPMENT
RESOLUTION FORPLANREVISION
43-0942-119-2
BUREAUOF CLEANWATER
DEPARTMENTOFENVIRONMENTAL
PROTECTION
DEP Code No.
DEPARTMENTOFENVIRONMENTALPROTECTION
COMMONWEALTH OFPENNSYLVANIA
3850-FM-BCW0356ReV.5/2016

SYSTEMSDESIGN
SDE
ENGINEERING,INC
sdei net
March 3,2021
Maidencreek Township Manager
1 Quarry Road
Blandon,PA19510
Re:
David Kopfer Lot 2Subdivision
Final Plan Review
Ms.Hollenbach:
Systems Design Engineering, Inc. is in receipt of a Final Plan entitled "David Kopfer Lot 2." The
on the northeast side of Pleasant Hill Road. The second is the smaller portion that is located on
the southwest side of Pleasant Hill Road at the intersection with Hoch Road. The Plan was
prepared by Tarson, LLC. The submission consisted of the following:
Sheet 1of 1
Final Plan
Dated1/24/2020,rev.1/19/2021
E&S Plan
Sheet 1of 3
Dated1/24/2020,rev,1/19/2021
E&SPlan
Sheet 2 of 3
Dated1/24/2020,rev.1/19/2021
E&SPlan
Sheet 3 of 3
Dated4/20/2020,rev.1/19/2021
Sewage Planning Module
Dated 2/16/2021
Stormwater Analysis
Dated 2/10/2021
Response Letterto SDEreview
Undated
Berks County Conservation District Letter
Dated6/1/2020
BACKGROUND:
The purpose of the plan is to subdivide an existing tract that is zoned for Agricultural Preservation
(AP). The tract consists of two (2) portions that are deeded together and currently total 103.1
acres in size. The smaller of the two portions would be subdivided. The subdivision would create
a 1.65-acre flag lot that would be used for single-family residential. The new lot would have
access to Hoch Road via a flag lot access strip and would not have access to Pleasant Hill Road.
The lot is to be served by private well and on-lot sewage disposal.
I:/Prpjects/MaidencreekTownshipPC120-0024-0718David Kopfer SubdivisionlSubdivision Review#2.docx
1032James Drive, Leesport, PA19533P:610.916.8500F:610.916.8501
SchuylkillHaven,PA.P:570.385.5549
Boyertown,PAP: 610.369.1319

SDE
as exempt from Standard procedures. The plan title should be updated.
Per Subsection A, a plan must be labelled as a Final Plan to be considered
procedures.
The Applicant intends the submitted plan to be considered exempt from standard
1. Per $190-29, Plans Exempt from Standard Procedures
SALDO:
frontage as shown on the plan and to allow the proposed flag lot.
Addressed. Relief was granted on November 17, 2020 to allow the road
The required road frontage is 150 feet.
proposed lot size of 1.65-acres is necessary due to on-lot sewage planning.
The lot area must be 1.5 acres in size.
2.Per 5220-17,Area and Bulk Regulations
Farm Actdisclosure.
subject to the stipulations of Section $220-17, which includes the 1982 Right-to-
Single-family residential is permitted in the Agricultural Preservation District
1. Per 5220-16, Permitted Uses
Additional comments arepresented below.
residence.
The property is located in the Ap -- Agricuitural Preservation District. The use of the proposed
ZONING:
the criteria of "Plans Exempt from Standard Procedure."
This letter presents comments on the second review of the proposed subdivision. This plan fits
REVIEW:
Final PlanReview
Page 2 of 7
David Kopfer Subdivision
Re:
March3,2021
MaidencreekTownshipPlanning Commission

MaidencreekTownship Planning Commission
March 3, 2021
Re:
David Kopfer Subdivision
Page 3 of 7
Final PlanReview
Addressed.The planis now labelled a Final Plan.
Per Subsection E(3),the plan must show compliance withArea and Bulk
requirements.
Addressed. The plan complies withArea and Bulk requirements
nowthat zoning relief was granted.
2. Per $190-33, Driveways
Per subsection A(2), at least the first twenty (20) feet of driveway must be paved,
starting at the edge of the cartway.
oAddressed. A note was added to the plan stating that the first twenty (20)
feet of driveway will be paved,
A clear sight triangle should be added to the plan for the proposed driveway.
o Addressed.
applicant and shall be prepared by a professional engineer licensed as such by the
Commonwealth of Pennsylvania.
SEWAGE ENFORCEMENT:
1. The proposed on-lot sewage system utilizing spray irrigation is under review by the
Township. The Sewage Facilities Planning Module will be sent to DEP for review and
approvalas appropriate.
STORMWATERMANAGEMENT:
1.Per 5182-11, Erosion and Sediment Control -- The Erosion & Sediment Control Plan should
be submitted to the Berks County Conservation District for review and approval. A copy
of the approval letter should be submitted to the Township.
Addressed.A copy of the approval letter has been submitted.

SDF
include that "Either Proposed Lot 2 or the remaining lands may use the remaining
impervious cover being approved for Lot 2. The note needs to be revised to
Partially addressed: Note 5 has been added to the plan regarding the proposed
remaining allowable impervious cover for any future dwelling unit construction.
total new impervious cover on the parent tract. if an exemption is requested, the plan
from the drainage plan requirements, which allows a maximum of 15,o00 square feet of
5. Per $182-21.B.(1), Exemptions --The project meets the requirements for an exemption
16.
Addressed: An exemption has been requested for an allowable 15,o00 sf of
Comment below for 182-21, Exemptions.
However, an exemption from this section of the ordinance would be applicable; see
be increased as a result of the proposed driveway and house construction, and based on
located in Management District B2 which requires post-development site runoff to be
4. Per §182-16, Stormwater Management Districts -- The property being developed is
Outstanding: See Item 10 of this section.
requirement.
1-yr pre-development rate. The designer should contact our office to discuss this
3. Per $182-15, Streambank Erosion Requirements -- The current design does not meet the
.Addressed.
theberm/basin.
The design infiltration rate should be based only on the tests located in close proximity to
Addressed. Test pit numbers are consistent with the Soil Testing Report.
three (3)test locations shownontheplan.
correspond to the test pit numbers in the Soil Testing Report. It appears there are only
2. Per 182-13.B, Groundwater Recharge -The test pit numbers on the plan should
FinalPlanReview
Page 4 of 7
DavidKopferSubdivision
Re:
March 3, 2021
MaidencreekTownshipPlanning Commission

MaidencreekTownshipPlanning Commission
March3, 2021
Re:
David Kopfer Subdivision
Page 5 of 7
Final Plan Review
exemption only applies to the rate caiculations. Groundwater recharge, Water
Quality, and Streambank Erosion controls must be addressed at that time".
Based on the computations submitted, the streambank erosion peak rate reduction must
still be addressed.
Addressed.
6. Per 182-22.B.(22), Drainage Plan Contents -A note should be added to the plan and
signed by the landowner acknowledging that any revision to the approved drainage plan
$182-22.E.(2)(d).
Addressed. A signature block has been added to Sheet 1 of 1 Final Plan.
7.Per§182-22.D.(1)--The following construction details should be provided:
1)Infiltrationberm/basincross-section
2) Emergency spillway
Partially addressed: A detail has been provided for the berm cross-section that
includes the elevation for top of berm and the emergency spillway. Provide the
top width of the berm as well as the width of the emergency spillway on the detail
and the pians. Label the spilway on the plan set and revise grading to show basin
grades at a 4:1 side slope. Add a note stating "All basins shall be structurally sound
and shall be constructed of durable materials" and,"Embankments shall be placed
in maximum eight-inch lifts to a minimum of 95% of maximum dry density, as
establishedbyASTMD-1557"per182-17.C(7).
8. Per $182-32 and $182-34, Operations and Maintenance Agreement for Privately Owned
Stormwater Controls and BMPs --The Stormwater Management Controls and Best
Management Practices Operations and Maintenance Agreement in Appendix Aof the
Stormwater Management Ordinance should be submitted for review and approval by the
Township.
Outstanding:The Operations and Maintenance Agreement shall be submitted for
review and approval.

SDE
cultivation is prohibited.
should include any restriction to cultivation. Markers may need to be placed in the field if
1. The applicant should address any restriction in use within the nitrate easement. This
MISCELLANEOUS:
driveway radius or flared construction.
point of intersection with the cartway edge. Revise the plan and detail to show the
five feet or shall have a flare construction that is equivalent to this radius at the
Outstanding: Driveway entrances shall either be rounded at a minimum radius of
Partially addressed: A driveway paving cross-section has been added to the plans.
1. A driveway cross-section and paving detail should be provided.
MISCELLANEOUS DRAFTING COMMENTS:
documentation that the basin will empty within four days.
11. Per 182-13.D.A(2)(c), the infiltration facility shall be capable of completely infiltrating the
increased on the adjacent property owners.
discharge criteria specified in this chapter. Provide calculations that runoff is not
permission of the affected property owner(s) and shall be subject to any applicable
property shall not be altered in any manner which could cause property damage without
Addressed. Note 6 has been added to sheet 1 of 1 Final Plan.
note on the Cover Sheet providing a blanket easement is acceptable.
should be provided to allow access for inspection, maintenance or preservation of the
9. Per s182-33, Stormwater Management Easements -Stormwater management easements
added to sheet 2 of 3 of the E & S Plan.
should be noted on the plan.
The long-term operations and maintenance requirements for the infiltration berm/basin
Final PlanReview
Page 6 of7
David Kopfer Subdivision
Re:
March 3, 2021
MaidencreekTownshipPlanning Commission

Maidencreek Township Planning Commission
March3,2021
Re:
David Kopfer Subdivision
Page 7of 7
FinalPlanReview
Addressed. Nitrate easements are not required on spray irrigation systems.
2. Township and DEP approval for an on-lot system should be obtained prior to Final Plan
approval of the subdivision plan.
Outstanding: Will remain until the approval has been received.
3. The applicant may need to amend the proposed boundaries of the nitrate easement to
the satisfaction of DEP.
Addressed. Nitrate easements are not required on spray irrigation systems.
4. Final Pian ordinance requirements are on shown Final Plan, Sheets 1 of 1, and on E & S
Pians, Sheets 1-3 of 3,. All plans should be recorded to ensure all relevant information is
recorded. Include a note on Sheet 1 of 1 that reflects sheet numbers to be recorded.
5. The rear and front yard setback should be shown the full width of the lot until they
intersect with the sideyard setback.Revise the plans.
6.Note8is subjecttoDEP Planning Moduleapproval.
7. Add a note to the plan at the intersection of the driveway and Hoch Road stating that the
driveway shall be graded to prevent water runoff onto the cartway.
If you should have any questions or comments,please do not hesitate to contact our office
Sincerely,
SYSTEMS DESIGN ENGINEERING,INC.
PhilipJ.Ashear
Township Planning Consultant
Cc:
MaidencreekTownshipPlanningCommissioners
Eugene Orlando,Jr./Township Solicitor
Dan Laudenslayer/Applicant's Surveyor
David Kopfer / Appicant (via mail)
SDE

Boyertown, PA . P: 610.369.1319
Schuyikill Haven,PAP:570.385.5549
2/16/2021
C.2-64
PCSM Details
2/16/2021
C.2-63
PCSM Plan -Sheet 2 of 2
2/16/2021
C.2-62
PCSM Plan-Sheet 1of 2
2/16/2021
C.2-61
Pre-construction Conditions Plan - Sheet 2 of 2
2/16/2021
C.2-60
Pre-constructionConditionsPlan-- Sheet1of2
2/16/2021
C.2-03
Grading Plan - Sheet 3 of 3
2/16/2021
C.2-02
Grading Plan - Sheet 2 of 3
2/16/2021
C.2-01
Grading Pian --Sheet 1 of 3
2/16/2021
C.1-52
Demolition Plan
2/16/2021
C.1-51
Existing Conditions and Site Analysis -- Sheet 2 of 2
2/16/2021
C.1-50
Existing Conditions and Site Analysis - Sheet 1 of 2
2/16/2021
C.1-03
Site Plan  Sheet 3 of 3
2/16/2021
C.1-02
Site Plan - Sheet 2 of 3
2/16/2021
C.1-01
SitePlan-Sheet1of 3
2/16/2021
C.0-02
Legends and Notes
2/16/2021
C.0-01
Cover Sheet
Date
Dwg No.
Title
Stormwater Management report and the following:
neighboring parcel to the south and another on June Ave via an access easement thought the
Co." The site has two (2) access points; one on Park Road via an access easement through the
Ms. Hollenbach:
Preliminary Plan Review#1
Giori Mushroom Co.
Re:
Blandon,PA19510
1 Quarry Road
Maidencreek Township
Diane Hollenbach,TownshipManager
March 3, 2021
sdei.net
ENGINEERING,INC
SDE
SYSTEMSDESIGN

MaidencreekTownshipPlanning Commission
March3,2021
Re:
GiorgiMushroom Co.
Page2of 11
Preliminary Plan Review
C.2-65
PCSM Details
2/16/2021
C.2-66
PCSM Plan Details and Notes
2/16/2021
C.3-01
Utility Plan - Sheet 1 of 2
2/16/2021
C.3-02
Utility Plan - Sheet 2 of 2
2/16/2021
C.4-01
Drive A, Storm Sewer and Sanitary Profiles
2/16/2021
C.4-02
Drive B and Sanitary Profiles
2/16/2021
C.4-03
Cross-Country Storm Sewer Profiles
2/16/2021
C.4-04
Cross-Country Storm Sewer, Sanitary and Process Waste Profiles
2/16/2021
C.6-01
Site Construction Details -- Sheet 1 of 2
2/16/2021
C.6-02
Site Construction Details -Sheet 2 of 2
2/16/2021
EL.1-01
Electrical Site Lighting-Overall Plan
2/16/2021
EL.1-02
Electrical Site Lighting- lumination Point by Point -- Part One
2/16/2021
EL.1-03
Electrical Site Lighting- Ilumination Point by Point -- Part Two
2/16/2021
EL.4-01
Electrical Site Lighting-Lighting Fixture Cutsheets
2/16/2021
BACKGROUND:
The purpose of the plan is to establish a 169,830.5 square foot building that will be used for a
mushroom farm. The building would be constructed in three (3) phases and would have access
to Park Road via the adjacent parcel. The subject site is zoned I -- Industrial while the neighboring
parcel that would include the access drive is zoned SlA -- Special Intensified Agriculture.
REVIEW:
This letter presents comments on the flrst review of the submitted Preliminary Plan.
ZONING:
The subject site is located in the I-lndustrial Zoning District while the access drive is located in the
SIA-Special Intensified Agriculture Zoning District.
1.Per$220-48,PermittedUses
The applicant's interpretation of"front yard,""side yard," and"rear yard" is
unclear. The required front yard setback is 4o feet and the front setback line
should be added to the plan. Clarification should be provided.
SDE

add it tothe Zoning Requirements table.
for the proposed use is unclear. The applicant should justify the parking count and
35 parking spaces are provided, including 2 ADA spaces. The parking calculation
3.Per $220-61, Parking and Truck Loading Requirements
demonstrate conformity with this section.
building shall be specified and added to the Zoning Requirements table to
except that the setback requirement for the accessory structure shall not have a
Accessory structures for agriculture are exempt from the height requirement
Therefore, this section applies.
According to the Special Exception granted in 2003, the use of the subject site for
2.Per $220-58, AccessoryUses andStructures
also be provided.
Information regarding the principal use on the neighboring parcel should
Zoning District.
an accessory use on an adjacent lot should be evaluated. See section s220-
prior application to the ZHB. The request for a Special Exception to allow
conforming use" is not appropriate. The applicant should investigate the
conforming use.
seeking a decision that the use of the property for mushroom farming is a non-
The current ZHB application dated January 29, 2021 states that the applicant is
special exception.
that accessory uses on a separate lot from the principal use are permitted by
A Special Exception was granted in 2003 to allow mushroom farming as an
speciat exception or conditional use in the Industrial Zoning District.
Agricultural use. Mushroom farming is not listed as a use permitted by-right,
District; however, the mushroom farm use is considered a Special Intensified
Per subsection A(14), general agriculture is a permitted use in the Industrial Zoning
Preliminary Plan Review
Page3 of 11
GiorgiMushroom Co.
Re:
March3,2021
MaidencreekTownship Planning Commission

MaidencreekTownshipPlanning Commission
March3,2021
Re:
GiorgiMushroomCo.
Page 4of 11
PreliminaryPlanReview
Loading spaces are not shown on the plan. The loading space count should be
justifiedand shownontheplanwith12'by50'spaces.
LIGHTINGSTANDARDS:
1.Per$186-47,Design and Performance Criteria
Per subsection A(1), the minimum average maintained footcandle is 2.0 for a 4:1
uniformity ratio, The applicant shall add the average maintained footcandle to the
plan and state the uniformity ratio.
Per subsection B(3)(b)[1], lighting not used for security shall be switched off
between11:00pmanddawn.
Per subsection B(3)(b)[2], a note shall be added to the plan stating that all-night
security lighting will not exceed 25% of normal levels.
SALDO:
1.Per$190-15,PreliminaryPlanRequirements
Per Subsection C,the plan shall be sealed bythe professional responsible for the
plan, prior to Final Plan approval.
Per subsection G,provide all existing easements including the access easement
and the existing encroachment easement.
Per subsection I(2), provide the Special Exception request on the cover sheet.
Per subsection N(1), provide the location and width of all proposed rights-of-way,
utility easement locations, and a statement of any conditions governing their use.
Per subsection N(2), provide the building setback lines along Route 222,if
appropriate.
2.Per s190-16, lnformation to accompanypreliminary plan
Per subsection F(1),provide tract boundary with bearings and distances.
Per subsection F(9),provide existing uses on surrounding properties.

SDE
Township shall be installed within 6oo feet of all existing and proposed structures,
provided, fire hydrants suitable for the coupling of equipment serving the
Per subsection D, fire hydrants, wherever a public or community water system is
watercapacityfortheproposed use.
maintenance of such distribution system. Provide supporting documentation of
establishedforthedesign,specifications, construction, ownership,and
shall be submitted with the final plan. Suitable agreements shall also be
specifications of the Middle Department Association of Fire Underwriters. A copy
each lot, with adequate main sizes and fire hydrants located to meet the
distribution system shall be designed to furnish an adequate supply of water to
system is geographically and economically accessible to a proposed subdivision, a
5.Per 190-40, Water supply
proposed building use,
sewage treatment plant is designed to process the additional flows of the
the maintenance thereof. Provide supporting documentation that the existing
Protection and such system shall be further subject to satisfactory provision for
subject to the approval of the Pennsylvania Department of Environmental
Per subsection G.(1), the design and installation of a community system shall be
4.Per190-38, Sanitarysewage disposal
existingdrivefromParkRoad.
bays and turnaround areas. Provide dimensions on the drive areas including the
Per subsection A(5), driveways to serve commercial and industrial uses shall have a
3. Per $190-33, Driveways
Per subsection l, provide a Water resources study.
sewage treatment plant.
Township. Provide supporting documentation regarding the usage of the existing
all residents of such subdivision or land development and not deeded to the
development which proposes land or facilities to be owned or used in common by
Per subsection G (1), a trust agreement shall be created for any subdivision or land
Preliminary Plan Review
Page5of 11
Giorgi Mushroam Co.
Re:
March 3, 2021
MaidencreekTownship Planning Commission

Maidencreek Township Planning Commission
March3,2021
Re:
GiorgiMushroomCo.
Page 6 of 11
PreliminaryPlanReview
such distance to be measured by way of accessible streets (as specified by the
Middle Department Association of Fire Underwriters). Hydrant locations shall be
selected upon consultation with the initial response fire company for the
development and shall be approved by the Maidencreek Township Water
Authority.
6.Per$190-41,ErosionControl
Per subsection C, provide supporting documentation that the project meets the
standards and specifications of the Berks County Conservation District and the
guidelines under Chapter 102 of Administrative Code Title 25 for the Pennsylvania
DepartmentofEnvironmentalProtection.
7. Per$190-42, Storm Drainage
Per subsection C(11), all developments must also include design provisions that
allow for the averland conveyance of the post Qioo year storm flows through the
site without damage to any private or public property. Provide 10o year drainage
calculations for Swale #1 to ensure it can convey the 1oo year storm flow.
Per subsection F(i)(c), an access easement shall be provided for all detention
basins.
Per subsection F(2)(b), a method of carrying low fiow through the basin area shall
be provided. Provide additional information on how the detention basin meets this
requirement.
Per subsection F(2)(d), the storage duration shall not exceed 24 hours after rainfall
has ceased, Provide dewatering information for the basins.
Per subsection F(2)(f), basins shall have provisions for de-watering, particularly the
bottom, and shall not create swampy or otherwise unmaintainable conditions.
Per subsection F(4)(f), a minimum one-foot freeboard above the maximum design
water surface elevation at the emergency spillway shall be provided. The
infiltration basins do not have 1' of freeboard over the maximum design water
surface elevation. Revise to meet this requirement.
Per subsection G, the preliminary plan shall reflect or be accompanied by
documentation identifying the ownership of and the method of administering and

to be utilized for infiltration.
infiltration basins. Provide clarification if the flat bottom of the detention basin is
Per subsection C.(2), provide loading ratio calculations forthe bottoms of the
flow to be infiltrated has been pretreated.
Per subsection A.(2)(d), provide supporting documentation that the volume of
(infiltration) volume within four days (96 hours).
infiltration facility is capable of completely infiltrating the required retention
Per subsection A.(2)(c), provide dewatering calculations showing that the
3. Per g182-13, Groundwaterrecharge
to maintain maximum infiltration capacity.
be protected from sedimentation and compaction during the construction phase
Per subsection F. (1), provide a note that areas proposed for infiltration BMPs shall
.Per subsection C, under 25 Pa.Code Chapter 92, a DEp"NPDES construction
2. Per g182-11, Erosion and Sediment Control
watercourses.
drainage easements shall be provided conforming to the line of such
Per subsection F, where a development site is traversed by existing watercourses,
1. Per 5182-9,General Requirements
STORMWATER MANAGEMENT:
Provide the methodology that will be utilized.
by dedication to the Township, Maintenance by a private entity or by agreement.
site, Also, Ownership, administration, and maintenance of these facilities shall be
Management Maintenance. Revise the note to specific to the locatlon of project
their design capacity. There is a note on the cover sheet regarding Stormwater
facilities to be owned by the developer or his assigns shall be maintained to retain
PreliminaryPlan Review
Page7of11
Giorgi Mushroom Co.
Re:
March 3,2021
MaidencreekTownshipPlanning Commission

MaidencreekTownshipPlanningCommission
March 3,2021
Re:
GiorgiMushroom Co.
Page8of 11
PreliminaryPlanReview
4.Per$182-15,Streambankerosion
Per subsection A., provisions shall be made (such as adding a small orifice at the
bottom of the outlet structure) so that the proposed condition one-year storm takes a
minimum of 24 hours to drain from the facility from a point where the maximum
volume of water from the one-year storm is captured. Provide supporting
documentation that the one-year storm takes a minimum of 24 hours to drain.
5.Per s182-17,Design criteriafor stormwater management and conveyance BMPs.
Per subsection C.(8),all basins not including groundwater recharge and/or water
quality storage shall include an outlet structure to permit draining the basin to a
completely dry condition within 24 hours following the end of the design rainfall.
Provide dewatering calculations.
Per subsection C.(11), iow flow channels shall be provided from each water-carrying
facility to the outlet structure for all basins that do not include groundwater recharge
and/or water quality storage. Low flow channels shall be 1% minimum slope and shall
be designed to enable ease of maintenance. Provide low flow channels in the
detention basin if it is not to be used for recharge or water quality.
Per subsection C.(12), minimum slope within a basin that does not include
groundwater recharge and/or water quality storage shall be 2% positive grade to the
lowflowchannel.
must have watertight joints.
sewer pipes, culverts. Provide Energy dissipater sizing calculations and include a detail
on the plan.
6.Per$182-22,Drainageplancontents
Per subsection A.(4), provide an Erosion and Sediment Control Plan.
Per subsection A.(19),provide a twenty-foot-wide access easement around all
stormwater management facilities that would provide ingress to and egress from a
public right-of-way.
SDE

Commonwealth to reflect the current project information.
4. On sheet C.2-66, update the Soils Information and the Receiving Waters of the
along the retaining wall.
existing gravel drive. Include the area in which the gravel drive is to be reconstructed
3. Delineate the location of the gravel and paved areas in the project site and along the
should.be shown on theplan.
The 2005 plan also showed an access easement to Park Road. This easement
most recent plans.
structure that crossed parcel lines. That easement should be shown on be shown on the
2. The recorded plan in 2005 showed a fifty (50) foot encroachment easement for a
analysis - sheet 2 of 2."
GENERAL:
requested waivers.
regard to plan scale and profile scale, respectively. The Planning Commission should
1. The applicant is requesting Waivers from Sections $190-14.A(3) and 190-16.B with
WAIVERS:
controls.
for the timely installation and proper construction of all stormwater management
Per subsection A, provide a financial guarantee to the Township of Maidencreek
7.Per 182-30, Performance guarantee
with $182-31.
Per subsection C.(1)(f). provide an operation and maintenance plan in accordance
by the Township of Maidencreek and the Conservation District.
acknowledging that any revision to the approved drainage plan must be approved
Per subsection A.(22), provide a statement, signed by the landowner,
PreliminaryPlanReview
Page 9of 11
Giorgi Mushroom Co.
Re:
March 3, 2021
MaidencreekTownshipPlanningCommission

MaidencreekTownshipPlanning Commission
March 3, 2021
Re:
GiorgiMushroomCo.
Page 10of 11
PreliminaryPlanReview
5. On sheet DA.1, it appears that Basin 2 and 3 drainage areas do not include the linear area
along the northern property line (just north of the detention basin) and the paved drive
that runs west from the detention basin spillway although they are labeled as B2 and B3,
respectively. Revise the drainage divides to reflect the full drainage areas to the basins.
6. On Sheet DA.1, the Time of concentrations for Basins A and B should begin at the top of
the embankment of the detention basin. Revise the TC path and update the values in the
report.
7.The TC for PR-1 is calculated at 24.3 but the Pre hydrographs are computed with a TC of
23.4. Revise the calculations to be consistent.
8. On sheet C.2-65, the Detention Basin Outlet Structure top of grate and outfaill pipe are
inconsistent between the report information and the Detention Basin 1 cross section
detail.Revise details and/orreport to be consistent.
9. Provide the Pond report for the Basin-1 Emergency Spillway routing on B53 of the report.
1o.Provide the Pond report for Hydrograph 9, JB-18 to Split Flow.
11. On sheet C.2-65, include the invert of the 12" pipe on the JB-18 Detail. Ensure the invert
from MH 17 to JB 18 is consistent between the profile and the detail.
12.On sheet C.2-65, The invert of JB-20to ES21 is 306.14 on the detail and 307.07 on the
profile. Understanding that the top of the "Tee" is 307.07, add notes to the profile to
clarify the "Tee" invert and adjust the slope between JB 20 and ES 21.
13. Label and dimension the infiltration setbacks around Tp-1 and Tp-2.
14.The retaining wall with scuppers appears to drain onto a 2:1 slope. Provide erosion
protection in this area.
15. it appears there is a "drive" area going into the detention basin area. Label the use for
this areaand provide erosion control if applicable.
16. The paved area for vehicular circulation is extended to the building face in areas where
there are man doors located. How will pedestrians be protected from conflicts with
vehicles when they exit the buildings?

SDF
SDEfile#21-0024-0721
Kevin Manmiller/Applicant
Kim Fastnacht/Applicant's Engineer
Eugene Orlando,Jr./Township Solicitor
MaidencreekTownship Planning Commissioners
Cc:
Township Planning Consultant
PhilipJ.Ashear
SYSTEMSDESIGN ENGINEERING,INC.
Sincerely,
pass the drainage area without ponding more than 3 inches.
19. There is a large drainage area flowing to inlet I-8A. Provide calculations that the grate can
within thegrass for the storm flow to cross prior to flowing down the steep slopes.
slope which could cause erosion gullies. The designer may want to provide a leveling area
18. The sheet flow from the south and west paved areas is sheet flowing directly to a 2:1
area to the building will be accomplished.
accessible aisle. Provide additional notes as to how the accessible route from the parking
17. The curb line along the northern part of the parking area appears to run through the
PreliminaryPlan Review
Page 11 of 11
GiorgiMushroom Co.
Re:
March3,2021
Maidencreek Township Planning Commission

Chk #
Billed/Paid
Paid
Paid
Paid
Paid
Fee Paid to
968.00
$2,105.00
Applicant
Date By
$1,500.00
$570.00
SEO annual report-2/24/21-Deliver necessaryfilework toTownship
1/27/21 - Review sewage pianning module. Sign SEO portion and
2/3/21 - Review/sign module. Hand off to TSU for municipal
12/10/20- Observe additional soil probes per planning module
Maidencreek Road; Developer wants to create 3 lots and one
1/14/21-Review design/issue permit for new septic system
6/2/20 - Rec incomplete planning module. Send letter to
MAIUENCKEEK IUWNSHIP
872Park Rd - Issue permit for septic system
SEOACTIVITYREPORT
2/19/21-Discussplanningmodulew/TsU
Applicant/Activity
February, 2021
9/23 & 9/24/20 - Observe soil probes.
9/25/20 - Observe percolation testing.
Reschedule fieldwork due to snow.
, filing, reports
63 Hecktown Road
residual lot (4 total).
comment ASAP.
requirements.
of the farm.
signatures.
Misc admin,
consultant.
design.
JoJaz Subdivsion
Subdivision
Z165738
Z210426
App. #
General
15-0019-0470
20-0019-0485
20-0019-0481
20-0019-0487
T. Unger 2 copies
SDE #
21-0019-0300
21-0019-0302
SEO Desk
Cc: