Five Year Budget Presentation
- Date
- Date unknown
- Type
- Budget
- Year
- 2024
- File
- PDF · 1.5 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 3,577 words
10/16/2023 MAIDENCREEK TOWNSHIP FIVE YEAR FORECAST 2024 - 2028 1 Overview Description 2023 2024 2025 2026 2027 2028 January 1st $ 1,539,969 $ 508,649 $ (376,032) $ (1,655,364) $ (2,966,776) $ (4,981,161) Revenues $ 3,669,580 Expenditures $ 4,692,900 $ 3,068,387 $ 3,210,036 $ 3,139,166 $ 3,206,057 $ 3,372,037 December 31st $ 508,649 $ 3,953,067 $ 4,499,368 $ 4,682,636 $ 4,978,385 $ 5,276,095 $ (376,032) $ (1,655,364) $ (3,208,834) $ (4,981,161) $ (6,625,536) The size of these anticipated Decrease in Expenditures is Increase of Expenses deficits realistically removes due to lack of creek projects includes large increase in the option to use fund and lack of road work beyond balance to pass future Road Work with more budgets in the foreseeable Liquid Fuels Funds $300K+ in one year. future. 2 1 10/16/2023 What Happened in 2021 – 2023? • Federal American Rescue Plan Funds (ARPA) • Road Improvement Costs Increased • Disbursement #1 - $496,027.40 [2021] • $136,844.52 Increase for Road Widening • Disbursement #2 - $497,595.71 [2022] behind Lake Ontelaunee in 2022. • Added one-time revenues at a scale that is • $326,451.50 Increase for Ontelaunee unlikely to be matched, which distorts the Heights and Other Road Developments in picture. 2023. • Police Expenses Increased • Conditional Use on Warehouse • Maidencreek Township’s share of the total • $29,356.99 of bills in 2022 Police budget grew from 47.5% to 52.0% in • $77,928.40 of bills in 2023 the 2022 Budget, adopted in 2021. • Bills made up of non-reimbursable • $132,715.80 Increase in the 2022 Budget. Engineering and Legal Fees. • $180,730.89 Increase in the 2023 Budget. • Stream Cleanup Projects • Recycling Contract Increases • Projections are approximately $300K • $161,069.28 Increase in 2023 contracted recycling collections (121% Increase). Total 2022 Expenses = $ 298,917 Total 2023 Expenses = $1,046,180 3 Historical Comparison General Fund Balance • These cost increases have $1,800,000 occurred while revenues have not $1,600,000 had the same rate of increase. $1,400,000 $1,200,000 • The increases of spending in 2022 $1,000,000 and 2023 have been dedicated to the structural increases (ex. Police, $800,000 Recycling) and the one-time $600,000 expenses have mostly been dedicated to infrastructure. • This graph does not include Liquid $400,000 Fuels Funds which have been $200,000 dedicated to Road Work for much $- 2014 2016 2018 2020 2022 2024 of the time shown. However, these 2012 funds have not kept up with maintenance of Roads as required to maintain a strong network. 4 2 10/16/2023 Adjusted Deficits without ARPA Funds 2020: Audited Deficit (- $154,512) 2021: Audited Surplus ($555,228) – ARPA Disbursement #1 ($496,027) = $59,201 2022: Audited Surplus ($98,121) – ARPA Disbursement #2 ($499,164) = - $401,043 2023: Projected Deficit (- $1,023,320.32) • Operating Deficits • Structural Deficit = $524,515.97 [Approx.] • These revised surplus and deficit figures • 2022 Police Increase = $132,715.80 help show that expenses approved in • 2023 Police Increase = $180,730.89 previous years, beginning in 2021 began to • 2023 Recycling Increase = $161,069.28 erode the structural balance of expenses • 2023 Inflation & Wage Growth = $50K and revenues. [est.] • Expenses for 2021, 2020, and 2019 were • A structural deficit is a gap between known each slightly above $2.8 million. The expenses and revenues at the beginning to expenses in 2022 were $3.4 million and are the next year. projected to increase to nearly $4.7 million. 5 OUR SERVICES Road Work Public Safety Services Building, Codes & Taxpayers pay for a full-time Road Taxpayers pay for full-time police Zoning Regulation Crew that maintains the roads, coverage through our Regional Police, including removal of nuisances, for which Maidencreek contributes Taxpayers pay for the regulation of mowing of roadways, patching and about half of the budget. Taxpayers building in the Township to prevent maintenance, snow and ice removal, also contribute more than $230K unsafe conditions as well as to and the annual road bid for annually to the volunteer fire and control the impact of building on improvements. ambulance companies to keep them neighboring properties and the running. community at large. Recycling & Brush Stormwater Regulation Public Parks Collection Taxpayers pay for the regulation, planning, Taxpayers pay for the Township to Taxpayers pay for the bi-weekly and maintenance of the stormwater maintain and improve public parks as collection of recyclables for residences, infrastructure that is built by developers or an amenity that residents and other and the Township Road Crew also homeowners, as well as maintenance work folks can enjoy at their leisure. collects brush, leaves, grass through its the Township directly undertakes to keep recycling site on Rt. 73 as well as waterways flowing well. curbside collections several times a year. 6 3 10/16/2023 ** *General Fund Only ** Staff Recommends Reduction of Road Work, but it is included here to leave that decision to the Board. 7 Spending by Funds Types Fund Balance Reporting and Fund Type Definitions are defined in Semi-Discretionary Discretionary accounting by GASB* for the Township. However, these standards do not capture all limitations that are included in this 2023 Police Budget Amount General Government Supplies summary of funds by non-discretionary, semi-discretionary, or 2023 Active Township Staff IT Expenses discretionary (ex. Police Services). Yard Waste Host Fees Ambulance Subsidy ½ of Legal Services Fees Animal Control Non-Discretionary – Qualifies as restricted, committed, or ½ of Engineering Services Fees 2024 Police Subsidy assigned expenses under GASB or requires significant non- Gas & Diesel Fall Cleanup Day financial action by the BOS to change the required commitment Vehicle Maintenance & Repair 2024 Road Work (ex. streetlights or insurances). Employee Insurances Road, Curb, and Drain Supplies Water & Flood Improvement Funds Semi-Discretionary – Qualifies as unassigned fund balance, but Parks Supplies & Maintenance requires significant political decisions to adjust, some of which Library Contribution could be non-financial (ex. 2023 Police Budget funds and active New Mini-Excavator Lease municipal employees). Bridge Replacement Sinking Fund Discretionary – Qualifies as unassigned fund balance and is simple to reduce by the annual budget (ex. 2024 road work or supplies budgets). *(Government Accounting Standards Board) See Statement No. 54 8 4 10/16/2023 Reductions, Pt. 1 If the Board accepts that restrictions associated with the Non- Discretionary category, specifically those expenses not qualifying as restricted, committed, or assigned, the potential room for reductions is included here. All reductions effect the Township’s services and could be considered against the question “what is best for the residents?” Projected Budget Deficit for 2024: $1,275,577.11 Remaining Spending Elements General Government Public Safety Discretionary Sanitation Public Works Semi-Discretionary $200,000.00 $400,000.00 $600,000.00 $800,000.00 $1,000,000.00 $1,200,000.00 Water & Flood $- Community Dev. Parks & Rec. Debt Insurances Other 9 Reductions, Pt. 2 Within the Semi-Discretionary and Discretionary Description Amount ($) Categories are the expenses related to current staff. Manager’s Contract 87,808.10 Classification Full-Time Part-Time Less Than Part- Wages 490,685.76 Employee(s) Employee(s) Time [1] Health Insurance 136,083.46 Management 0 Employer Taxes & Fees Confidential 1 0 0 Workers Comp. 48,805.18 Non-Union 1 0 3 Life & Disability 25,000.00 Union (Eligible) 0 0 1[2] Dental Insurance 6 0 4 Vision Insurance 8,102.43 Total: 8 0 Other Benefits 6,439.00 1,156.32 Department Full-Time Part-Time Less Than Part- Total: 3,375.00 Employee(s) Employee(s) Time [3] 807,455.25 Administration 0 Crossing Guard 1 0 0.5 Facilities 0 0 1 Office Staff 0 0 1 Parks & Recreation 1 0 1.5 Public Works 0 0 0 6 0 4 Total: 8 0 [1] Less than part‐time includes Seasonal Employees and Irregular Employees (ex. Park Attendants, Emergency Management Coordinator) [2] New Position of Township Clerk [3] One Employee holds the position of Park Attendant and Crossing Guard, which is counted twice in the second table group as a half position to represent this person being one whole between both positions. 10 5 10/16/2023 Reductions, Pt. 3 If the Board accepts that there would be no reductions in current Police Spending or Personnel, there remaining spending is what you are left with below. All reductions effect the Township’s services and could be considered against the question “what is best for the residents?” Projected Budget Deficit for 2024: $1,275,577.11 Remaining Spending Elements General Government Public Safety Discretionary Sanitation Public Works Semi-Discretionary $200,000.00 $400,000.00 $600,000.00 $800,000.00 $1,000,000.00 $1,200,000.00 Water & Flood $- Community Dev. Parks & Rec. Debt Insurances Other 11 Potential Reduction Areas, Pt. 1 Budget Area Impact Budget Amount Engineering & Legal $65,000.00 Services Reduced projects and initiatives that require engineering or legal review. Difficult $68,150.00 to manage, requires staff and board restraint. Reduces response to events in Office, Administration, the year. $160,743.76 and IT Expenses $9,817.50 Includes limited office supplies, software subscriptions, expenses for Public Safety Expenses* newsletters and calendar, fees for advertising, utilities (internet, phones, etc.). $388,291.00 Reductions could affect communications to the public and productivity in the $90,250.00 Animal Control & Fall office. $50,000.00 Cleanup Day Road Work 2024 Includes expenses for public safety. Reductions here will affect the service (15-Year Plan) delivery for the Ambulance Company and Northern Berks Police Department. Public Works Expenses Includes the contract with our Animal Control servicer as well as the annual Fall Cleanup Day. Impacts direct service availability. Water & Flood Control Expenses Includes year 2024 Road Work as part of the 15-year Road Plan proposed in May/April 23’. Impacts long-term condition of roads and the aggregate cost of their repair along a degradation curve. Primarily includes materials and rentals for public works expenses; stone, cement mixture, raw materials for drains, etc. Reductions will affect infrastructure maintenance and service delivery to residents. Includes supplies and rentals for Township work to reduce impacts of flooding and maintenance work on creek areas. Reductions will impact responsiveness to significant weather events or improvements off of July 9th Floods. *Police Expenses are projected by 8.00%. The NBRPD budget has not yet been approved for 2024 so that number is only a projection. 12 6 10/16/2023 Potential Reduction Areas, Pt. 2 Budget Area Impact Budget Amount Community $20,000.00 Development Includes a flexible budget line for the Board to assign funds to grants or $44,270.00 Parks & Recreation important projects as they arise during the year. Reductions would reduce of $39,123.89 eliminate the response to events throughout the year. Debt $50,000.00 Includes supplies for park maintenance, purchase of a new picnic table, and the $196,645.00 Other Expenses library contribution and other event support payments. Reductions will affect repairs of Parks or will reduce contributions to important community groups. Semi-Discretionary Expenses Includes a lease purchase of a Mini-Excavator purchase for use by the Road Crew. Elimination of these expenses could impact the safe use of the current excavator, which has been a concern for the Road Crew considering the size of some of their work. Includes a transfer to a Capital Reserve Fund for the purpose of Bridge Replacement* in the future. Reductions could have long-term effects on the Township’s financial readiness to afford a future bridge replacement. Includes professional's fees, yard site material collection fees, gas/diesel, signs, vehicle repair, and uniforms. Reductions here would seriously hamper the advice given by professionals, services offered to residents, and basic local government activities like maintaining speed signs. 13 Financial Challenges with Roadwork This past Spring, the staff developed a Normal Road Degradation over 30 Years comprehensive road maintenance plan for 15- years, which projects the costs and schedule for 10 road work in Maidencreek. 9 Delays to that work has long-term 8 consequences, which can be seen under the chart Normal Road Degradation… 7 What you can see there is a road degrades over 6 time, but a sealcoat may extend a road’s usable 5 life-cycle. After it begins to descend along the curve, there will be a point where a sealcoat is 4 ineffective, requiring an asphalt overlay. 3 Asphalt expenses are far higher than sealcoat. A potential scenario that delays 2024’s anticipated 2 road work until 2029 is shown. 1 0 2027 2032 2037 2042 2047 2052 2023 Without Sealcoat With Sealcoat 14 7 10/16/2023 2024 Road Work (per 15-year Road Plan) Road Name Condition Intensity of Use Length Method #1 Method #2 Method #3 Inflation Price Revised Capri Fair Medium Galean Fair Medium 0.19 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 18,109.68 Grandview Fair Medium 0.15 Chip Slurry ‐ 4.7 None ‐ 0 12,130.89 Monaco Fair Medium 0.15 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 12,130.89 North View Fair Medium 0.22 Chip Slurry ‐ 4.7 None ‐ 0 20,969.11 South View Fair High 0.39 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 31,540.31 Venice Fair Medium 0.55 Chip Slurry ‐ 4.7 None ‐ 0 52,422.77 Chipmunk Fair Medium 0.22 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 20,969.11 0.11 Chip Slurry ‐ 4.7 None ‐ 0 10,484.55 Guldin [Near Railway] Fair Medium None ‐ 0 $ 4.92 $ Walnut Tree Fair High None ‐ 0 $ 4.92 $ Wesner (W. Walnut‐Hoch) Fair Medium Wyatt Fair Low None ‐ 0 $ 4.92 $ Calabria NI Medium Carmen NI Medium None ‐ 0 $ 4.92 $ Grove NI Low Riviera NI Medium 0.11 Leveling ‐ 8.01 Wearing ‐ 9.90 None ‐ 0 $ 18.76 $ 25,424.53 Wesner (Park‐W. Walnut) NI High 4.92 $ 78,446.41 0.97 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ Wesner (73‐Park) NI Medium 0.63 Leveling ‐ 8.01 Wearing ‐ 9.90 None ‐ 0 $ 18.76 $ 152,547.21 White Birch NI Low 4.92 $ 17,560.90 Total Miles: 0.19 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 25,734.81 4.92 $ 18,109.68 0.27 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 15,365.79 4.92 $ 21,922.25 0.19 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 4.92 $ 41,938.21 0.28 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 0.23 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 0.66 Chip Slurry ‐ 4.7 None ‐ 0 None ‐ 0 $ 0.29 Leveling ‐ 8.01 Wearing ‐ 9.90 None ‐ 0 $ 18.76 $ 70,220.14 0.16 Leveling ‐ 8.01 Wearing ‐ 9.90 None ‐ 0 $ 18.76 $ 42,264.16 Total Cost: $ 688,291.41 5.96 15 Delays in Road Work Road work in 2024 was projected to be more than $688K. After revisions, the amount that is anticipated to cost for those same roads is now more than $755K. The change is due to the declining condition of Wyatt Drive. Year Total Cost Downgrades 2024 $ 755,097.57 Wyatt Drive 2025 $1,292,330.69 Calabria, Capri, Carmen, Monaco, Riviera, and Venice 2026 $1,681,170.76 Walnut Tree Drive Chipmunk, Galean, Grandview, North View, South View, 2027 $2,415,566.11 Wesner (Park – W. Walnut Tree) None. 2028 $2,530,305.50 None. 2029 $2,650,495.01 The large increases year to year are due to inflation factors, use of asphalt overlay, and the requirement to utilize milling while in a development with curbs. 16 8 10/16/2023 $4,500,000.00 Road Work Expense Scenario This chart shows a potential scenario where $4,000,000.00 Long-Term Liability: $1,117,497 the Township does Road Work with Liquid $3,500,000.00 Fuels Funds of more than $285K in 2024 and $3,000,000.00 leaves the remaining roads for later. $2,500,000.00 • Remaining Roads: Walnut Tree, Wesner $2,000,000.00 $1,500,000.00 [3 parts], White Birch, and Wyatt $1,000,000.00 • The roads that are done in 2024 are the $500,000.00 most likely to downgrade, so doing those $- in 2024 with LF money would save the 1/1/2024 Township hundreds of thousands of dollars. • This projection does not account for the other roads being done in the future, but instead adds their total accrued expense to the 5-year aggregate each year. 1/1/2025 1/1/2026 1/1/2027 1/1/2028 1/1/2029 • This demonstrates the cascade effect that the decrease of road work would cause. If 1/1/2030 2024’s remaining road work would replace 2025 roads, thus cascading those 5-Year Aggregate Annual Road Projects roads which would likely make the projection worse. 17 Revenue, Pt. 1 Consideration of property tax increases must be made carefully against what the potential impact would be to the residents. Both if more taxes are levied, or the consequences of taxes not being levied. The table below contains the anticipated tax revenue from different property tax scenarios. The first scenario decreases taxes, the second keeps them the same, the final three include .50 mill progressing increases. General Millage General Fund Net Impact Dec. 31st Fund Average Bill to Average Bill Rate Revenue $(170,922.87) Balance (2024)* Resident Doubled $165.90 $331.81 .00100 $498,521.50 $(941,286.32) $207.38 $414.76 $266.63 $533.26 .00135 $673,004.03 - $(770,293.45) $325.88 $651.76 $385.13 $770.26 .00185 $922,264.78 $244,275.54 $(526,017.91) .00235 $1,171,525.53 $488,551.07 $(281,742.38) .00285 $1,420,786.28 $732,826.61 $(37,466.84) *Does not include reductions to expenses outlined on previous slides. 18 9 10/16/2023 Revenue, Pt. 2 An alternative funding method would be to re-implement a recycling fee under Ordinance §178-8. A recycling fee would only be for expenses related to Recycling expenses as included below. The fee would be spread out amongst residences that are eligible for curbside recycling collections and brush pickup. That fee would be paid as part of the tax bill in February/March of 2024. 426.00 ∙ Recycling 2023 Budget 2024 Request 2025 Projected 2026 Projected 2027 Projected 2028 Projected 426.12 ∙ Leaf Collection Wages 426.14 ∙ Recycling Wages $ 12,568.46 $ 13,110.00 $ 13,710.40 $ 14,382.40 $ 15,033.20 $ 14,997.60 426.24 ∙ Recycling Supplies 426.317 ∙ Recycling Collection Service $ ‐ 426.318 ∙ Yard Waste Site Host Fees 426.361 ∙ Utility for Site $ ‐ 426.61 ∙ Capital Construction 426.75 ∙ Minor Capital Purchases (Bins) $ 294,288.00 $ 303,116.64 $ 318,272.47 $ 327,820.65 $ 337,655.27 $ 354,538.03 Total 426.00 ∙ Recycling $ 14,400.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ 30,000.00 $ ‐ $ ‐ $ ‐ $ 321,256.46 $ 346,226.64 $ 361,982.87 $ 372,203.05 $ 382,688.47 $ 399,535.63 Total Recycling Spending ($346,226.64) / Eligible Properties* (3,167) = Annual Recycling Fee ($109.32)* *Eligible Properties are based on the annual tax duplicate book for all residential or farm properties that feature a dwelling. **The annual fee is subject to change depending on the number of eligible properties and the total approved spending in the 2024 budget. 19 Public Safety Concerns Fire Services Police Services Ambulance Services Fire companies face similar As crime has seen headline events in Ambulance companies, such as headwinds to ambulance services, recent years, and the cost of policing Northern Berks EMS are struggling but primarily rely on volunteers for fire increases, sizable increases for staff, with a difficult financial environment runs. If volunteers continue to drop equipment, and general costs may that could lead them to seek more off, the company may seek paid staff, increase beyond 8.00% that is support than the Township’s current which would likely come back to the projected. $30K. Township. Cost increases for their equipment will also likely lead to more funds at some point. 20 10 10/16/2023 Infrastructure Concerns Storm Separate Sewer Systems Bridge Replacement Road Improvements The community’s stormwater infrastructure Bridge replacement, design, construction, As discussed previously, the compounding is an unknown element in the strategic excavation, etc. can be very expensive. expenses related to road improvements are plan. We don’t know if pipes are With the potential for Cornerstone Bridge to a long-term obligation that will begin to deteriorated to a point where they need have major work done, as well as the future mount if dedicated investments are not repair or replacement, which could create cost of other bridge replacements in the made into the Township’s Roads. To best serious issues if there are failures during Township, we could consider budgeting maintain appropriate levels of investment, storms. To prepare for this, the Township dedicated funds for this work that could be the Township could utilize products like should allocate money to inventory Storm 5 – 50 years away so that taxpayers don’t RoadBotics and its 15-year Road Plan to Water pipes annually. The Board should shoulder a huge burden for an anticipated stay on top of its roads. also consider in what instances they would expense. intervene with non-public systems. 21 Additional Strategic Concerns Cash Flow Needs Rainy Day Fund Capital Finance Fund A basic operational need is to be able to Cash reserves for the Township’s benefit Capital expenses, such as vehicles, maintain at least 15% of the total annual are critical as they assist with absorbing equipment, or infrastructure improvements budget in liquid-able resources. This financial changes or natural disasters that that are large predictable expenses or standard would allow the Township to fund- come as the result of social, political, represent projects that span more than 12 as-we-go in the early parts of the year to economic, or environmental conditions. months could be considered for inclusion in avoid borrowing on a line of credit while The use of fund balance in 2023 has a Capital Budget. The expenses of vehicles preventing the Township from withdrawing eroded much of the Township’s current and trucks will be important to continue as money from higher interest-bearing Rainy-Day Fund and the Board should they improve efficiency and avoid loss of accounts to pay bills, thus realizing greater consider how to rebuild this. Its difficult to productivity when equipment is out and interest or dividend returns for taxpayers. say how much that should be, but it would avoids higher maintenance or rental costs. be beneficial to have 3-6 months or more of Financing them or purchasing outright 22 expenses in reserve. through sinking fund dedicated to capital expenses will increase predictability in the General Fund. 11 10/16/2023 THANK YOU! 23 12