Other Township Records

MS4 Annual Report

Date
Date unknown
Type
Report
Year
2024
File
PDF · 22.5 MB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 74,777 words

MS4 ANNUAL REPORT
For the Period July 1, 2021 to June 30, 2022
NPDES Permit No. PAl-133546
Prepared for:
MAIDENCREEK TOWNSHIP
PO Box 319
Blandon,PA 19510
Prepared by:
SYSTEMSDESIGN
SDE
ENGINEERING,INC
1032 James Drive, Leesport, PA 19533
September 2022
22-00190191

Table of Contents
Item
MS4 Annual Report
Stormwater Management Program (SWMP)

MS4 ANNUAL REPORT

3800-FM-BCW0491
9/2017
COMMONWEALTHOFPENNSYLVANIA
Annual MS4 Status Report
DEPARTMENTOFENVIRONMENTALPROTECTION
pennsylvania
BUREAU OF CLEANWATER
DEPARTMENT OF ENVIRONMENTAL
PROTECTION
ANNUAL MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)
STATUS REPORT
FOR THE PERIOD July 1, 2021 TO JUNE 30, 2022
GENERAL INFORMATION
Permittee Name:
Maidencreek Township
NPDES Permit No.:
PAI133546
Mailing Address:
P.O. Box 319
Effective Date:
04/01/2019
City, State, Zip:
Blandon, PA 19510
Expiration Date:
03/31/2024
Hunter L. Ahrens
Ms4 Contact Person:
Renewal Due Date:
10/02/2023
Title:
Township Manager
Municipality:
Maidencreek Township
Phone:
(610) 926-4920
County:
Berks
Email:
hlahrens@maidencreek.net
Co-Permittees (if applicable):
Appendix(ces) that permittee is subject to (select all that apply):
Appendix A  Appendix B
 Appendix C  Appendix D  Appendix E β Appendix F
WATER QUALITY INFORMATION
Are there any discharges to waters within the Chesapeake Bay Watershed?
 Yes
μ No
Identify all surface waters that receive stormwater discharges from the permittee's Ms4 and provide the requested information
(see instructions).
Ch. 93 Class.
Impaired?
Cause(s)
Receiving Water Name
TMDL?
WLA?
Nutrients, Suspended
Lake Ontelaunee
WWF,MF
yes
yes
TP/TSS
solids
Willow Creek and unnamed
HQ-CWF/MF
yes
Pathogens, Nutrients
ou
tributaries
no
WWF, MF
Maiden Creek
Pathogens
yes
no
no

3800-FM-BCW04919/2017
Annual MS4 Status Report
GENERAL MINIMUM CONTROL MEASURE (MCM) INFORMATION
Have you completed all MCM activities required by the permit for this reporting period?
 Yes
 No
List the current entity responsible for implementing each MCM of your SWMP, along with contact name and phone number.
MCM
Entity Responsible
Contact Name
Phone
#1 Public Education and Outreach on Storm Water Impacts
(610) 926-
Maidencreek Township
Hunter Ahrens
4920
#2 Public Involvement/Participation
(610) 926-
Maidencreek Township
Hunter Ahrens
4920
#3 Ilicit Discharge Detection and Elimination (IDD&E)
(610) 926-
Maidencreek Township
Keith Shuman
4920
#4 Construction Site Storm Water Runoff Control
Berks County
Dean
(610) 372-
Conservation District
Druckenmiller
4657
#5 Post-Construction Storm Water Management in New
(610) 926-
Maidencreek Township
Hunter Ahrens
Development and Redevelopment
4920
#6 Pollution Prevention / Good Housekeeping
(610) 926-
Maidencreek Township
Keith Shuman
4920
MCM #1 -- PUBLIC EDUCATION AND OUTREACH ON STORM WATER IMPACTS
BMP #1: Develop, implement and maintain a written Public Education and Outreach Program.
1.
 For new permittees only, has the written PEOP been developed and implemented within the first year of permit coverage?
 Yes  No
2.
■ Yes
Date of latest annual review of PEOP: 08/13/2020
Were updates made?
β No
3.
What were the plans and goals for public education and outreach for the reporting period?
Educate residents on reducing stormwater runoff and proper disposal of pet waste, grass clippings, leaves and brush.
Stormwater information was handed out with building permits.
4.
Did the MS4 achieve its goal(s) for the PEOP during the reporting period?
μ Yes  No
5.
Identify specific plans and goals for public education and outreach for the upcoming year:
Educate residents on the location of the new yardwaste dropoff site and what is accepted at the site. Continue to
provide education on what illicit discharge is and how to report it. Educate the public on the health of our streams and
keeping our drinking water supply clean.
BMP #2: Develop and maintain lists of target audience groups present within the areas served by your Ms4.
1.
For new permittees only, have the target audience lists been developed and implemented within the first year of permit
coverage?
 Yes  No
2.
Date of latest annual review of target audience lists: 08/13/2020
Were updates made?
Yes
μ No
BMP #3: Annually publish at least one educational item on your Stormwater Management Program.
1. 
For new permittees only, were stormwater educational and informational items produced and published in print and/or on the
Internet within the first year of permit coverage?
-2 -

3800-FM-BCW04919/2017
Annual MS4 Status Report
□ Yes  No
Were updates made?
2.
□ Yes
Date of latest annual review of educational materials: 08/13/2020
μ No
Do you have a municipal website?
Yes
No
3.
(URL:
www.maidencreek.net)

3800-FM-BCW04919/2017
Annual MS4 Status Report
If Yes, what Ms4-related material does it contain?
The website contains the PEOP and PIPP, the TMDL plan, the PRP and the last annual MS4 report. There are links
to educational materials such as Caring for your Streamside Property, When It Rains, It Drains, Swimming Pool Water
Discharge Guidelines, and Septic System Care and Maintenance.
Describe any other method(s) used during the reporting period to provide information on stormwater to the public:
 5. Identify specific plans for the publication of stormwater materials for the upcoming year:
The Township will continue to publish three newsletters, a calendar and a postcard on the new yard waste dropoff
site. A special mailing will be made in August to septic system users. New homeowners will receive educational
material in their new homeowners packets.
BMP #4: Distribute stormwater educational materials to the target audiences.
Identify the two additional methods of distributing stormwater educational materials during the previous reporting period (e.g.,
displays, posters, signs, pamphlets, booklets, brochures, radio, local cable TV, newspaper articles, other advertisements, bill
stuffers, posters, presentations, conferences, meetings, fact sheets, giveaways, or storm drain stenciling).
The Township will give away stormwater posters at safe Halloween and maintain signs in the township open space. A
stromwater bulletin board is maintained in the Township Lobby and a magnet and a card on storm drain stenciling are
available in the Township building lobby.
MCM #1 Comments:
MCM #2 - PUBLIC INVOLVEMENT/PARTICIPATION
BMP #1: Develop, implement and maintain a written Public Involvement and Participation Program (PIPP)
For new permittees only, was the PiPP developed and implemented within one year of permit coverage?
Yes
 No
2.
Were updates made?
Yes
Date of latestannual reviewofPIPP:08/13/2020
μ No
BMP #2: Advertise to the public and solicit public input on ordinances, SOPs, Pollutant Reduction Plans (PRPs) (if
applicable) and TMDL Plans (if applicable), including modifications thereto, prior to adoption or submission to DEP:
1. 
2. 
If Yes, describe how you advertised the draft document(s) and how you provided opportunities for public review, input and
feedback:
 3.  If an ordinance, soP or plan was developed or amended during the reporting period, provide the following information:
Date of Public
Date of Public
Ordinance / SoP / Plan Name
Date Enacted or
Notice
Hearing
Submitted to DEP

3800-FM-BCW04919/2017
Annual MS4 Status Report
- 5 -

3800-FM-BCW04919/2017
AnnualMs4StatusReport
BMp #3: Regularly solicit public involvement and participation from the target audience groups using available
distribution and outreach methods.
1. At least one public meeting or other Ms4 event must be held during the 5-year permit coverage period to solicit participation
and feedback from target audience groups. Was this meeting or event held during the reporting period?
 Yes β No
If Yes, Date of Meeting or Event:
2. Report instances of cooperation and participation in Ms4 activities; presentations the permittee made to local watershed and
conservation organizations; and similar instances of participation or coordination with organizations in the community.
On July 16, 2020, Maidencreek Township became actively involved in the Berks County Source Water Protection
Committee and began attending quarterly meetings. On March 23, 2021, Maidencreek Township participated in the
annual Reading Area Water Authority Source Water Protection meeting.
3.
swMP, including education activities or efforts such as cleanups, monitoring, storm drain stenciling, or others.
MCM #2 Comments:
MCM #3 - ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDD&E)
BMP #1: Develop and implement a written program for the detection, elimination, and prevention of illicit discharges
into the regulated small MS4.
 Yes  No
Yes
2.
Date of latest annual review of IDD&E program: 06/04/2020
Were updates made?
μ No
BMP #2: Develop and maintain map(s) that show permittee and urbanized area boundaries, the location of all outfalls
and, if applicable, observation points, and the locations and names of all surface waters that receive discharges from
those outfalls. Outfalls and observation points shall be numbered on the map(s).
1. Have you completed a map(s) that includes all components of BMP #2?  Yes  No
If Yes and you are a new permittee and have not submitted the map(s) previously, attach the map(s) to this report.
If No, date by which permittee expects map(s) to be completed:
2.
Date of last update or revision to map(s):
04/01/2019
3.
Total No. of Outfalls in MS4:
56
Total No. of Outfalls Mapped:
56
4.
Total No. of Observation Points:
Total No. of Observation Points Mapped:
5.
During the reporting period, have you identified any existing outfalls that have not been previously reported to DEP in an
NOl, application or annual report, or are any new MS4 outfalls proposed for the next reporting period?
μ No
 Yes[
If Yes, select:  Existing Outfall(s) Identified[
 New Outfall(s) Proposed
-6-

3800-FM-BCW04919/2017
Annual MS4 Status Report
permittee shall develop and maintain map(s) that show the entire storm sewer collection system within the permittee's
jurisdiction that are owned or operated by the permittee (including roads, inlets, piping, swales, catch basins, channels,
and any other components of the storm sewer collection system), including privately-owned components of the
collection system where conveyances or BMPs on private property receive stormwater flows from upstream publicly-
owned components.
1. Have you completed a map(s) that includes all components of BMP #3?  Yes  No
If Yes and you are a new permittee and have not submitted the map(s) previously, attach the map(s) to this report.
If No, date by which permittee expects map(s) to be completed:
2.
If Yes to #1, is the map(s) on the same map(s) as for outfalls and receiving waters?  Yes  No
3.
Date of last update or revision to map(s):
04/01/2019
BMP #4: Conduct dry weather screenings of Ms4 outfalls to evaluate the presence of illicit discharges. If any illicit
illicit discharges. The permittee shall also respond to reports received from the public or other agencies of suspected
or confirmed illicit discharges associated with the storm sewer system, as well as take enforcement action as
necessary. The permittee shall immediately report to DEP illicit discharges that would endanger users downstream
For new permittees, all identified outfalls (and if applicable observation points) must be screened during dry weather at least
observation points) must be screen during dry weather at least once within the 5-year period following permit coverage and, for
areas where past problems have been reported or known sources of dry weather flows occur on a continual basis, outfalls must
be screened annually during each year of permit coverage.
1.
11
2.
Indicate the percentage of all outfalls screened in the past five years.
100%
Indicate the percent of outfalls screened during the reporting period that revealed dry weather flows:
3.
0%
4.
5.
If Yes for #4, attach all sample results to this report with a map identifying the sample location. Explain the corrective action(s)
taken in the attachment.
6. Do you use the MS4 Outfall Field Screening Report form (3800-FM-BCW0521) provided in the permit?
μ Yes  No
If No, attach a copy of your screening report form.
program that includes prohibition of non-stormwater discharges to the regulated small Ms4.
discharges?  Yes  No
If Yes, indicate the date of the ordinance or S0P: 06/12/2008
2.
If Yes to #1, is the ordinance or SOP consistent with DEP's 2022 Model Stormwater Management Ordinance (3800-PM-
BCw0100j) with respect to authorized non-stormwater discharges?  Yes  No (Township is reviewing DEP's 2022
Model Stormwater Management Ordinance for adoption.)
If Yes to #2 and the ordinance or SOP has not been submitted to DEP previously, attach the ordinance or SOP.

3800-FM-BCW04919/2017
Annual MS4 Status Report
3. Were there any violations of the ordinance or SOP during the reporting period?
ä Yes μ No
If Yes to #3, complete the table below (attach additional sheets as necessary).
Violation Date
Responsible Party
Nature of Violation
Enforcement Taken
4.  Did you approve any waiver or variance during the reporting period that allowed an exception to non-stormwater discharge
provisions of an ordinance or soP?  Yes μ No
If Yes to #4, identify the entity that received the waiver or variance and the type of non-stormwater discharge approved.
BMp #6: Provide educational outreach to public employees, business owners and employees, property owners, the
1.
Was IDD&E-related information distributed to public employees, businesses, and the general public during the reporting
period?  Yes  No
If Yes, what was distributed?
2. Is there a well-publicized method for employees, businesses and the public to report stormwater pollution incidents?
μ Yes  No
Do you maintain documentation of all responses, action taken, and the time required to take action? β Yes
3.
□ No
MCM #3 Comments:
MCM #4 - CONSTRUCTION SITE STORMWATER RUNOFF CONTROL
Are you relying on PA's statewide program for stormwater associated with construction activities to satisfy this MCM?
 Yes  No
(lf Yes, respond to questions for BMP Nos. 1, 2 and 3 only in this section. If No, respond to questions for all BMPs in this section)
BMP #1: The permittee may not issue a building or other permit or final approval to those proposing or conducting earth
disturbance activities requiring an NPDES permit unless the party proposing the earth disturbance has valid NPDES
Permit coverage (i.e., not expired) under 25 Pa. Code Chapter 102.
During the reporting period, did you comply with 25 Pa. Code $ 102.43 (relating to withholding building or other permits or
approvals until DEP or a county conservation district (CCD) has approved NPDES permit coverage)?
μ Yes
■ No
 Not Applicable (no building permit applications received)
-8-

3800-FM-BCW04919/2017
Annual MS4 Status Report
BMP #2: A municipality or county which issues building or other permits shall notify DEP or the applicable CCD within
5 days of the receipt of an application for a permit involving an earth disturbance activity consisting of one acre or
more, in accordance with 25 Pa. Code $ 102.42.
During the reporting period, did you comply with 25 Pa. Code $ 102.42 (relating to notifying DEP/CCD within 5 days of receiving
 Yes  No  Not Applicable (no building permit applications received)
BMP #3: Enact, implement and enforce an ordinance or SoP to require the implementation and maintenance of E&s
control BMPs, including sanctions for non-compliance, as applicable.
1. Do you have an ordinance (municipal) or sOP or other mechanism (non-municipal) that requires implementation and
maintenance of E&S control BMPs?  Yes  No
If Yes, indicate the date of the ordinance or SOP: 06/12/2008
2.
If Yes to #1, is the ordinance or SOP consistent with DEP's 2022 Model Stormwater Management Ordinance (3800-PM-
BCw0100j)?  Yes  No (Township is reviewing DEP's 2022 Model Stormwater Management Ordinance for adoption.)
3.  If Yes to #2 and the ordinance or SOP has not been submitted previously, attach a copy of the ordinance or SOP.
BMP #4: Review Erosion and Sediment (E&S) control plans to ensure that such plans adequately consider water quality
impacts and meet regulatory requirements.
Specify the number of E&s Plans you reviewed during the reporting period:
BMP #5: Conduct inspections regarding installation and maintenance of E&s control measures during earth
disturbance activities. Maintain records of site inspections, including dates and inspection results, in accordance with
the record retention requirements in this permit.
Specify the number of E&s inspections you completed during the reporting period:
activities does not comply with permit and/or regulatory requirements.
Specify the number of enforcement actions you took during the reporting period for improper E&S:
BMP #7: Develop and implement requirements for construction site operators to control waste at construction sites
construction site operators.
Specify the method(s) by which you are educating construction site operators on controlling waste at construction sites:
BMP #8: Develop and implement procedures for the receipt and consideration of public inquiries, concerns, and
information submitted by the public to the permittee regarding local construction activities.
1. A tracking system has been established for receipt of public inquiries and complaints.  Yes 
□ No
Specify the number of inquiries and complaints received during the reporting period:
MCM #4 Comments:

3800-FM-BCW04919/2017
AnnualMS4StatusReport
MCM #5 - POST-CONSTRUCTION STORM WATER MANAGEMENT IN NEW DEVELOPMENT AND REDEVELOPMENT
new development and redevelopment projects, including sanctions for non-compliance.
1. Do you have an ordinance (municipal) or soP or other mechanism (non-municipal) that requires implementation and
maintenance of post-construction stormwater management (PcsM) BMPs?  Yes  No
If Yes, indicate the date of the ordinance or S0P: 06/12/2008
2. If Yes to #1, is the ordinance or SOP consistent with DEP's 2022 Model Stormwater Management Ordinance
(3800-PM-BCW0100j)?  Yes  No (Township is reviewing DEP's 2022 Model Stormwater Management Ordinance
for adoption.)
3.
If Yes to #2 and the ordinance or SOP has not been submitted previously, attach a copy of the ordinance or SOP.
BMP #2: Develop and implement measures to encourage and expand the use of Low Impact Development (LID) in new
development and redevelopment. Measures should also be included to encourage retrofitting LiD into existing
development. Enact ordinances consistent with LiD practices and repeal sections of ordinances that conflict with LID
practices.
1. Do you have an ordinance (municipal) or SoOP or other mechanism (non-municipal) that encourages and expands the use
of LID in new development and redevelopment?  Yes  No
If Yes, indicate the date of the ordinance or S0P: 06/12/2008
2.
If Yes to #1, is the ordinance or SOP consistent with DEP's 2022 Model Stormwater Management Ordinance (3800-PM-
BCWo100j)?  Yes  No (Township is reviewing DEP's 2022 Model Stormwater Management Ordinance for adoption.)
3.
If Yes to #2 and the ordinance or SoP has not been submitted previously, attach a copy of the ordinance or SOP.
BMP #3: Ensure adequate O&M of all post-construction stormwater management BMPs that have been installed at
development or redevelopment projects that disturb greater than or equal to one acre, including projects less than one
acre that are part of a larger common plan of development or sale.
Do you have an inventory of all PCSM BMPs that were installed to meet requirements in NPDES Permits for Stormwater
Discharges Associated with Construction Activities approved since March 10, 2003? β Yes  No
If Yes to #1, complete Table 1 on the next page.
2.
Has proper O&M occurred during the reporting period for all PcSM BMPs?  Yes  No
3.
If No to #2, explain what action(s) the permittee has taken or plans to take to ensure proper O&M.
Inspections were conducted for basins installed before and after March 10, 2003 and letters sent to those property
owners who needed to take corrective action.
if you are relying on PA's statewide program for stormwater associated with construction activities, you may skip to MCM #6,
otherwise complete all questions for BMPs #4 - #6 in this section.
BMP #4: Require the implementation of a combination of structural and/or non-structural BMPs that are appropriate to
the local community, that minimize water quality impacts, and that are designed to maintain pre-development runoff
conditions.
1. Specify the number of PcsM Plans reviewed during the reporting period for projects disturbing greater than or equal to
2. Has a tracking system been established and maintained to record qualifying projects and their associated BMPs?
- 10-

3800-FM-BCW0491
9/2017
Annual MS4 Status Report
Yes
No
-11 -

Table 1. To complete the information needed for MCM #5, BMP #3, list all existing structural BMPs that discharge stormwater to the permittee's MS4 that were installed
PAG02 0006 15
PAG02 0006 04
PAG2 0006 05
NPDES Permit
PAG02 0006 15
PAC060121
033R(1)
PAG2
017
025
No.
018
Inspection by Township
Operate and Maintain
remove debris, restore
O&M Requirements
Inspect immediately
following significant
storm water event,
Maintenance
Maintenance
Maintenance
Maintenance
eroded areas
Maintenance
June 2007
June 2015
Installed
October
Summer
2010
2015
2008
2014
Date
2005
2019
Longitude
75°52'11"
75'52'15"
75'51'53"
75"51'53"
75'54'18"
75'52'25"
75'53'47"
75'53'31"
PCSM BMP INVENTORY
40°26'25"
40°26'10"
40°26'44"
40°26'38"
40°27'04"
40°26'38"
40'°26'02"
Latitude
40°27'42"
Omega builders Lots
Giorgio Waste Water
Angelo Corrado and
Melrose Place - to be
Entity Responsible
Microair Computers
1-10 Crossings at
Stefano Folino -
turned over to a
Norm Flamm -
Adam Wojcicki -
Transportation
Tom Psarros -
homeowner's
Maidencreek
Maidencreek
Business Park
Boyer Place
David Small
association
Bill Gross -
Treatment
Brandywine
for O&M
2.76
1.96
0.85
2.85
(ac)
3.15
Infiltration Basin, amended
Landscape restoration, soil
infiltration because of
restoration,subsurface
Detention Basin - no
soils, rain gardens
Infiltration Basin
Infiltration Basin
Infiltration Basin
Infiltration Basin
Infiltration Basin
infiltration bed
BMP Name
geology
3800-FM-BCW04919/2017
Annual MS4StatusReport
BMP
No.

Summer
2020
75°51'35"
40°26'40"
Monica Schick
Schick Dental
0.41
Seepage beds
9/2017
Annual MS4 Status Report
3800-FM-BCW0491

3800-FM-BCW04919/2017
AnnualMS4StatusReport
BMP #5: Ensure that controls are installed that shall prevent or minimize water quality impacts. The permittee shall
inspect all qualifying development or redevelopment projects during the construction phase to ensure proper
installation of the approved structural PcsM BMPs. A tracking system (e.g., database, spreadsheet, or written list) shall
be implemented to track the inspections conducted and to track the results of the inspections (e.g-, BMPs were, or were
not, installed properly).
1. During the reporting period have you inspected all qualifying development and redevelopment projects during the
construction phase to ensure proper installation of approved structural BMPs?
 Yes  No  Not Applicable (no qualifying projects during reporting period)
2.
Has a tracking system been established and maintained to record results of inspections?
 Yes  No
BMP #6: Develop a written procedure that describes how the permittee shall address all required components of this
MCM.
Have you developed a written plan that addresses: 1) minimum requirements for use of structural and/or non-structural BMPs in
plans for development and redevelopment; 2) criteria for selecting and standards for sizing stormwater BMPs; and 3)
implementation of an inspection program to ensure that BMPs are properly installed?  Yes  No
MCM #5 Comments:
MCM #6 - POLLUTION PREVENTION / GOOD HOUSEKEEPING
BMP #1: Identify and document all operations that are owned or operated by the permittee and have the potential for
permittee.
1. Have you identified all facilities and activities owned and operated by the permitee that have the potential to generate
stormwater runoff into the Ms4? μ Yes  No
2.
When was the inventory last reviewed? 06/04/2020
3.
When was it last updated? 07/26/2019
discharge of pollutants from the MS4, as identified under BMP #1. This program shall address stormwater collection or
conveyance systems within the regulated Ms4.
Have you developed a written O&M program for the operations identified in BMP #1?
1. 
β Yes
No
2.
Date of last review or update to written 0&M program: 09/04/2020
BMP #3: Develop and implement an employee training program that addresses appropriate topics to further the goal of
preventing or reducing the discharge of pollutants from operations to the regulated small MS4. All relevant employees
and contractors shall receive training.
1.
Have you developed an employee training program?  Yes  No
2.
Date of last review or update to training program:
June 2021
Date of latest training:
None this reporting
period
- 14 -

3800-FM-BCW04919/2017
Annual MS4 Status Report
3. 
Training topics covered:
No training during reporting period.
4.
Name(s) of training presenter(s):
No training during reporting period.
5.
Names of training attendees:
No training during reporting period.
MCM #6 Comments:
POLLUTANT CONTROL MEASURES (PCMs)
Indicate the status of implementing PCMs in Appendices A, B and/or C by completing the table below. Skip this section if PCMs
are not applicable.
Task
Date Completed
Attached
Anticipated Completion Date
Storm Sewershed Map(s)
04/01/2019
Source Inventory
03/26/2020
Investigation of Suspected Sources
06/30/2023
Ordinance/sOPfor Controlling AnimalWastes
10/14/1992,
03/17/2017
PcM Comments:
Pet waste is regulated under Chapter 67 Animals, and Farm Animal waste is regulated in the Township Zoning
Ordinance Chapter 220.
POLLUTANT REDUCTION PLANS (PRPs) AND TMDL PLANS
1.
Complete this section if the development and submission of a PRP and/or TMDL Plan was required as an attachment to the
latest NOl or application or was required by the permit, regardless of whether DEP has approved the plan(s).
DEP
Submission
Type of Plan
Approval
Surface Waters Addressed by Plan
Date
Date
Chesapeake Bay PRP (Appendix D)
Chesapeake Bay
Impaired Waters PRP (Appendix E)
04/01/2019
09/2017
Willow Creek
TMDL Plan (Appendix F)
09/2017
04/01/2019
Lake Ontelaunee
Combined Chesapeake Bay / Impaired
Chesapeake Bay,
Waters PRP
Combined PRP / TMDL Plan
Joint Plan (if checked, list the name of the MS4 group or names of all entities participating in the joint plan below)
Joint Plan Participants:
- 15 -

3800-FM-BCW04919/2017
Annual MS4 Status Report
2.
Identify the pollutants of concern and pollutant load reduction requirements under the permit (see instructions).
Tss Load Reduction
TP Load Reduction
TN Load Reduction
Type of Plan
(lbs/yr)
(lbs/yr)
(lbs/yr)
Chesapeake Bay PRP (Appendix D)
Impaired Waters PRP (Appendix E)
82.21 Ibs./yr
TMDL Plan (Appendix F)
26.6 metric ton/yr
13.18 Ibs./yr
Combined Chesapeake Bay / Impaired
WatersPRP
Combined PRP / TMDL Plan
3.
09/30/2024
‧ Yes
Have any modifications to the plan(s) occurred since DEP approval?
4.
μ No
If Yes to #4, was the updated plan(s) submitted to DEP?
□ Yes
• No
If Yes to #4, did you comply with the public participation requirements of the applicable appendix?
 Yes  No
If Yes to #4, describe the plan modifications.
5. Summary of progress achieved during reporting period.
PRP . the Well 6 and 7 property on Main Street, Blandon has been kept in meadow grass. No chemicals are used
and it is cut twice a year. The well permitting is ongoing with the PA DEP and the engineer is currently designing the
well haouse and control building. The 34 acre riparian buffer along the Willow Creek continues to grow. The edges of
the 34 acres was mowed three times in the reporting period but 90% of the property remains untouched.
TMDL - the Berks County MS4 Steering Committee meetings were attended virtually. Education was provided to all
property owners inside and outside the Ms4 Urbanized Area with septic systems on proper maintenance of their
systems. Township has developed and posted on their website a Public Education and Outreach Plan as well as a
Public Involvement and Participation Plan in an effort to solicit voluntary cooperation from private landowners.
6.
Anticipated activities for next reporting period.
PRP Plan - Continue to allow meadow and riparian buffer to develop naturally.
Stormshed Areas to Lake Ontelaunee. Resulting "gaps" in the BMP coverage area will be evaluated and alternates
will be identified to meet the TMDL reduction requirements.
PRP/TMDL Plan Comments:
- 16 -

Annual Sediment
Load Reduction
Satis-
factory?
(lbs/yr)
Date of
Latest
Inspect
uol-
Ch.
102?
Sediment Load
Reduction
Annual
(Ibs/yr)
Planning
Area?
Date Installed
Implemented
Date Installed
BMP INVENTORY FOR PRP/TMDL PLAN IMPLEMENTATION
2011
2018
NEW BMPs FOR PRP/TMDL PLAN IMPLEMENTATION
or
Longitude
Longitude
75°53'08"
40°26'55"
Latitude
Latitude
40°26'38"
acres
Units
Units
acres
reductions in the permittee's PRP and/or TMDL Plan (see instructions).
Extent
BMP
Extent
BMP
Imp.
DA (ac)
DA (ac)
BMPs nor ongoing non-
Converted Corpland
No new structural
structural BMPs
BMP Name
BMP Name
Forest Buffer
3800-FM-BCW04919/2017
Annual MS4 Status Report
BMP
No.
BMP
No.

3800-FM-BCW0491 9/2017
Annual MS4 Status Report
CERTIFICATION
For PAG-13 Permittees: I have read the latest PAG-13 General Permit issued by DEP and agree and certify that (1) the permittee
continues to be aligible for coverage under the PAG-13 General Permit and (2) the permittee will continue to comply with the conditions
of that permit, including any modifications thereto. 1 understand that if I do not agree to the terrns and conditions of the PAG-13 General
construction needed to comply with the General Permit requirements shall be designed, built, operated, and maintained in accordance
withoperative iaws and regulations.
For All Permittees: I certify under penalty of law that this report was prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of
the person or persons who manage the system, or those persons directly responsible for gathering the information, the information
submitting false information, including the possibility of fine and imprisonment for knowing violations. See 18 Pa. C.S. s 4904 (relating
to unsworn falsification).
Hunter L. Ahrens
Hunter L Ahrens
Nameof ResponsibleOfficial
Signature
(610) 926-4920
09/29/2022
Telephone No.
Date
- 18-

STORMWATER MANAGEMENT PROGRAM
(SWMP)

MAIDENCREEK TOWNSHIP
BERKS COUNTY, PA
STORMWATER MANAGEMENT PROGRAM
(SWMP)
Prepared for
MAIDENCREEK TOWNSHIP
PO Box 319
Blandon, PA 19510
NPDES Permit No. PAl-133546
Updated June 2022
SYSTEMSDESIGN
SDE
"A Passion tor Engineering Excellence"
ENGINEERING,INC
sdei.net

Table of Contents
Page
Introduction
MCM #1 - Public Education and Outreach Plan
1.1
Description
1.2
BMP #1 - Develop, Implement and Maintain the PEOP
1.3
BMP #2 - Target Audience
1.4
BMP #3 - Published Materials
1.5
BMP #4-Additional Educational Materials
Appendices
A.
MCM #1 Public Education and Outreach on Stormwater Impacts
BMP #1 Public Education and Outreach Plan (MS4 Steering Committee)
B.
MCM #1 Public Education and Outreach on Stormwater Impacts
BMP #3 Published Educational Items
C.
MCM #1 Public Education and Outreach on Stormwater Impacts
BMP #4 Additional Educational Materials Distributed
MCM #2 - Public Involvement / Participation Plan
2.1
Description
BMP #1 - Develop, Implement and Maintain the PIPP
2.3
BMP #2 - Meetings, Public Notice and Advertisement
2.4
BMP #3 - Public Involvement and Participation
Appendices
D.
MCM #2 Public Involvement/Participation
BMP #3 Public Involvement/Participation Plan (MS4 Steering Committee)
E.
MCM #2 Public Involvement/Participation
BMP #3 Public Meeting Notices and Minutes
MCM #3 - Illicit Discharge Detection and Elimination Plan
3.1
Description
3.2
Illicit Discharges
3.3
IDD&E Program

3.4
Ordinance Adoption
12
3.5
Reaching Target Audience about IDD&E
12
3.6
Evaluation of the IDD&E Program
12
Appendices
F.
MCM #3 Public Involvement/Participation
BMP #2 & #3 MS4 Outfall Map
G.
MCM #3 Illicit Discharge Detection and Elimination (IDD&E)
BMP #4 Outfall Field Screening
H.
MCM #3 Illicit Discharge Detection and Elimination (IDD&E)
BMP #5 Act 167 and MS4 Ordinance #214
MCM #4 - Construction Site Stormwater Runoff Control Plan
13
4.1
Description
13
4.2
Memorandum of Understanding
13
4.3
Records Retention
13
4.4
Ordinance Adoption
13
4.5
Plan Maintenance
14
Appendix
MCM #4 Construction Site Stormwater Runoff Control
Berks County Conservation District / Maidencreek Township Memorandum
of Understanding
J.
MCM #4 Construction Site Stormwater Runoff Control
Berks County Conservation District Correspondence and Related
Documentation
K.
MCM#4Construction SiteStormwater Runoff Control
BMP #3 Act 157 and MS4 Ordinance #214
MCM #5 - Post-Construction Stormwater Management (PcSM) in
New and Redevelopment Areas
15
5.1
Description
15
5.2
Ordinance Adoption
15
5.3
Memorandum of Understanding
15
5.4
PCSM BMP Inventory
15
5.5
Records Retention
15

Plan Maintenance
16
Appendix
L.
MCM #5 Post-Construction Stormwater Management in New Development
and Redevelopment.
Berks County Conservation District / Maidencreek Township Memorandum of
Understanding
M.
MCM #5 Post-Construction Stormwater Management in New Development
and Redevelopment.
Berks County Conservation District Correspondence and Related
Documentation
MCM #6 - Pollution Prevention / Good Housekeeping for Municipal Operations
17
6.1
Description
17
6.2
Applicability
17
6.3
General Stormwater Awareness
17
6.4
Pollution Prevention/Good Housekeeping
18
6.5
BMP Operation and Maintenance
18
6.6
Illicit Discharge Tracking and Reporting
18
6.7
Training Resources
18
6.8
Training Checklist
19
6.9
Additional Resources/References
Appendix
N.
MCM #6 Pollution Prevention / Good housekeeping.
BMP #1 & #2 Facilities Inventory Operations and Maintenance Plan
0.
MCM #6 Pollution Prevention / Good housekeeping.
BMP #3 Employee Training Documentation
P.
MCM #6 Pollution Prevention / Good housekeeping.
DEP Street Sweeping Material Reuse Policy
Q.
MCM #6 Pollution Prevention / Good housekeeping.
Pollutant Reduction Plan (PRP)
R.
MCM #6 Pollution Prevention / Good housekeeping.
MS4 TMDL Plan

1.
INTRODUCTION
A.
Discharges of stormwater from regulated small municipal separate storm sewer
systems (small MS4s), are required under the federal stormwater regulations and
state regulations incorporating those federal requirements by reference to submit an
application and obtain a NPDES permit to discharge stormwater into surface waters
of the Commonwealth of Pennsylvania.
B.
The NPDES permit authorizes discharges from regulated small MS4s to surface waters
of the Commonwealth, when such discharges are composed entirely of stormwater.
The permittee is required to submit reports to document the implementation of a
Stormwater Management Program (sWMP), designed to reduce the discharge of
pollutants from the regulated small MS4 to the Maximum Extent Practicable (MEP);
and when required, the development of, submission to DEP for approval, and activity
to ensure implementation of an MS4 Pollutant Reduction Plan (PRP) and/or Total
Maximum Daily Load (TMDL) Plan consistent with the TMDL.
C.
Common pollutants found in stormwater runoff include oil and grease from
roadways, pesticides from lawns, sediment from construction sites, discarded trash,
such as cigarette butts, paper wrappers, and plastic bottles, and sediment from
waterway erosion. When these kinds of pollutants are carried by stormwater into
regulated small Ms4s that discharge into nearby waterways, the waterways can
become impaired for uses, such as habitat for fish and other aquatic wildlife, drinking
water supplies, and water-contact recreational use.
D.
The federal regulations establish six (6) Minimum Control Measures (MCMs) that
must be satisfied by the permittee through implementation of a sWMP consisting of
Best Management Practices (BMPs) designed to reduce the discharge of pollutants
from the regulated small MS4 to the MEP. Rather than numeric "end of pipe" limits,
the "narrative" BMPs are designed to reduce the amount of pollutants discharged in
stormwater runoff. Permittees meet the regulatory and permit requirements by
implementing the BMPs in the permittees' SWMP to the MEP, and demonstrating
that such BMPs consistently reduce pollutants in stormwater runoff. The six (6)
McMs are:
McM #1 Public education and outreach on storm water impacts
MCM #2 Public involvement and participation
MCM #3 Illicit discharge detection and elimination (IDD&E)
McM #4 Construction site storm water runoff control
MCM #5 Post-construction storm water management in new development and
redevelopment
MCM #6 Pollution prevention and good housekeeping for municipal operations
E.
This SWMP outlines regulations, policies and procedures for meeting MCMs #1

1.0
MCM #1 - Public Education and Outreach Program (PEOP)
1.1
Description
MCM #1 requires the MS4 municipality to implement the following BMPs:
1.1.1 [
 Develop, implement and maintain a written Public Education and Outreach
Program.
1.1.2
Develop and maintain lists of target audience groups that are present within
the areas served by the permittee's regulated small Ms4.
1.1.3
Annually publish at least one issue of a pamphlet, a flyer, or a website that
includes general stormwater educational information, a general description of
the permittee's stormwater management plan, and/or information about the
permittee's stormwater management activities.
1.1.4
Distribute stormwater educational materials and/or information to the target
audiences using two methods annually.
1.2
BMP #1 -- Develop, Implement and Maintain the PEOP
Maidencreek Township will update and maintain this PEOP annually at a minimum.
1.3
BMP #2 - Target Audience
Maidencreek Township's target audience includes the following:
Residents
Business Owners & Employees
Municipal Employees
Developers
Emergency Services Organizations
Maidencreek Township reaches its target audience via the following:
Stormwater photographs and information provided via the Township's Facebook
page. This page is available to anyone via Facebook:
(https://www.facebook.com/pages/category/Community/Maidencreel-Township-
379072138773107)
Stormwater link on the Township's Website. This page is available to anyone with
internet access: (www.maidencreek.net/Stormwater.html )

Pamphlets are available year-round to the public on the counter at Township Hall; a
sample is provided in the Appendix.
(https://www.dot.state.pa.us/public/Bureaus/BOMO/raindrainbrochure.pdf)
Posters are on display in the public area at Borough Hall; samples are provided in
Appendix.
Maidencreek Township is a member of the Berks County MS4 Steering Committee,
which provides a clearinghouse of county-wide stormwater information and activities
that are available to the public. A summary is included in the Appendix. Relevant
information and/or activities will be listed in the MS4 Annual Reports.
Direct contact with target audience members can be accomplished as deemed
necessary via search engine research (e.g., "Google") by the Township Manager.
Maidencreek Township's Manager is responsible for coilection, publication and
dissemination of stormwater-related materials to the target audiences.
1.4
BMP#3- Published Materials
1.4.1
Facebook
The photos section of the Township's Facebook page includes brochures dealing with
stormwater pollution and clean water.
Photos appear on the page timeline as they are posted.
The page URL is here (screenshots are provided in the Appendix):
(https://www.facebook.com/pages/category/Community/Maidencreel-Township-
379072138773107
1.4.2
Website
A link to MS4 Stormwater Regulations appears on the Township's home page. This
link connects to Berks County's Stormwater Management Program web page, which
in turn contains several links to state and federal stormwater resources.
The page URL is here (screenshots are provided in the Appendix):
(www.maidencreek.net)
1.4.3
Pamphlets
A stormwater pollution pamphlet is available year-round to the public at the counter
at Township Building; a sample appears in the Appendix.
1.4.4
Posters

Posters are on display year-round in the public area at Township Building; samples
are provided in the Appendix.
1.4.5
Quarterly Utility Billing Statements
Utility and trash billing statements include a short reminder on stormwater; e.g.,
"When it rains it drains."
1.4.6
Berks County MS4 Steering Committee
The BCMS4SC meets quarterly to discuss stormwater-related regulations, activities
meetings.
1.5
BMP#4-Additional EducationalMaterials
Maidencreek Township reaches its target audience via pamphlets and its website.
In addition to the BMP #3 outreach requirements, the Township distributes
stormwater information via posters, Facebook and billing statements.

APPENDIX A
BMP #1 - PUBLIC EDUCATION AND OUTREACH PLAN (MS4 STEERING
COMMITTEE)

Resolution # 14-Q017
A RESOLUTION OF THE BOARD OF SUPERVISORS OF THE
TOWNSHIP OF MAIDENCREEK, BERKS COUNTY,
PENNSYLVANIA ENTERING INTO A MEMORANDUM OF
UNDERSTANDING WITH THE BERKS COUNTY
CONSERVATION DISTRICT.
WHEREAS, the Berks County Conservation District (BCCD) administers the Erosion and
Sediment Control Program for the Pennsylvania Department of Environmental Protection; and
WHEREAS, the Township desires to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth from earth disturbance activities; and
WHEREAS, the Township of Maidencreek (Township) previously had a Memorandum of
Understanding with the BCCD dated December 2002, and August 9, 2012; and
WHEREAS, new Federal and State regulations require the revision of the existing Memorandum
of Understanding.
NOW, THEREFORE, be it RESOLVED by the Board of Supervisors of the Township of
Maidencreek, Berks County, Pennsylvania and it is hereby resolved by the authority of the same
to enter into a Memorandum of Understanding with the Berks County Conservation District and
adopt the agreement attached as Exhibit A.
All other resolutions or parts of resolutions inconsistent with this Resolution are hereby repealed
insofar, but only insofar as the same are inconsistent herewith.
RESOLVED AND ADOPTED by the Board of Supervisors of the Township of Maidencreek,
Berks County, Pennsylvania, in lawful session duly assembled this 9th day of February, 2017.
Board of Supervisors
Maidensreek Township
Berks County, Pennsylvania
Joseph E Rudderow III
Attest:
David Franke
Diane Hollenbach
Claude Beaver

EXHIBIT A

MEMORANDUMOFUNDERSTANDING
Received
Between the
FEB 2 7 2017
BERKS COUNTY CONSERVATION DISTRICT
Berks County
Conservation District
and
Maidencreek Township
This Memorandum has been prepared jointly and agreed upon by each party for the following purposes:
To serve as a joint commitment by the signatory parties to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth which may result from the conduct of earth disturbance activities in
mclidencreek Tewnsh.p
("Municipality").
I. In carrying out the intent of this Memorandum, the Berks County Canservation District ("District") shall:
1.
Provide the Municipality with District project application packets and promptly notify Municipality of any
changes in the plan review fee schedule.
2.
Receive and review all Erosion and Sedimentation Control Plans ("E&s Plan" or "plan") for earth
disturbance activities 5,ooo square feet or greater, which are required to be written in accordance with
Chapter 102.4 of the PA Code.
3.
Within ten (10) working days of completion of review, notify the consultant, the applicant, the
Municipality, and the municipal engineer of all E&S Plan/NPDEs Permit approvals, deficiencies, and all
determinations including all project inspection reports and valid complaint inspection reports. Providing
.this information supports the Municipality with respect to Municipality's Ms4 reporting requirements as
required to satisfy Minimum Control Measure #4 related to services provided under this Memorandum.
4.
Notify the consultant, the applicant, and the Municipality that a Plan submission has been returned
based on either the lack of response within the specified time period or the lack of the development of a
complete Plan in compliance with PA Department of Environmental Protection (PA DEP) Chapter 102
Erosion and Sediment Control Rules and Regulations.
5.
Upon request, provide all applicants with the PA DEP Erosion and Sediment Pollution Control Program
Manual and related forms, worksheets, checklists, etc., necessary to successfully prepare a Plan.
6.
Upon the filing of a complaint by the Municipality and/or a third party, the following will occur:
a. The District will inspect the complaint within (1o) ten calendar days of its receipt.
b. If warranted, the District will provide documentation of the associated findings. The source of the complaint
shall remain anonymous in accordance with PA DEP policy.
7.
Serve as the repository for all Plans, complaints, Earth Disturbance Inspection Reports, correspondence,
etc., within the limitations stated by PA DEP, that involve earth disturbance activities within the said
Municipality. All such information, except the complaint forms, shall be contained in a filing system
which shall be available for inspection by Municipal officials upon receipt of a formal written request.
8.
When requested by the landowner, provide technical assistance in the develiopment of needed
Agricultural E&s Plans and Manure Management Plans. 09/7/2016
ISbs2k11)sharedVADMIN\MOUs. Agreements, Contracts\MOU'sIMOUs for Municipalities)MEMORANDUM OF UNDERSTANDING 9.7-16.dacx

In carrying out the intent of this Memorandum, the Municipality shall:
1.
Retain a sufficient quantity of the District's project application packets and provide such packets to all
parties for projects that require a review. The Municipality shall provide instructions to have the Plans
(residential, commercial, industrial, timber harvest, agricultural expansion construction, etc.) for earth
disturbance activities greater than or equal to 5,ooo square feet, which are required to be written in
accordance with Chapter 102.4 of the PA Code, submitted to the District for review per Chapter 102 of
the PA Code.
2.
Notify the District within (5) five days of receipt of an application for a project disturbing greater than or
equal to (1) one acre, pursuant to Chapter 102.42.
3.
Pursuant to Chapter 102.43, the Municipality shall not issue building or other permit or approval to
those proposing or conducting earth disturbance activities requiring a PA DEP permit until the PA DEP or
District has issued the E&S or individual NPDES Permit or approved coverage under the general NPDES
Permit for Stormwater Discharges Associated with Construction Activities under Chapter 102.5.
4.
Forward all questions pertaining to the preparation of Plans and applications to the District.
5.
Forward all third party complaints about ongoing earth disturbance activities to the District for its
inspection.
6.
Not issue final close-out, or grant final release of improvement/E&S escrow until the applicant has
submitted a Notice of Termination for all NPDEs Permitted activates and received Permit termination
correspondence from the District.
Forward to the District, any third party agricultural complaint relating to: nutrient pollution and sediment
pollution.
8.
The District highly recommends that the Municipality necessitate the development of written
Agricultural E&s Plans, which are required under Chapter 102.4 for agricultural plowing or tiling
activities and animal heavy use areas disturbing 5,oo0 square feet or greater of land, as well as
necessitate the development of Manure Management Plans, before building permits for agricultural
for all farming operations that land apply manure or agricultural process wastewater, whether they
generate the manure or import it from another operation. All farming operations that include an Animal
Concentration Area (ACA) or pasture must also have a written Manure Management Plan. In addition,
the Municipality should not issue a building permit, or other permit or approval, to those proposing to
and stamped by a professional engineer.
This Memorandum of Understanding shall become effective immediately. It shall be reviewed as the need
arises by either or both parties, and may be amended by mutual consent of both parties. This Memorandum of
Understanding may be terminated at any time, by either party, following a thirty (30) day written notice to the other
party.
maidencreek bwnshig (municiality)
FOR
L-b-8
DAte
By:
Fiper znar
dare.
Attest:
FORTHE
CRKSCOUNTKCONSERVAJIONDISTRICT
3/29/i7
CHAIR
DATE
IShs2kyAsharedVADMIN\MOUs.Agreements.Contracts/MOU's/MOUsforMunlcipalltlesIMEMORANDUMOFUNDERSTANDING9-7-16.docx

MS4
BERKSCOUNTY
STEELIMGCOMMITTEE
TO:
DEP
FROM:
Ashley Showers, Berks County MS4 Steering Committee and Cooperative
Education Program
RE:
Berks County MS4 Steering Committee 2021-2022 Annual Report Information
DATE:
September 6, 2022
The Berks County MS4 Steering Committee and Cooperative Education Program
was formalized through an intergovernmental Agreement and Cost Sharing
Agreement in 2018. The member municipalities pay annual fees toward
education programs provided by the three educational partners. The educational
partners are the Berks County Planning Commission, Berks County
Conservation District and Berks Nature. (See member list on Pg. 2)
The attached excel worksheets depict the numerous educational programs that
were held from July 2021 through June 2022 by the educational partners which
educate the target audience groups on topics related to stormwater. It should be
noted that the timeframe of this annual report was during the Covid-19 pandemic
Also attached are several presentations that were produced by the educational
partners for circulation and use by the member municipalities as well as several
outreach materials. Additionally, during this report period the Steering Committee
established a YouTube channel to promote the video entries of the annual
Student MS4 Video contest as well as training videos prepared by the education
partners. You can view the videos here:
https://www.youtube.com/channel/UCeTtxKsyrg WdK5MxSKZ5G-g/featured
If you have any questions regarding these activities, please feel free to contact
me at ashowers@countyofberks.com.

Page 2
The Berks County MS4 Steering Committee is comprised of the following municipalities:
Alsace Township-GP
Mt. Penn Borough-GP
Amity Township-GP
Maidencreek Township-IP
Bechtelsville Borough-IP
Mohnton Borough-Ip
Bern Township-GP
Muhlenberg Township-GP
Birdsboro Borough-GP
Ontelaunee Township-IP
Boyertown Borough-Gp
City of Reading-IP
Robeson Township-GP
Colebrookdale Township-GP
Robesonia Borough-GP
Cumru Township-IP
Shoemakersville Borough-GP
Exeter Township-GP
Shillington Borough-IP
Fleetwood Borough-GP
Sinking Spring Borough-GP
South Heidelberg Township-GP
Heidelberg Township-GP
Spring Township-IP
Kenhorst Borough-GP
Tilden Township -GP
Laureldale Borough-GP
Topton Borough-IP
Leesport Borough-GP
Washington Township-IP
Wernersville Borough-GP
Lower Heidelberg Township-GP
West Reading Borough -IP
Womelsdorf Borough-IP
Wyomissing Borough-IP

Berks County Municipal Separate Storm Sewer System Steering Committee
Public Education and Outreach Plan
Background
Portions of municipalities throughout Berks County are located within the United States Bureau of the Census'
designated urbanized areas. Therefore, the specific municipality is required to have a Small Municipal Separate
Storm Sewer System (MS4) permit as outlined by Pennsylvania Department of Environmental Protection's (PA
Public Education and Outreach Plan (PEOP), which is detailed below and in the attached table entitled General
Public Education and Outreach Program Plan.
In accordance with the PA DEP MS4 Permit requirements, the municipalities that comprise the Berks County MS4
Steering Committee are implementing the public education, outreach, and involvement requirements of the Permit
through a cooperative effort. (See attached list for municipalities) Each Ms4 Permit Holder, who is located within
Education Program. The Berks County Planning Commission, Berks County Conservation District and Berks
Nature (Formally the Berks Conservancy) (in this document, referred to as the Education Program Partners)
Committee and follows the PA DEP Protocol for the education/outreach portions of the Minimum Control
Measures (MCM) #1, #2, #6 specifically, along with certain educational information overlaps for MCM #3, #4, and
#5.
Goals and Intended Use of this Plan & Matrix
The goal of the PEOP for the participating municipalities of Berks County MS4 Steering Committee is to ensure
that the various target audiences are educated about the impacts of stormwater discharges on water bodies and
the steps that the public can take to reduce pollutants in stormwater runoff. The Berks County MS4 Steering
actions needed, responsible parties, etc. This narrative and matrix are intended to meet the measurable goals of
MCM1, BMPs 1 through 2 (relating to creating and maintaining a Public Education and Outreach Plan and
identifying and listing a target audience).
This narrative and matrix PEOP is to be reviewed, amended, and/or adopted by each participating member
municipality that is a member of the Berks County MS4 Steering Committee on an annual basis.
The Education Program Partners submit a quarterly update to each participating municipality on the public
education and outreach opportunities that the Education Program Partners have offered in the corresponding
Day events).
Target Audience
The below list is the PEOP's groups and individuals identified as target audiences for educational efforts. The list
below also identifies community stakeholder organizations that focus on particular target audiences, provides
public education materials, and educational offerings regards to stormwater in Ms4 municipalities.
> General Public
oSchools (Lead: Berks County Planning Commission, all educational partners)
o Residents/Homeowners (Lead: Berks Nature, all educational partners)
Agricultural Community (Lead: Berks County Conservation District, all educational partners)
Businesses
Developers/Engineers (Lead: Berks County Conservation District, all educational partners)
MunicipalEmployees
Public Works (Lead: Berks County Planning Commission, all educational partners)
Solicitors (Lead: Berks County Planning Commission, all educational partners)
Approved by the Berks County MS4 Steering Committee, January 15, 2015
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016

Berks County Municipal Separate Storm Sewer System Steering Committee
Public Education and Outreach Plan
The Berks County Ms4 Steering Committee has identified that the target audiences primarily interact with the
Berks County Planning Commission, the Berks County Conservation District and Berks Nature, however other
groups that the target audience may interact with include:
Residents: Watershed Associations, Trout Unlimited, Land Conservancies
Business/Developers: Chamber of Commerce, Economic Development Agencies
Schools: Berks County Intermediate Unit
Municipal Employees: Berks County Public Works Association, Albright College's Center for Excellence in
Local Government, PA State Association of Township Supervisors
Municipalities and Education Program Partners may outreach to target audiences directly (i.e., community
Public Works Association meeting).
The enclosed Matrix details specific education and outreach efforts that will be undertaken on a yearly basis,
although this Matrix's main purpose is to satisfy MCM #1. The Berks County MS4 Steering Committee believes in
a multi-disciplined approach to educating target audiences, thus, various education efforts for other MCMs are
included here as well.
Approved by the Berks County MS4 Steering Committee, January 15, 2015
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016

Maintain Cooperative
Works Association to
municipal employees
education plan using
Berks County Public
stormwater program
information & formats
Municipal Employees
Update target listing
municipal contacts
for dissemination of
Annually, update
municipality and
Education Plan
Coordinate with
- Review current
feedback from
education plan
Coordinate with
maintain listing
regarding all
information
 Coordinate
annually
Webpage on the Berks
Commission's Website
and Schooi Districts to
Berks County Planning
Maintain Cooperative
education plan using
Steering Committee's
websites to the MS4
respective municipal
information annually
feedback from local
- Distribute stormwater
education facilities
municipality, BCIU,
Annually, update
Update & assess
Include a link on
County Planning
Education Plan
Coordinate with
Review current
education plan
Commission will
maintain listing
Schools
update website
annually
annually
General Public Education and Outreach Program Plan
MCM #1 -- Public Education and Outreach on Stormwater Impacts
- Review current education
development community
Conservation District to
Berks County Planning
Commission will update
Webpage on the Berks
Commission's Website
Steering Committee's
Maintain Cooperative
Distribute Stormwater
education plan using
- Update target listing
Public Education and Outreach Plan
feedback from local
websites to the MS4
respective municipal
information annually
Developers
Annually, update
Update & assess
County Planning
Include a link on
municipality and
Education Plan
website annually
Coordinate with
maintain listing
annually
plan
Chamber of Commerce
Webpage on the Berks
Commission's Website
Berks County Planning
businesses & Chamber
Steering Committee's
Distribute stormwater
Maintain Cooperative
websites to the MS4
- Update target listing
respective municipal
information annually
education plan using
feedback from local
to maintain listing
Update & assess
Include a link on
County Planning
Businesses
municipality and
Annually, update
Commission will
Coordinate with
Education Plan
update website
- Review current
education plan
of Commerce
Approved by the Berks County MS4 Steering Committee, January 15, 2015
annually
annually
Webpage on the Berks
Commission's Website
Coordinate & maintain
Berks County Planning
Maintain Cooperative
Steering Committee's
target listing annually
education plan using
Distribute stormwater
websites to the MS4
respective municipal
Review and update
information annually
municipal contacts
Annually, update
County Planning 
Include a link on
Update & assess
Education Plan
Commission will
Residents
Review current
education plan
feedback from
update website
annually
listing
educational and informational
Develop and maintain lists of
items including links to DEP's
Annual Publication - Publish
Develop, implement and
maintain a written Public
Education and Outreach
target audiences in area
and EPA's stormwater
websites on municipal
Program (PEOP)
BMP#3
BMP#1
BMP #2
websites
BMP#4

opportunities exist for
practices and re-vise
Review current PIPP
Determine additional
Review effectiveness
education materials
Municipal Employees
Review advertising
ordinance adoption
of public meeting to
Determine if other
requirements with
needs, if any, for
determine content
effectiveness of
municipalities for
distribution of
where needed
distribution
involvement
Determine
encourage
practices
process
Intermediate Unit
Work with educational
format each year and
Review current PIPP
facilities to encourage
education materials:
work with education
meeting each year to
Presentations
Review distribution
input and feedback
Conduct one public
distributions
Encourage review,
In-Class
community to
effectiveness
Schools
email
discuss the
determine
practices
(**See specific Public Involvement and Participation Plan for Specific Activities/Goals)
input
community to encourage
Erosion & Sediment
Work with development
Flyer attached to all
Encourage review, input
work with development
discuss the Stormwater
Control Plans and
format each year and
Review current PIPP
entities to determine
education materials:
NPDES Permits
meeting each year to
Review distribution
MCM#2-Public Involvement / Participation**
Conduct one public
Public Education and Outreach Plan
Presentation
Developers
Workshop
effectiveness
and feedback
practices
ndu!
Reviewed, updated, and approved by Berks County MS4 Steering Committe, April 28, 2016
Encourage review, input
discuss the Stormwater
format each year and
Newsletter article
Review current PIPP
education materials
Review distribution
Work with business
meeting each year to
work with business
Conduct one public
Brochures at
Businesses
encourage input
Chamber of
Commerce
community to
effectiveness
community to
and feedback
determine
practices
Approved by the Berks County MS4 Steering Committee, January 15, 2015
 Newsletter article
Review current PIPP
education materials:
meeting each year to
Review distribution
format each year to
Update practices to
involvement where
Conduct one public
At community
Encourage public
review, input and
Residents
effectiveness
expand public
events
discuss the
determine
practices
possible
feedback
Involvement and Participation
opportunities for review input
Solicit public involvement and
participation from the target
Develop, implement and
educational materials to
maintain a written Public
Prior to any adoption of
Permit provide notice &
Distribute stormwater
target audiences
Program (PIPP)
and feedback
BMP#2
BMP#1
BMP#3

and format for future
determine if there are
Municipal Employees
Municipal Employees
Identify future needs
Document all PIPP
Municipal Employees
municipalities to
existing program
any issues with
meetings and
Work with
activities
activities
water topics at various
Encourage feedback
programs regarding
for future meetings
Conduct education
Management Plan
Document all PIPP
Berks County Planning Commission will continue to make comments regarding stormwater management
Schools
Schools
Schools
Stormwater
activities
schools
Illicit Discharge Detection and Elimination (IDD&E)
Encourage feedback for
MCM #4 - Construction Site Stormwater Runoff Control
Management Plan
Document all PIPP
Public Education and Outreach Plan
Developers
future meetingsl
Developers
Developers
activities
Distribute educational materials that explain the IDD&E program
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016
Encourage feedback for
Management Plan
Document all PIPP
Businesses
future meetings
Businesses
Businesses
from attendees and other stakeholders
Approved by the Berks County MS4 Steering Committee, January 15, 2015
activities
MCM
Encourage feedback
for future meetings
Management Plan
Document all PIPp
Residents
Residents
Residents
Stormwater
activities
Provide educational outreach
employees, property owners,
elected officials about IDD&E
Encourage the use of Low
to public employees,
business owners and
audience groups
BMP #6
BMP#5

employees on how to
maintain and update
maintain and update
Municipal Employees
their O & M program
throughworkshops
Educate municipal
activities that have
for their operations
pollution potential
and activities from
municipalities to
facilities and
Work with
BMP #1
Schools
Public Education and Outreach Plan
Developers
Businesses
Residents
are owned or operated by the
policies and procedures
Management practices,
Controls for reducing or
operations and facilities ID in
eliminating discharge of
Maintenance activities,
inspection procedures
procedures for wastes
Impact Development (LID)
new, re-development and
facilities and activities that
Identify and document all
Develop, implement and
maintain a written O & M
program for all municipal
maintenance of BMPs
permittee and have a
schedules and
Education regarding
pollution potential to
Proper disposal
pollutants
removed
stormwater.
BMP #6
retrofits
BMP#1
BMP#2

municipal employees
g preventing
Training will include
Identify and include
 other relevant parts
 other personnel that
employee training
may have contact
event to educate
potential for the
with stormwater
d annual
eof
regarding 
discharge 
pollutants
Hold
Public Education and Outreach Plan
Employee Training Program
Develop and Implement
BMP#3

Municipal Empl.
MCM 6 (Pollution
 Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 5 (Post
Construction
 Stormwater
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM4(Construction
Municipal Empl.
Schools
Control)
g Commission
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
 Planning
Developers
Businesses
Residents
Municipal Empl.
s County!
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Buslnesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Businesses
Residents
School District, Municipalitles, Countywide
Targeted Audience
 Completely funded by other program
 Program Name, Date and Description

Municipal Operations)
Muntcipal Empl.
MCM 6 (Pollution
Prevention&Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Emp.
MCM 5 (Post
Construction
Stormwater
Mangement)
Schools
Developers
Businesses
Residents
MCM 4 (Construction
Site Stormwater Runoff
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Buslnesses
Residents
Municlpal Empl.
MCM 2 (Public
Invoivement &
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Businesses
Residents
School Districts - Antietam, Brandywine Heights, Conrad
Weiser, Daniel Boone, Exeter, Fleetwood, Govenor
School District, Munlclpalities, Countywide
Perkiomen, Wilson, and Wyomissing.
Targeted Audlence
Spring Township
City of Reading
Community Garden. Provide education on soil health and
2021-2022 School Year - Berks County Trout-In-The-
* funded partially by BCMS4 Educatlon Program
Completely funded by other program
Program Name, Date and Description
Classroom.
composting.
Residents.

Municipal Operations)
Municipal Empl.
MCM 6 (Polltion
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Constructlon Stormwater
Municlpal Empl.
MCM5 (Post
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM4(Construction
Municipal Empl.
 Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
JING Berks Nature
Schools
Developers
Businesses
Residents
Munitclpal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Buslnesses
Residents
School District, Municipalities, Countywide
Countywide about 250 people and riders
Targeted Audience
County Wide 200 kids
Completely funded by other program
Program Name, Date and Descriptlon
^9/25/2021 Rideforthe River

Munlclpal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 5 (Post
Construction
Mangement)
Stormwater
Schools
Developers
Businesses
Residents
MCM4(Construction
Site Stormwater Runoff
Municipal Empl.
Control)
5chools
ING Berks County Planning Commission
Developers
Businesses
Residents
Municlpal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
2021 MS4 4th QUARTER PROGRAMMII
Developers
Buslnesses
Residents
School District, Municipalities, Countywide
Targeted Audience
Countywide
* funded partially by BCMS4 Education Program
Completely funded by other program
Program Name, Date and Description

Municipal Operations)
Municipal Empt.
MCM 6 (Pollution
housekeeping for
Prevention & Good
Schools
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCM5 (Post
Mangement)
Schools
Developers
Businesses
Residents
 Site Stormwater Runoff
MCM 4 (Construction
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schaols
Developers
Businesses
Residents
Education & Outreach)
Municlpal Empl.
MCM1 (Public
Schools
Developers
Businesses
Residents
School District, Municipaltties, Countywide
Targeted Audience
Berks County
Berks County
December 21, 2021 - Presentation to Berks Career &
Completely funded by other program
Program Name, Date and Description
Without Really Trying (2 Sessions)

Municipal Operations)
Municipal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCM5 (Post
Mangement)
Schools
Developers
Businesses
Resldents
Site Stormwater Runoff
MCM4 (Construction
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (1DD&E)
s Nature
Schools
Developers
Businesses
 Berks
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
IMING
Developers
Businesses
PROGRAMI
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
2021 MS44th QUARTER
Businesses
Residents
Advertised County wide done in Tully watershed 35
School District, Municipalities, Countywide
Targeted Audience
Countywide
people
cumru
Completely funded by other program
Program Name, Date and Description
A 10/9/2021 Cumru Fall fest tabling

Municlpal Empl.
MCM 6 (Pollution
 Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 5 (Post 
Construction
Mangement)
Stormwater
Schools
Developers
Businesses
Residents
MCM4 (Construction
Site Stormwater Runoff
Municipal Empl.
5chools
Control)
MMING Berks County Planning Commission
Developers
Businesses
Resldents
Municipal Empl.
MCM3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Education&Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
2022 MS4 1st QUARTER PROGRAMI
Businesses
Residents
School District, Municipallties, Countywide
Targeted Audience
Countywide
Completely funded by other program
Program Name, Date and Description
MS4 and Your Municipality

Municipal Operations)
Munlcipal Empl.
MCM 6 (Polution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Emp.
MCM 5 (Post
Construction
Stormwater
Mangement)
Schools
Developers
Businesses
Residents
MCM4 (Construction
Site Stormwater Runoff
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM3 (IDD&E)
Developers
Businesses
Resldents
Municlpal Empl.
MCM 2 (Public
Involvement&
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Residents
School Districts - Antietam, Brandywine Heights,
Conrad Weiser, Daniel Boone, Exeter, Fleetwood,
School District, Munlcipalltles, Countywide
Upper Perkiomen, Wilson, and Wyomissing.
Wyomissing Borogh/school District
Tulpehocken Watershed
Targeted Audience
Washington Township
Public
March 30, 2022 - Atonement Preschool - Enviroscape
March 26,2022-Barrels and Beer Rainbarrel Workshop
Association Presentation -Updated Assoc. on water
2021-2022 School Year - Berks County Trout-In-The-
March 14, 2022 - West Branch Perkiomen Live Stake
* funded partially by BCMS4 Education Program
Program Name, Date and Description
quallty projects.
Demonstration
Classroom.
Volunteers

ME
MCM6
ME
MCM5
MCM4
ME
PROGRAMMING Berks Nature
MCM3
ME
MCM2
ME
MCM1
2022MS4 1st QUARTER
# attendees
School District, Munlcipallties, County wide
Wernersvllle (but advertised county wide)
Targeted Audience
Tulpehocken SD
County Wide
County Wide
ExeterSD
ExeterSD
*3/24/2022 Reiftann School in classs enviroscape.
* 3/25/2022 Reiftann School in classs enviroscape.
A Completely funded by other program
*3/12/2022 Well water testing and outreach
3/29/2022 Wernersville Library Invasive Vs
Program Name, Date and Description
 3/30/2022 Tulpehocken SD field Trip (FT)
Place Enviroscape
native

Municipal Operations)
Munlclpal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 5 (Post
Construction
Stormwater
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM4(Construction
Municipal Empl.
Schools
Control)
Developers
Businesses
Resldents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Businesses
Residents
School District, Municipalities, Countywide
Targeted Audlence
Countywide
* funded partially by BCMS4 Education Program
Program Name, Date and Description
Completely funded by other program
Coordinators : MS4, Source Water Protection land

Municipal Empl.
MCM 6 (Pllution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCM 5 (Post
Mangement)
Schools
Developers
Businesses
Residents
MCM 4 (Construction
Site Stormwater Runoff
Municipal Empl.
Control)
Schools
Berks County Conservation District
Developers
Businesses
Residents
Municipal Empl,
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Publlc
Schools
Developers
Businesses
Residents
Education & Outreach)
2022 MS4 2nd QUARTER PROGRAMMING I
Municlpal Empl.
MCM 1 (Publlc
Schools
Developers
Businesses
Residents
Sinking Spring Borough, South Heidelberg Township.
e, uckn, chylkilalley, Ktwn
School District, Municipalitles, Countywide
Govenor Mifflin, Oley, Muhlenberg, Hamburg
Wilson School District
Kutztown School District
Hereford Elementary
Targeted Audience
Oley Valley Library
High School Students
Bern Township
Spring Township
Berks County
Berks County
Berks County
City of Reading
Berks County
Twin Valley
City of Reading
Countywide
May 11th, 2022 - Municipal Riparian Buffer Maintenaince
an Ag Container Garden Workshop - Soil health workshop
June 22, 2022 Don Hartman Conservation Leadership
June 23, 2022 -Spring Township Creek Exploratlon 
June 29, 2022 - County DES - Municipal Emergency
Completely funded by other program
Program Name, Date and Descrlption
May 10-12, 2022 Wilson Field and Stream Days
June 17, 2022 Library Program re: Macros and
Famity watershed and waterquality education
April, 2022 Paint the Rain -Rainbarrel contest
April 23, 2022 Conservation Celebration
April 4, 2022 Contractor Workshop
June32022 Vegetated Swale Video
April2, 222 Seeding Sale
Celebration - Table Display.
Release re:Rain Gardens
Enviroscape
Watersheds
education

ME
MCM 6
ME
MCM 5
ME
MCM 4
ME
MCM3
ME
MCM2
ME
MCM 1
100
100
# attendees
School District, Municipalfties, County
Wernersville (but advertised county wide)
Targeted Audlence
Reading (Alvernia Students)
wide
Brandywine Heights FT
Upper Perkiomen SD
Muhlenburg SD
Muhlenburg SD
Tulpehocken SD
Gov Mifflin SD
GovMifflenSD
Twin Valley SD
Gov Mifflin SD
Oley Valley SD
Wyomissing SD
Gov Mifflin SD
County Wide
County Wide
County Wide
County Wide
County Wide
CountyWide
Gov Mifflin SD
County wide
Reading SD
Reading SD
Reading SD
Reading SD
County Wide
Weiser SD
Reading SD
Reading SD
Reading SD
Reading SD
Weiser SD
Wesier SD
Wilson SD
Reading SD
Reading
Reading
^ Completely funded by other program
4/23/2022GirlScouts and citizen science water
Program Name, Date and Description
^4/25/2022 Alvernia Field Trip Water Quallty
 4/28/2022 Wernersville Library Owl Pellets
 6/12/2022 Family Fishing at Stonecliffe Park
4/16/2022Berks Nature Drop off Kids Day
A 5/13/2022 Oley Valey Midle School FT
* 5/24/2022 Southern Middle School FT
* 5/27/2022 Northeast Middle School FT
A5/31/2022Gov Mifflin PreK Counts FT
*5/19/2022Southern Middle SchoolFT
A 5/13/2022 Girl Scouts and Eco Friend
 5/20/2022Southern Middle School FT
^ 6/1/2022 Gov Mifflin Pre K Counts FT
* 6/2/2022 Northeast Middle School FT
* 4/20/2022 Gov Miffin Trauma Kids
A5/10/2022Robeson Elementary FT
 4/29/2022 Brandywine Heights FT
^ 5/21/2022 Berks Drop Off Program
4/29/2022 Story Hike and Smores
* 5/26/2022Millmont EcoFun Day
 5/28/2022Girl Scouts Eco Learner
 5/27/2022 Wilson Teachers FT
*4/22/2022 Weiser Field Trip
* 4/28/2022 Weiser Field Trip
* 4/11/2022 Weiser Field Trip
5/7/2022GovMiffin Regatta
5/12/2022 Reading Gifted FT
5/6/2022PennBernvilleFT
* 4/5/2022 Muhlenberg FT
 5/3/2022 Reach Cyber FT
* 4/6/2022 Muhlenberg FT
 5/25/2022 Wyomissing FT
 6/24/2022 Kindercare FT
*4/1/2022GovMifflinFT
* 4/27/2022 La Salle FT
 5/4/2022 Hereford FT
* 5/5/2022St Ignatius FT
^6/21/2022 Olivets Ft
quaility

APPENDIX B
MCM #1 - PUBLIC EDUCATION AND OUTREACH ON STORM WATER IMPACTS
BMP #3 - PUBLISHED EDUCATIONAL ITEMS

Web Cover Page

8:46 
9//4/2
Not syncing
Norhern erka Regonel Pois Dapartmen?
Nornen Berks Emangency Medal Service
EMERCENCY SERVICES
Bundon Fim Compary
tax cslacor irtor-325n.
PAY YOUR WATER AND SEWER BILLS
sepueBe
water and sever bns.
e$*ul l. ulieb da rysols?iw' The u+ af sst*+ Hled L'a! ?
PARK ANG RECREATIO%
rertal in5emrien
EUC A TCAAED UE JOPOA/S
Thureday. Sepeiniber 22. 2022 Faras and Recweicn Bour Meeng at 7:00m
www.maidencreek.net
UPCOMING MEETINGS
Not secure 1
irfemates pruel rd resa riens. Laks ta
Click to wew Board etberg, stal centas

Not syncing
pm Park&Ree Mi
Maidencreek Township
Cone tafice Cn Tm
www.maidencreek.net
Not secure

Berks County Stormwater Web Page

TRANSLATE
ueiod teloen 2 30) hdde 01 panber oan snsua 000z oe pup snsus 0661 sun kg ouyap se _eai pazhegi, tre un
To meel the NpDES permnit renulements each munlcipality submis a permit application to OEP. The permit pertod runs tor fve
Forgot My Password
SubscrbeRegsier
Consiruction Sile Storm Water Punorf Conmircl, S. Post-Consiucion Stam Water Management in llev Developmenl and
2. Pubic Paricipation, 3. ticit Oischarge Detection and Elmination. 4.
For intomation on Act 187 Stormwater Mtanagement ordintances please contact the municipattiy ln which the.
Coebrgiro1g te sn es or aay pay as2ae coeuuoitul ounj oa pnor Jo suoneanb Ae aay noh 1
Pirecompamles
COUNTY OF BERKS
Police Depaitmente
Berks County's Stomwater Management Program
List dl us4s ysn Urbanzed reas n Penmrhmni?
PENNSYIVANIA
controd measires fmcm): 1. Pubic Education 
PA Slate Govemrient
Resotrce
MS4 Educaional Materints
Baks County Camprehensrve Pian
Aiunrcip Cont na Imiormahon
TrnaponationRead ng MPC
wrat ocule yce itre to find?
Reter to Depa trnent She
Heors 8 AM io 5 PM
Chosed on tHolidey?
Roading PA 19601
Planning Topics
County at Berl
Caendar
About

ITRANSIATE
Forgot My Pasword
to meet the edutalinn and catrezch pevit requiemerts fer the NPDES progrdm. The cooperatnre education prograin focuses
SubmcnibeRepsser
Courty Conservalicn District, ard the Berks County Conservancy Frovice and repart upon a cooydiraled edueation eflad cn
Hin'mun Contra Measure rrat they retate lo. Matenias that are preprletary to the members of the MS4 Steering Consmitee.
es, aiong with tte educational parrers (Betks County Planring Commissien, Barks Court
These prognely malerials are for the tuse and clstibuion st
oug fa pesi ae sjeuasn, miag tayu are seaeus petorenpa snciea 'tedcud togeanps angeradoes sn o ded sy
on fre porion ot whe 6 minmun tontrol measures related to edutaicn and outreach.
can be found st tha Berks Couty Conservator Distict wehsle.
COUNTY OF BERKS
pA Stae Gove mment
Berks County MS4 Steering Committee
Iis4 Steering Commitee Members enly.
Resouues
2022 Student Vdeo Contest Rules
MsA Educations! Documerts
MSA REVOUTCE LKS
agresment in 20 t2.
Berks Counity Comorehensve Plan?
Wunicip Contad tniormnion
TteraportabonRe ang Mpo
DE
Pepaztment Hxits nay Yary
Rear to Depariment Sle
HourS 8AM to S FM
Chosed on Holidteys
Reang PA 19601
Prarming Topcs
Coumnty ol Berts
633 Court Shreet
GISMaaping

2022
STUDENTSTORMWATER
VIDEO CONTEST
MS4
BERKSCOUNTY
STEERING COMMITTEE
SON
SHOW OFFYOUR
VIDEO SKILLS
AND CREATIVITY
Createashortclipabout
yourlocal watershed.
You can:
-Record video
Take pictures
Create animation
Team up with friends
HAVE FUN!
All videos will beposted to
educate the community
$500
about watershed topics.
OPEN5.APRIL252022
CASHPRIZE!
ENDS:JUNE3,2022
CONTEST RULES HERE:
Www.co.berks.pa.us/Dept/Planning/Pages/MS4%20Cooperative%20Education%20Program.aspx

Pamphlet Available Year-Round on Counter at Township Hall

When It Rains.
hieay 'tases 'Tawow nok
tDrains
and How It Can Acrect
and the EnVironment
water! Contact your community's storm water management program
8, Storm Drain Inlet - Part of he storm sewer system.This is anather example pf what a storm drin.
may looklike,Lika the scarm drain inlet shawn in picaure 3anyhing tharenters chis drain wll go direcy
7. Roads and other Paved Areas - Not part of the starm scwer system, Roads and other hardened
6, Septic System - Not part of the storm sewer system. Homeowners use septic tanks to manage sanitary
5.Toilet - Not part of the storm sawer system, Wastewater from sinks and toilets in housos and businesses
4, Storm Sowor Outfall- Part ofthe torm sewer syxtam.An putfllis whara stam water drains fram.
prevent it from being used as a trash can.
trzval chrough a sewur system tonstructed co carry sanitary wastes. n some
Buisodsp kjete! dey uup wose pean tey ouaswos Jo wesks eug pm weiqad t eg pinai pein uut
disposed of hazardous materialsy travel diracty to a racaiving lake,rivsr,or straim withaut balng treated
system,as wall as directy co lakes, rivers,and screams.
wastes on-sicte.improperly maintained sepcic systems can laak and contribute pollutants to the storm sewer
3. Curb wich Storm Draln Inlet~ Part of the storm sewer system, Many People do not realize that this
af materials,
the storm sower system into a racaiving lake,stream,or river. f there is a flow from an outtall when it isn't
Z. Fire Hydrant- Not part of the storm sewer sysem.Warer sprayed from fire hydrants Is not storm
water, but is allowed by law co enter the storm sewar systam.
plpes.it can also incdlude ditches used to convey starm wacer from che land to a receiving take,river,or
stream.
I.Ditch -Pare of the storm sewer system. Most people think thar the system is lust a series of undarground
Answers to Test Your Storm Sewer System Savvy:
Where To Go To Continve the InFormation Flow
to the storm sewer system, and pollution prevention and good
the only thing that storm water contributes to our water is ...
coordinator or the Pennsylvania Department of Enviranmental
Pennsylvania Department of Environmental Protection
www.dep.state.pa.us
 inscances, older cammuniies
Chemicols used to grow and maintaln
Yehicles drip fuids (olf, grease,
make up storm sewer systems, It eventually flows directly to a
garoline, antifreeze, broke fluids,
Storm water is water from precipitation that flows across the
our storm drains and into our water.
pollutants storm water carries along the way empty into our
bedutiful fawns and gardens, if not
used properly, can run off into the
storm drains when it rains or when
Why is Storm Water "Good Rain Gone Wrong?
ground and pavement when it rains or when snow and ice
we water our fowns and gardens.
chemicals, dirt, and other pollutants as it flows or when it
call storm sewers. These are the drains you see at street
causes flooding and erosion of stream banks. Storm water
lake, river, stream, wetland, or coastal water. All of the
the draining water is called storm water runoff.
Waste from chemicals and materiais used in
canstructlon can wash into the storm sewtr
system when it rains. Soil that erodes from
shelifish populations that are important
construction sites causes ervironmental
degradation, including horming fish and
for recreation and our economy.
Pet wastes left on the
bacterld, parasites and
contributing harmfu!
viruses to our water.
ground get carried
What is Storm Water?

becomes a problem when pollutants from our activities like car
Properly dispose of hazardous substances such as used oil.
Pick up after pets and dispose of their waste properly. No
maintenance, lawn care, and dog walking are left on the ground
Look for signs of soil and other pollutants, such as debris
storm water and keep it on site instead of letting it drain
or leak to eliminate exposure of materiaks to storm water.
impact storm water runoff to your community. (See the
for rain to wash away. Here are some of the most important
and use containers for outdoor storage that do not rust
Stare materials that could polute storm water indoors
Use pesticides,fertilizers, and herbicides properly and
Rain by nature is important for replenishing drinking water
Install innovative storm water practices on residential
times of dry weathera sign that there could be a
supplles, recreation, and healthy wildlife habitats. It onty
back of this brochure for contact information.)
land to the storm sewer system to a stream.
What Everyone Can Do To Help
eficiently to prevent excess runoff.
Restoring Rain's Reputation:
docs.
Test Your Storm Sewer System Savvy!
What does the storm sewer system look like in
your community? See if yau can identify which
(Answers are on the back.)
water flowing over hardened surfaces
Flooding caused by too much storm
We can help rain restore its good reputation
while protecting our health and environment
are times it can do more damage
community. Keep reading to find out how...
such as roads and parking lots,
than good. Problems related to
storm water runoff can include:
while saving money for ourselves and our
nature's water cycle, but there
Rain is an inportant part of
populatlons becaust storm
water carries sediment and
Closed beaches due to high
fevels of bacteria carried by
pollutants that degrade
importont fish habitat.
Decreases in sportfish
swimming unsafe.
What Happens When If Rains?
More expensive treatment
harmful pollutants carred
by storm water imo our
technologles to remove
drinklng water supplies.
become ciogged with excessive
maintaining storm drains and
arnaunts of dirt and debris.
fncreases in spending on
NUMS

CL
EAI
MS4
WATER
BERKS COUNTY
STEERING COMMITTEE
Polluted runoff threatens the health of Berks County water resources. Please do your part at
home, work and play to help keep our waterways clear of pollution after rain and snow melt.
SCOOPIT!
CLOSEIT!
CATCHIT!
Petwasteisgrossand can
Rain water running off of trash
Industries'and businesses can
cans sends waste into nearby
make you sick. Bag and
keep oil, gas, and grease from
dispose of solid pet waste in
streams. Close your trash can
washing into streams. Use
lids, cover dumpsters, and
trash cans
drip pans to catch fluids. Keep
properly dispose of trash to
absorbent materials close by to
keep pollution locked away.
clean up small spills. Fix leaks
and clean up spills quickly

THANK YOU FOR RECYCLING
IT HELPSPROTECT OUR WATERSHEDS
MS4
BERKSCOUNTY
STEERINGCOHMITTEE
Recently, the Berks County MS4 Steering Commitee
with assistance from Sign Pros completed the
installation of the “Keeping Our Watersheds Clean"
sign at the Berks County Electronic Recycling Center
in Bern Township. The sign's purpose is to thank users
of the facility for correctly disposing their electronic
waste and other waste properly which protects our
water resources from pollution. The correct disposal
of electronic waste prevents contamination of surface
water when rainwater dissolves toxic chemicais
such as heavy metal compounds of barium, lead,
and mercury that rushes down to ponds, rivers,
and lakes. Additionally, electronic waste that is
disposed of inappropriately produces chemicals once
heated which are absorbed into the ground and into
groundwater. The Steering Committee invites you to
visit the Electronic Recycling center at 1316 Hilltop
Rd., in Leesport and view our sign.
To find out what is accepted at the Center please visit
https:l/bit.lylcleanWatersheds
0014

APPENDIX C
MCM #1 - PUBLIC EDUCATION AND OUTREACH ON STORM WATER IMPACTS
BMP #4 - ADDITIONAL EDUCATIONAL MATERIALS DISTRIBUTED

Facebook Screenshots:

80:6
Forgot Account?
Not syncing
ul 607
Password
app.my-waste.mobi
Time: Nov 11, 2021 07:00 PM Eastern Time (US and Canada)
 Learn more
WOON
https://us02web.z00m.us/j/83032987454... See more
See more of Maidencreek Township on Facebook
Email or phone
Create new account
Topic: Board of Supervisors Meeting
Maidencreek Township
November 11, 2021 ·
Join Zoom Meeting
Maidencreek Township
More -
See all
 See all
Log In
https://www.facebook.com/Maidencreek-Township-379072138773107
Events
Community
http://www.maidencreek.net
Photos
 2,089 people follow this
1,967 people like this
maidentwp@aol.com
(610) 926-4920
About
Community
About
Photos
Home
acebook

Posters On Display, Year-Round

unoh uoy buusng
treamside
Maiden Creek Watershed Association
www.sugarbushnursery.com
www.co.berks.pa.us/conservation
4272 Morgantown Road
Sugarbush Nursery
www.maidencreekwatershed.org
Mohnton, PA 19540
Brochure produced by Lehigh County Conservation District
Conservation District
1238 County Welfare Rd.
610-856-0998
To purchase native piants in Berks County:
Customized by Berks County Conservation District
3rd Weekend of May
Leesport, PA 19533
Kutztown, PA 19530
Berks County
Plant Sale
610-372-4657
Suite 200
610-683-3795
P. 0. BoX 68
For more information contact:
Hay Creek Watershed Association
Water Authority (RAWA)
4URSER
Hawk Mountain Sanctuary
www.haycreekwatershed.org
Brochure funded by
1700 Hawk Mountain Road
www.hawkmountain.org
Reading Area
Geigertown, PA 19523
Kempton, PA 19529
610-404-4292
P. 0. Box 162
610-756-6961
streamside area or garden. Vibrant flowers in the spring, colorful
They are beautiful, easy to maintain, and they attract wildlife.
specific environment --- the climate and conditions of this area.
Natives are therefore easier to grow and require far less mainte-
Native plants can provide year-round color and texture in your
berries in the summer, deep colors in the fall, and contrasting
Important local resources for native plants are listed on the
for our native birds, insects and other wildlife to thrive in the
habitat they need. Seeds from your native species can travel
bark and branch patterns in the winter are just some of the
flowers, grasses, shrubs and trees native to Pennsylvania.
Furthermore, native plants are much better adapted to our
Use the chart of plants inside as a guide to select ferns,
buffer, you are providing an excellent opportunity
environment on which we ourselves depend.
By planting native species in your streamside
nance than their non-native counterparts.
Native Landscape
The Benefits of a
Native plants and animals sustain the
back of this brochure.
environment.

can clog the streambed, covering rocks and gravel where fish lay their
source of silt and sediment is construction or any project that disturbs
use good farm practices like no-till cropping and pianting winter
Every stream carries with it, fine particles of soil. But too much soil
this area of Pennsylvania. Deer ticks can carry Lyme disease and are
breeding.Highervegetationmayabsorbmorewateranddecrease the
eggs. Excess sediment can choke out the life of a stream. A major
often found in areas of high grass and shrubs. Fear of ticks, however,
should not be a reason to maw your streambank to the edge. Some
retilamhbianbirdsandmallmammalsFishandaquat
Turfgrassdoesnotabsorbwateraswell asfull-heightvegetation
: consider mowing a path through the buffer to access the stream
contact your local county conservation offce if you see soi!
thoroughly if you have been walking through the woods or felds.
insectsarealsoprotectedbythepurifyingfunctionofabuffer.
. learn to recognize deer ticks and check yourself and your pet
cover piles of soil with tarps to protect them from rain
the soil. Farming &ctivities can also cause soil runof.
never store loose piles of soil near a stream
basic precautions will minimize this danger:
without having to walk through high grass.
Reductionofmosquitohabitat
Prevent Excess Sediment
run-off from a construction site.
opportunityformosquitostobreed.
To protect the strean from silt:
cover crops to conserve soil.
Wildlifehabitat
off a work site.
Fully grown vegetation slows the velocity of overland flows by providing
helps to recharge groundwater and reduces flood damage downstream.
limit your overall use of pesticides and herbicides, and use extreme
never dump trash or chemicals into streams, storm drains or sewers.
Most stream pollution comes from manure, fertilizers, road salts, oil
keep farm animals out of and away from the stream. Contact the
Natural vegetation removes pollutants and fine sediment from the
Deep rooted native plants hold soil in place and keep banks stable.
and other chemicais. Called non-point source pollution, these come
these pollutants add up in the streams and become a big problem.
compost, don't bag, yard waste. Leave lawn trimmings in place
Other accumulated pollution includes trash and yard debris that
don't store or dump manure, garden waste, or grass clippings
store frewood, trash, or other materials away from streams.
don't overuse fertilizers - more is not better - and don't use
Top Reasons Not to Mow
caution when using them near streams.
don't burn refuse near streambanks.
To protect a stream from pollution:
for effective recycling of nutrients.
Promotes bank stability --
Flood flow reduction -
washes into the streams.
fertilizer near streams.
Reduce Pollution
preventing erosion!
Water quality -
near streams.
around it. A streamside buffer (or riparian buffer) is a planted
Taking good care of a stream involves taking care of the fand
Using shrubs will give your buffer a quick start; many reach full size
Department of Environmental Protection (DEP) before making plans
Begin with a"no mow" or"no graze zone"along your stream banks.
It is best to work with professionals when looking for the causes of
A buffer of any width is more beneficial than grass. Make yours as
solve the problem. Contact your regional office of the Pennsyivania
long-lasting benefits and can be quite inexpensive to establish
Where you do have lawn, set your mower blades at least three
and solutions to erosion problems. Where buffers alone aren't
enough, there are many new and innovative techniques to help
Plant trees and shrubs in yotr buffer area. They provide many
to alter a streambank. Permits are likely to be required.
. helps control the temperature of the stream
 stablizes the bank and prevent erosion
Creating a Streamside Buffer
Stabilizing Your Streambank
area along the edge of the stream.
 absorbs nutrients and pollutants
A well-planted streamside buffer:
 reduces floodwater damage
filters out sediment
in just a few years.
wide as possible.
and maintain.
less fertilizer.

Caring for Streamside Buffers What to Plant?
Often, when left to grow up on its own,a streamside buffer will contain mostly weeds and other undesireable plants. One way to make sure this doesn't happen is to plant native plants. The plants
below represent just a limited selection of Pennsylvania's native species apprapriate for planting throughout the state along streams and in adjacent foodplains and wetlands. Choose plants
adapted far your soil conditions, and your garden will thrive with less watering and without the need for chemical fertilizers or pesticides. There are many resources to help hameowners with
native plantings.For some help,contact ane of the organizations on the back of this brochure, or visit one of the following websites: PA Department of Conservation and Natural Resources -
llustrationsbyErinFrederick,LehighCountyConservationDlstrict
Cinnamon Fern
Royal Fern
Sensitive Fern
Osumndacinnamomea
Osmunda regalis
Onocleasensibilis
Full sun to shade
Part shade
Full sun to shade
Wet to molst sofls
Consistently wet or
Wet to moist soils
Cinnamon-coloredfertile
saturated soils
Sunny or shaded swamps,
fronds: molst acidic soils
Unique form and texture
marshes, moist meadows
Photor Robert Mohlenbrock,USDA
Photo:Robert Mahlenbrock,USDA
Forms colonizing masses
Black-eyed Susan
Wild Bergamot
Blue Lobelia
Rudbeckiahirta
Monardafistulosa
Lobellasiphilitica
BloomsMaytoSeptember
BloomsMaytoJune
Blooms from JulytoOctober
Full sun to light shade
Moist to dry soils
Light shade
Fufl sun to light shade
Moist to dry soils
Wet to moist soils
Attracts birds and
Dry open woods,wet
Attracts hurmmingbirds
meadows, ditches,edge of
butterflies
woods and marshes
Bfue Vervain
Boneset
Wild Geranlum
Eupatorium perfoliatum
Verbenahastata
GeraniummaculatumL
Blooms July to August
Blooms JunetoSeptember
Blooms Spring and early
Light shade to full shade
Full sun to light shade
Summer
Wet to moist soils
Dry soils
Common in woodsand
Bright flowers; herbal uses;
Wet meadow species
meadows
streambanks and moist
Photo: Jennlfer Anderson @
Flowering Perennials
meadows
USDA-NRCS PLANTS Database
Purple Coneflower
Joe-Pye Weed
Echinaceapurpured
Vernonianoveboracensis
Eupatoriumfistulosum
Blooms April toSeptember
BloomsAugusttoSeptember
Blooms August to September
Full sun to light shade
Full sun
Light shade
Moist soils
Wet to moist soils
Wet to moist soils
Herbal uses
Tali plant with brilliant late
Attracts beneficial insects;
summerfowers
herbal uses
Blue Mist Flower
New England Aster
Common Sneezeweed
Asternovoe-angliae
Conocliniumcoelestinum
Helenlum autumnale
Blooms August to October
Blooms Julyto November
BloomsJulytoSeptember
Full sun to light shade
Full sun to fight shade
Full sun Consistently wet to
Moist soils
Wet to moist soils
moist soils
Showy and frequently
Good border plant or
Moist open areas along
colonizing ground cover,
cultivated;dry to moist
streams&ponds;wet
meadows
attracts butterflies
meadows
Sedge
Switch Grass
G725589
Virginta Wild Rye
Carex vulpinoidea
Panicum virgatum
Elymus virginicus
Blooms Summer
Blooms August to September
Blooms JunetoSeptember
Full sun
Moist Sos
Full sun to light shade
Consistentiy wet or saturated
Clumpgrass; can helpto
Wet to moist soils
soils
control erosion
Moist woods,meadows,
Swampy areas
Sandyand riversoils
stream banks
Photo:BonnieHarper,LadyBird
Johnson WildiflowerCenter
Photo:EPA
Buttonbush
Arrowwood
Highbush Blueberry
Vibunum dentatum
Cephalanthusoccidentalis
Vacciniumcorymbasum
BloomsJuneto September
Blooms May
Blooms MaytoJune
Full sun Consistently wet or
FullsuntofullshadeMoistsoills
Light shade
Dark bluefruits in fall;high
saturated soils
Wet to moist soils
Multi-stemmed;tolerates
wildlife value,streambanks,
Multi-stemmed;
inundation
pastures
edibte berries;fall color
Photo:Campbeli and LynnLoughmller,
Photoe Norman Flaigg.
very high wildife value
Lacy Bird Johnson Wildflower Center
LadyBirdJohnsonWidlowerCenter
Red Chokeberry
Nine Bark
Serviceberry
Physocarpus opulifolius
Aronfaarbutifolia
Amelanchierarborea
Blooms May
Blooms Mayto July
BloomsMarchtoApril
Full sun to part shade
Part shade
Part shade Moistsoil
Wet to moist soils
Wet to moist soils
Small tree with early spring
Red berries;high value for
Wetwoods,sandyorrocky
flowers;deliciousedible
stream banks
wildlife
berriesinsummer
Photo: Robert Mohlenbrock,USDA
Photo:Stetan Bloodworth,
Phota:Stefan Bloodworth,
Lady Bird Johnson Wildflower Center
Lady Bird Johnson WildflowerCenter
Spice Bush
Silky Dogwood
Winterberry Holly
Linderabenzoin
Cornusamamum
Shrubs
lexverticillata
BloomsMarch to May
Blooms May to July
Blooms Mayto June
Full sun Wetto moist soils
Light shade to shade
Part shade Wettomoist soils
Flowers in summer blue
Wet to moistsoils
Showyberries in winter,high
Bright red berrles in fall;
berries; multi-stemmed;
wildlifevalue;good colonizing
very high wildlife value
herbal uses; wildlife value
shrubsforstreambanks
Photo:Sally&AndyWasowski,
Phote George Bruso,
Lady Bird Johnson wlldilower Ceniter
Lady Blrd Johnson Wildfilower Center
American Beech
American Sycamore
Bladk Gum
Fagus grandifolia
Platanus occidentalis
Myssa syhvatica
Blooms April
Blooms Aprll to May
Blooms April to May
Full sun
Full sun to full shade
Full sun to part shade
Moist,but well-drained soils
Wet to moist soils
Moist soils
Largetreewith handsome
Largetree withshowymottled
Tall tree with outstandingfall
gray bark; high wildlife value
barkriverbanks,floodplains
color;high wildlfe value
Foliage photx Bill Cook,
and alluvial soifs
Photo:KeithKanoti,
Michigan State University
Maine Forest Service
Pagoda Dogwood
Green Ash
Rad Maple
Cornus aiternifolia
Fraxinus pennsylvanica
Acerrubnum
Blooms April to May
Blooms Mayto June
BloomsMarchtoApril
Part shade
Part shade
Full suntofull shade
Moist soils
Wet to moist soils
Moistsols
Small tree for moist woods
Fastgrowth;good fall color.
Adaptstoarangeofmoisture
and shaded ravines; dark biue
Photu:RobertMohlenbrock,USDA
conditions:goodfallcolot
fruit
Photo:aill Cook
sanunairsfwpw
Shaghark Hickory
River Birch
Swamp White Oak
Betula Nigrd
Carya ovata
Cuerusbicolor
Blooms May
Blooms in May
Blooms inMay
Trees
Full sun to part shade
Full sun to part shade
Partshade
Wettomoistsoils
Moist soils
Wet to moist soils
Notable for its peeling bark:
Shaggy gray exfoliating bark
Large treewith veryhigh
foadplainsstreambanks,we
very high wildlife value
wlldifevaluegood
woods,swamps
Photo:Keith Kanoti,MaineForest
wetiand oak
Phot:Steven Katovich,USDAForestSvc
Service
phcMukBrandUniv.dlCt

Only
Remove ffuids from
Train all relevant
incoming vehicles
emptoyees in
Drain fluids from
your BMPs
incoming vehicles to
Employee training
reduce the possibility
is critical!
of spills when parts
Train employees
are removed later,
on stormwater
and time and cost to
management procedures:
your business from
especially during the
cleaning up leaks
Handle drained ffuids
Routine housekeeping
wet season and before
and spilis.
properly
it rains or snows.
is important
Drain vehicle ffuids
All employees must be
Store ffuids properly
before dismantling
Clean up spilis promptiy and
trained upon their
to reduce the amount of
ftuid-containing parts,
thoroughiy. Use shop rags
initial hire and at least
contaminants that end up
Drain, cover and
placing vehicies in
and oil dry to clean up
once per yea?
in stormwater. Confine
contain alt oily parts
the yard for long-term
smaller spills, and keep
thereafter.
fluid storage to designated
Store engines, transmissions.
storage, or crushing.
spilt kits available in the
areas that are covered
and other oily parts to avoid
areas where you conduct
and have adequate
exposure to rain or snowfall.
dismantling, fluid removal,
secondary containment.
Store these parts indoors
and fluid storage. Sweep
Keep all storage
or under a roof on an
paved surfaces and ciean
containers away from
impervious surface, if you
absorbent material daily
storm drains, and don't
store oily parts outside,
to reduce sediment and
teave open drain pans
use weather- and leak-proof
contaminant buildup.
around the shop.
covered containers, or place
them in vehicle bodies.

HOMEOWNER GUIDE
Septic Systems Care
and Maintenance
Source Water Protection Program
Reading Area Water Authority
Reading Area Water Authority
For more information
1801KutztownRoad
Reading,PA 19604
(610) 406-6300
breaks down the waste solids. Resuiting sludge can
recycle it. Never pour oil down the sink or in a storm
ammonia and other cleaners. Use a phosphate-free
substances can reduce the necessary bacteria that
DO limit the use of household chemicals. These
soda or borax for household hazardous wastes like
http://www.portal.state.pa.us/portal/server.pt?open=514&objl
DO substitute less toxic substances like baking
into the septic system. Both latex-based and oil-
http://www.elibrary.dep.state.pa.us/dsweb/Get/Document-
supplies, cigarette butts, and paper towels. A
This extra drainage can overload your system.
Do's and Don'ts
system. Examples include tissues, sanitary
On-lot System Operation and Maintenance
drain or sewer on the street.
For more information
Pennsylvania DEP Factsheet
77465/3800-FS-DEP1414.pdf
clog the drainfield.
laundry detergent.
D=554156&mode=2 
problems.
Comments
Septic System Maintenance Record
Caring for Your System
Remember that the Homeowner is responsible
: Pump the solids from the tank every three (3)
appear, such as sluggish toilets, sewer odors,
• Repair the system as soon as trouble signs
• Keep service and pumping records handy.
: Visit the PA Department of Environmental
for the care and maintenance of the septic
spongy ground around septic tank, or raw
Service
n=514&objID=554156&mode=2
ensure good working order.
000
system in top shape:
Company
sewage backups.
malfunctions.
Date

drinking water source. Refrain from using cleaners and other chemicals that may eventually
infitratorSystems,inc
 Protects the Environment! What goes into your septic system may end up in your
Photo courtesy of
 Protects Your tealth! Bacteria and viruses are found in the wastewater, and a
• SaVes Money! Repairing or replacing a septic system can be very expensive.
Eifluentabsorption
functional septic system removes most of the organisms during treatment.
be discharged from your system and soak into the ground.
Why Should I Maintain My Septic System?
Example of Typical Septic System
aempunol2
Plumbing ven!
correctly.
kitchen use, laundry, and other activities. It
substances. If not treated properly, these
Households that are not on a public sewer
homes, including toilet use, bathroom and
substances can travel through soil and
from plastic, fiberglass, or concrete. Tank
(known as effluent) is forced into the
system to
Household
 Septic Tank - Tanks can be constructed
• Soil -- the soil encompassing the trenches
wastewater contains all the wastes from our
: Drainfield - a drainfield is constructed from
filled trenches in the soil. When wastewater
detergents,
 other
a series of perforated pipes buried in gravel-
enters the septic tank, an equal amount
The effluent eventually is
Enqineering and Environmental Services
SSM GROUP.INC.
SSM
ssmgroup.com
What is a Septic System?
many
potentially contaminate local waterways.
Most systems have three components:
oils, and r
dispose of their wastewater.
and approved by local agencies.
waste,
incorporated into groundwater.
drainfield for treatment.
human
chemicals, grease,
RAWA
pollutants.
contains

Maidencreek Newsletter

None this reporting period

2.0
MCM #2 - Public Involvement / Participation Program
2.1
Description
MCM #2 requires the MS4 municipality to implement the following BMPs:
2.1.1
Develop, implement and maintain a written Public Involvement and
Participation Program (PIPP).
2.1.2
Provide adequate public notice and opportunities for public review, input, and
feedback prior to adoption of any ordinance, SOP or plan required by the
General Permit.
2.1.3
Regularly solicit public involvement and participation from the target
audience groups using available distribution and outreach methods.
2.2
BMP #1 - Develop, Implement and Maintain the PIPP
Maidencreek Township will update and maintain this PiPP annually at a minimum.
2.3
BMP #2 - Meetings, Public Notice and Advertisement
Maidencreek Township will utilize both the local newspaper (Reading Eagle) and social media
(Facebook) to advertise public meetings that concern stormwater. The regular July meeting
of the Township Supervisors will be established beginning in 2022 as the meeting for
stormwater related issues to be discussed.
Council meets the second Thursday of each month at 7:oo p.m., in the Township Building at
1 Quarry Road.
Meeting minutes are kept and will document stormwater-related topics and discussions.
Township Council discusses stormwater catch basin cleaning at every meeting.
Any special meetings of Township Council to discuss stormwater will be advertised via
Facebook.
Maidencreek Township adopted its Stormwater Management Ordinance, Ordinance Number
214, on June 12, 2008. Any updates will be properly advertised.
2.4
BMP #3 - Public Involvement and Participation
Maidencreek Township has stormwater-related flyers and related information available on
display. Attendees are made aware of the Township's Facebook page and website.

Additional public involvement and solicitations for participation will be made during the
August "stormwater meeting" of Township Supervisors.

APPENDIX D
MCM #2 - PUBLIC INVOLVEMENT/PARTICIPATION
BMP #3 - PUBLIC INVOLVEMENT/PARTICIPATION PLAN
(MS4 STEERING COMMITTEE)

Berks County Municipal Separate Storm Sewer System Steering Committee
Public Involvement and Participation Program
Background
Portions of municipalities throughout Berks County are located within the United States Bureau of the Census'
Storm Sewer System (MS4) permit as outlined by Pennsylvania Department of Environmental Protection's (PA
DEP) National Pollutant Discharge Elimination System (NPDES) Program. The MS4 permit includes the
Public Involvement and Participation Program (PPP), which is detailed below and in the attached table entitled
General Public Involvement and Participation Program Plan.
Steering Committee are implementing the public education, outreach, and involvement requirements of the Permit
through a cooperative effort. (See attached list for municipalities) Each Ms4 Permit Holder, who is located within
Education Program. The Berks County Planning Commission, Berks County Conservation District and Berks
Nature (formally the Berks Conservancy) (in this document, referred to as the Education Program Partners)
implement the Berks County Cooperative Education Program on behalf of and in cooperation with the
items that are described in this PIPP document. The PIPP was developed by the Berks County MS4 Steering
Committee and follows the PA DEP Protocol for the education/outreach portions of the Minimum Control
Measures (MCM)#2.
Goals and Intended Use of this Plan & Matrix
By the implementation of this PlPP, the Berks County MS4 Steering Committee will provide the opportunity for the
involvement with Ms4 operations, ordinances, and help prevent and/or reduce the discharge of pollutants
contained in the stormwater runoff. The Goal of this PiPP document is intended to meet the measurable goals of
MCM2, BMP 1. This narrative and matrix PIPP is to be reviewed, amended, and adopted by each participating
member municipality that is a member of the Berks County Ms4 Steering Committee on an annual basis. Any
review, amendments, and/or changes to the narrative and/or matrix should be done so at a public meeting
to allow for appropriate public comment.
Strategies to Achieve Measurable Goals
The PIPP program for Berks County MS4 Steering Committee Members initially followed the worksheets provided
(residents, schools, businesses, developers, municipal employees), identifications of local organizations that the
target audiences interact with, and strategies/opportunities to partner with those organizations on public
involvement. Developing the initial program consisted of filling in the work sheet, determining the audiences, and
brainstorming which community groups would be most interested in joint efforts. The below list and the included
matrix details the plan and actions that the Berks County MS4 Committee will take to fulfll MCM #2
> Public Participation in the Decision-Making Processes
When decisions are needed at a local municipal level in regards the development,
implementation, and update of programs and activities related to the municipal Ms4 Permit, then
the public will be given the opportunity to participate at various public meetings. The public will be
notified of these public meetings by means of traditional notice in the newspaper and on the
municipality's website.
This PIPP will be publicly reviewed annually in order to keep it up to date and effective. The PIPP
will be posted on the Berks County MS4 Steering Committee Webpage. Each participating
municipality in the MS4 Steering Committee will have a link to this PIPP on their respective
websites.
Methods of Routine Communication with Target Audiences
The Berks County MS4 Steering Committee has identified that the target audiences primarily
interact with the Berks County Planning Commission, the Berks County Conservation District and
Berks Nature. Other groups that target audiences interact with include:
Residents: Watershed Associations, Trout Unlimited, Land Conservancies
Approved by the Berks County MS4 Steering Committee January 15, 2015
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016

Berks County Municipal Separate Storm Sewer System Steering Committee
Public Involvement and Participation Program
Business/Developers: Chamber of Commerce, Economic Development Agencies
Schools: Berks County Intermediate Unit
Municipal Employees: Berks County Public Works Association, Albright College's Center
for Excellence in Local Government, PA State Association of Township Supervisors
As with the Public Education and Outreach Plan, the Education Program Partners submit a
quarterly update to each participating municipality on the public involvement opportunities that the
Education Program Partners have offered in the corresponding quarter. The municipalities are to
file this information for their records and progress reports, as well as include any other public
involvement efforts in which they participated.
The Berks County MS4 Steering Committee Education Program Partners responsibilities are
outlined below in regards to Routine Communication. Municipalities and Education Program
Partners will communicate with target audiences directly (i.e., a stream clean up) or they may
partner with another group for the public involvement effort (i.e., a presentation at the Berks
County Public Works Association meeting)
General Public
Schools (All educational partners)
Residents/Homeowners (Lead: Berks Nature, all educational partners)
Agricultural Community (Lead: Berks County Conservation District, all educational
partners)
Businesses
Developers/Engineers (Lead: Berks County Conservation District, all educational
partners)
MunicipalEmployees
Public Works(Lead: Berks County Planning Commission, all educational partners)
Solicitors (Lead: Berks County Planning Commission, all educational partners)
The enclosed Matrix details specific activities that will be accomplished on a yearly basis to satisfy MCM #2 BMPs
#1-3. This matrix as well as the above narrative are to be updated yearly.
Approved by the Berks County MS4 Steering Committee January 15, 2015
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016

Annually review current
encourage involvement
Review effectiveness of
Municipal Employees
determine content and
opportunities exist for
meetings and activities
practices and re-vise
ordinance adoption
Review advertising
public meeting to
Document all PiPP
requirements with
municipalities for
Determine if other
format for future
PIPP practices
effectiveness of
where needed
Determine
process
activities
Advertise any proposed
Annually review current
discuss the Stormwater
Encourage feedback for
Management Plan and
Work with educational
facilities to encourage
reporting of suspected
water topics at various
document comments
meeting each year to
Conduct one public
input and feedback
Conduct education
Encourage review,
Ordinance in local
Document all PIPP
MS4 Stormwater
illicit discharges.
PIPP practices
newspaper and
to solicit public
future meetings.
Schools
Management.
and response.
activities.
schools 
ndu!
General Public Involvement and Participation Program
Conduct one public meeting
reporting of suspected illicit
Management Ordinance in
Conduct one public meeting
Public Involvement and Participation Program
document comments and
Stormwater Management
each year to discuss the
community to encourage
Plan and to solicit public.
each year to discuss the
Encourage review, input
Stormwater Management
Advertise any proposed
Work with development
Annually review current
Encourage feedback for
local newspaper and
Developers
MCM #2-Public Involvement / Participation
Document all PiPP
MS4 Stormwater
PIPP practices
future meetings
and feedback
response.
discharges
activities.
input
Plan
Reviewed, updated, and approved by Berks County MS4 Steering Committee, April 28, 2016
Management Ordinance in
community to encourage
suspected ilicit discharges
Annually, review current
document comments and
Management Plan and to
Encourage review, input
solicit public reporting of
Advertise any proposed
discuss the Stormwater
discuss the Stormwater
Encourage feedback for
local newspaper and
meeting each year to
Work with business
meeting each year to
Conduct one public
Conduct one public
Businesses
Management Plan
MS4 Stormwater
Document all PIPP
PIPP practices
future meetings
and feedback
response.
Approved by the Berks County MS4 Steering Committee January 15, 2015
activities.
input
Management Ordinance
Annually review current
Advertise any proposed
to solicit public reporting
in local newspaper and
discuss the Stormwater
Encourage feedback for
Management Plan and
document comments
meeting each year to
Update practices to
involvement where
Conduct one public
MS4 Stormwater
of suspected illicit
Document all PIPP
Encourage public
Residents
review, input and
PIPP practices
future meetings
expand public
and response.
discharges
possible
feedback
activities.
opportunities for review input and
Involvement and Participation
ordinances with regard to the
Solicit public involvement and
participation from the target
maintain a written Public
Develop, implement and
Prior to any adoption of.
Permit provide notice &
Program (PIPP)
audience groups
BMP #2
feedback
BMP #1
BMP #3

Municipal Operatlons)
Municipal Empl.
MCM 6 (Pollution
Preventlan & Good
housekeeping for
Schools
Developers
Businesses
Resdents
Municipal Empl.
MCM 5 (Post
Construction
 Stormwater
Mangement)
Schools
Developers
Businesses
Residents
MCM 4 (Construction
SIte Stormwater Runoff
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Munlcipal Empl.
MCM 1(Public
Schools
Developers
Businesses
Residents
School District, Municipalites, Countywide
Targeted Audlence
Completely funded by other program
Program Name, Date and Descriptlon

Municipal Emp.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Buslnesses
Residents
Municipal Empl.
MCM 5 (Post
Construction
 Stormwater
 Mangement)
Schools
Developers
Businesses
Residents
MCM4(Construction
Site Stormwater Runoff
Municipal Empl.
5chools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Municipal Empi.
MCM 2 (Public
Involvement &
Participation)
Schaols
Developers
Businesses
Residents
Education & Outreach]
Municipal Empl.
MCM 1 (Public
Schools
Developers
Businesses
Residents
School Districts - Antietam, Brandywine Heights, Conrad
Weiser, Daniel Boone, Exeter, Fleetwood, Govenor
Mifflin, Kutztown, Muhlenberg, Oley Valley, Reading,
School District, Municipalities, Countywide
Perkiomen, Wilson, and Wyomissing.
Targeted Audlence
Spring Township
City of Reading
Community Garden. Provide education on soil health and
2021-2022 School Year - Berks County Trout-In-The-
* funded partially by BCM54 Educatlon Program
Completely funded by other program
Program Name, Date and Descrlption
Classroom.
composting.
Residents.

Municlpal Operations)
Municlpal Empl.
Prevention & Good
MCM 6 (Pollutlon
housekeeping for
Schools
Developers
Businesses
Residents
Construction Stormwater
Municlpal Empl.
MCM 5 (Post
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
Municipal Empl.
Schools
Control)
Developers
Businesses
Resldents
Municipal Empt.
MCM3 (IDD&E)
ING Berks Nature
Schools
Developers
Businesses
Residents
Municipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
2021 MS4 3rd QUARTER PROGRAMMIN
Businesses
Residents
Educatilan & Outreach)
Municipal Empl.
MCM1 (Public
Schools
Developers
Buslnesses
Resldents
School District, Municipalities, Countywlde
Countywide about 250 people and riders
 Targeted Audlence
County Wide 200 kids
Completely funded by other program
Program Name, Date and Descrlption
A9/25/2021 Ride for the River

Municipal Operations)
Municipal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Munlcipal Empl.
MCM 5 (Post
Construction
Stormwater
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM 4 (Constructlon
Municipal Empl.
.Schools
Control)
JING Berks County Planning Commission
Developers
Businesses
Residents
Municlpal Emp.
MCM 3 (IDD&E)
Schools
Developers
Buslnesses
Resldents
Municipal Empl.
MCM 2 (Public
Invoivement &
Particlpation)
Schools
Developers
Businesses
Resldents
Education & Outreach)
Municipal Empl.
MCM1 (Public
Schools
Devetopers
Businesses
2021 MS4 4th QUARTER PROGRAMI
Residents
School Distrlct, Municipalities, Countywide
Targeted Audlence
Countywide
* funded partially by BCMS4 Educatlon Program
Program Name, Date and Description
Completely funded by other program

Municipal Operations)
Municipal Empt.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schoois
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCM5 (Post 
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM 4 (Construction
Municipal Empt.
Schools
Control)
Developers
Businesses
Residents
Munlcipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Buslnesses
Resldents
Municipal Empl.
MCM 2 (Public
Involvement &
Participatlon)
Schools
Developers
Businesses
Residents
Educatlon & Outreach)
Municipal Empl.
MCM 1 (Public
Schools
Developers
Buslnesses
Residents
School Distrlct, Municipalities, Countywlde
Targeted Audience
Berks County
Berks County
Completely funded by other program
Program Name, Date and Description

Municipal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCM5 (Post
Mangement)
Schools
Developers
Businesses
Residents
Site Stormwater Runoff
MCM4(Construction
Municipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM3 (IDD&E)
 Berks Nature
Schaols
Developers
Businesses
Residents
Municipal Empl.
MCM,2 (Public
Involvement &
Participation)
2021 MS4 4th QUARTER PROGRAMMING
Schools
Developers
Businesses
Residents
Educatlon&Outreach)
Municipal Empl.
MCM1(Public
Schools
Developers
Businesses
Residents
Advertised County wide done in Tully watershed 35
School District, Municlpaltles, Countywlde
Targeted Audience
Countywide
people
Cumru
* funded partially by BCMS4 Educatlon Program
Completely funded by other program
Program Name, Date and Descriptlon
 10/9/2021 Cumru Fall fest tabling

Municipal Empl.
MCM 6 (Pollutlon
Prevention & Good
housekeeping for
Schools
Developers
Businesses
Residents
Municlpal Empl.
MCM 5 (Post
Construction
Mangement)
Stormwater
Schools
Developers
Businesses
Residents
MCM 4 (Constructon 
site Stormwater Runoff
Municlpal Empl.
Schools
HING Berks County Planning Commission
Developers
Businesses
Resldents
Municlpal Empl.
MCM3 (1DD&E)
Schools
Developers
Businesses
Residents
Munlcipal Empl.
MCM 2 (Public
Involvement &
Participation)
Schools
Developers
Businesses
Resldents
Education&Outreach)
Municlpal Empl.
MCM1 (Public
Schools
Developers
2022 MS4 1st QUARTER PROGRAMN
Businesses
Residents
School District, Municipalitles, Countywide
Targeted Audience
Countywide
Completely funded by other program
ProgramName, Date and Description
MS4 and Your Municipality

Municlpal Operations)
Municipal Empl.
MCM 6 (Pollution
Preventlon&Good
housekeeping for
Schools
Developers
Businesses
Residents
Munldipal Empl.
MCM 5 (Post
Constructlon
Schools
Developers
Businesses
Residents
MCM 4 (Construction
Site Stormwater Runoff
Municipal Empl.
Control)
Schools
 Berks County Conservation District
Developers
Businesses
Resldents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Residents
Munlcipal Empl.
Involvement&
Participation)
Schools
Developers
Businesses
Residents
Education & Outreach)
Municipal Empl.
2022 MS4 1st QUARTER PROGRAMMINGI
MCM 1 (Public
Schools
Developers
Businesses
Residents
Govenor Mifflin, Kutzown, Muhlenberg, Oey Valley,
School Districts - Antietam, Brandywine Helghts,
Conrad Weiser, Daniel Boone, Exeter, Fleetwood,
School DIistrict, Munlcipallties, Countywide
Upper Perkiomen, Wilson, and Wyomissing.
Wyomissing Borogh/School District
Tulpehocken Watershed
Targeted Audlence
Washington Township
Public
March 26,2022-Barreis and Beer Rainbarrel Workshop
2021-2022 School Year - Berks County Trout-In-The-
Association Presentation -Updated Assoc.on water
March 14, 2022 -West Branch Perkiomen Live Stake
* funded partially by BCMS4 Education Program
Program Name, Date and Description
Completely funded by other prograrm
March 3rd, 2022 - Tulpehocken Creek Watershed
quality projects.
Demonstration
Classroom.
Volunteers

MCM6
ME
MCM5
ME
MCM 4
ME
 Berks Nature
MCM3
PROGRAMMING I
MCM2
ME
MCM1
2022 MS4 1st QUARTER
00
DOE
OOE
# attendees
School Distrlct, Municlpallties, County wlde
Wernersvlle (but advertised county wide)
Targeted Audlence
Tulpehocken SD
County Wide
County Wide
Exeter SD
Exeter SD
*3/24/2022 Reiftann School in classs enviroscape.
* funded partlally by BCMS4 Education Program
* 3/25/2022 Reiftann Schoof in class enviroscape.
A Completely funded by other program
Program Name, Date and Descriptlon
 3/29/2022 Wernersille Library Invasive Vs
 3/30/2022 Tulpehocken SD field Trip (FT)
Place Enviroscape
native

Municipal Empl.
MCM 6 (Pollution
Prevention & Good
housekeeplng for
Schools
Developers
Businesses
Residents
Munlcipat Empl.
MCM S (Past
Constructlon
Stormwater
Mangement)
Schools
Developers
Businesses
Residents
MCM4 (Construction
Site Storimwater Runoff
Munlcipal Empl.
Schools
Control)
Developers
Businesses
Residents
Municipal Empl.
MCM 3 (IDD&E)
Schools
Developers
Businesses
Resldents
Municipal Empl.
MCM 2 (Publlc
Involvement &
Participation)
Schools
Developers
Businesses
Residents
Educatlon & Outreach)
Munlcipal Empl.
MCM1 (Public
Schools
Developers
Businesses
Residents
School District, Municipalites, Countywide
Targeted Audience
Countywide
* funded partially by BCMS4 Education Program
Program Name, Date and Description
Completely funded by other program
Coordinators : MS4, Source Water Protection land
Municipal Emergency Management

Municipal Operations)
Municipal Empl.
MCM 6 (Pollution
Preventlon & Good
housekeeplng for
Schools
Developers
Businesses
Residents
Construction Stormwater
Municipal Empl.
MCMS (Post
Mangement)
Schools
Developers
Businesses
Resldents
MCM4 [Canstruction
Site Stormwater Runoff
Municipal Empl.
Control)
Schools
District
Developers
Businesses
Resldents
S Berks County Conservation 
Muntdipal Empl.
Schools
Developers
Businesses
Resldents
Municlpal Empl.
MCM 2 [Public
Invalvement &
Partidpation)
Schools
Developers
Businesses
Residents
Educatlon & Qutreach)
Municipal Empl.
MCM 1 (Publlc
Schools
Developers
Businesses
Resldents
er, okn, Shykl lley, Kutwn
School District, Municlpalitles, Countywide
Govenor Mifflin, Oley, Muhlenberg, Hamburg
Wilson School District
Targeted Audience
Kutztown School District
Hereford Elementary
High School Students
5ch uylkill alley
Bern Township
Berks County
Berks County
City of Readinit
Sprlni Township
Berks County
Twin Valley.
Berks County
City of Reading
Countywide
May 11th, 2022 - Municipal Riparlan Buffer Maintenaince
an Ag Container Garden Workshop - Soil health workshop.
June 22, 2022 Don Hartman Conservation Leadership
June 23,2022-Spring Township Creek Exploraton 
Completely funded by other program
Program Name, Date and Descrlption
May 10-12,2022 Wilson Fleld and Stream Days
June 17, 2022 Library Program re: Macros and
May 26, 2022 - Reading High School Courtyard
April, 2022 Paint the Rain -Rainbarrel contest
Family watershed and water quality education
April 23, 2022 Conservation Celebration
April 4, 2022 Contractor Workshop
June 3,2022 Vegetated Swale Video
April 2, 2022 Seedling Sale
Celebratlon - Table Display
Release re:Rain Gardens
Enviroscape
Watersheds
education

ME
MCM 6
ME
MCM5
ME
MCM 4
 Berks Nature
MCM3
MCM2
ING
2022 MS4 2nd QUARTER PROGRAMMIR
ME
MCM 1
OOT
100
105
#attendees
School District, Municipalitles, County
Wernersville (but advertised county wide)
Targeted Audlence
Reading (Alvernia Students)
wide
Brandywine Heights FT
UpperPerkiomen SD
Muhlenburg SD
Muhlenburg SD
Tulpehocken SD
Gov Mifflen SD
GovMifflin SD
Gov Mifflin SD
Twin Valley SD
oley Valley SD
Wyomissing SD
GovMifflinSD
County Wide
CountyWide
County Wide
County Wide
County Wide
GovMiflinSD
County wide
County Wide
Reading SD
Reading SD
Reading SD
Reading SD
Reading SD
County Wide
Weiser SD
Reading SD
Reading SD
WeiserSD
Reading SD
WesierSD
WilsonSD
Reading SD
Reading
Reading
Completely funded by other program
A4/23/2022Girn Scouts and citizenscience water
Program Name,Date and Description
 4/25/2022 Alvernia Field Trip Water Quality
4/28/2022 Wernersville Library Owl Pellets
6/12/2022 Family Fishing at Stoneclffe Park
^ 4/16/2022Berks Nature Drop off Kids Day
* 5/24/2022 Southern Middle School FT
* 5/27/2022 Northeast Middle School FT
5/13/2022 Girl Scouts and Eco Friend
5/19/2022Southern Middle School FT
 5/20/20225outhern Middle School FT
^5/31/2022GovMifflin PreKCountsFT
6/1/2022Gov Miflin PreKCountsFT
*4/20/2022Gov MifflinTrauma Kids
^ 5/21/2022 Berks Drop Off Program
* 6/2/2022 Northeast Middle School FT
A 4/29/2022 Brandywine Heights FT
^ 4/29/2022 Story Hike and Smores
A5/10/2022 Robeson ElementaryFT
*5/26/2022MillmontEcoFunDay
5/28/2022Girl Scouts Eco Learner
5/12/2022 Reading Gifted FT
 5/27/2022 Wilson Teachers FT
* 4/22/2022 Weiser Field Trip
* 4/11/2022 Weiser Field Trip
*4/28/2022WeiserField Trip
 5/6/2022 Penn Bernville FT
5/7/2022GovMiffinRegatta
 4/5/2022 Muhlenberg FT
* 4/6/2022 Muhlenberg FT
^ 5/3/2022 Reach Cyber FT
+ 5/25/2022 Wyomissing FT
*4/1/2022GovMiffinFT
* 5/5/2022St Ignatlus FT
^ 6/24/2022 Kindercare FT
* 4/27/2022 La Salte FT
 5/4/2022 Hereford FT
A 6/21/2022 Olivets Ft
quaility

APPENDIX E
MCM #2 - PUBLIC INVOLVEMENT/PARTICIPATION
BMP #3 - PUBLIC MEETING NOTICES AND MINUTES

FAX: 610-926-6314
IONE: 610-926-4920
MAIDENCREEK TOWNSHIP
BOARD OF SUPERVISORS
www.maidencreek.net
2021 Annual MS4 Storm Water Presentation July 8, 2021
The Townships NPDES Permit was issued on April 1, 2019 and expires March 31, 2024.
The annual cost of the permit is $500 and is due to the PA DEP by April 1st.
A report is due annually on September 3oth.
There are 6 minimum control measures that must be met annually:
 MCM 1 Public Education and Outreach
Written plan listing the target audience.
Newsletter articles 3 times a year.
Information on the website.
Signs in the Willow Creek Open Space.
MCM 2 Public Involvement & Participation Pian
Written plan.
Annual meeting to discuss public education.
Ask for the public's help reporting illicit discharge.
MCM 3 Illicit Discharge Detection & Elimination
Written program
Screen outfalls over the course of 5 years (9 in 2021)
Map the storm water shed and storm sewer system
Enact the DEP's 2022 Model Storm Water Ordinance
Provide education to employees, public and elected officials.
MCM 4 Construction Site Storm Water Runoff
The Berks County Conservation District does the heavy lifting on this.
MCM 5 Post Construction Storm Water Management
Inventory of BMPs
Storm water basin inspections (9 inspections and letters by SDE)
MCM 6 Pollution Prevention/Good Housekeeping
Written policies on municipal operations in order to reduce the discharge of pollutants to waterways
Employee training.

1MediaNews Group
LPENNSYLVANIAGROUP
Date of proof: 06/29/21
Ad sample
Account:
1335499
MAIDENCREEK TOWNSHIP
MEETING NOTICE
Name:
MAIDENCREEKTWPSUPERVISORS
Company:
MUNICIPALSEPARATE STORM
SEWER SYSTEM
Address:
TOWNSHIP SECRETARY
(MS4 PROGRAM)
PO BOX 319
BLANDON, PA 19510
Maidencreek Township will
hold a public meeting to dis-
Telephone:
(610) 926-4920
cuss their Municipal Separate
2191781
Ad ID:
StormSewerSystem(Ms4)
program, on,Thursday, July
Description:
MAIDENCREEK TOWNSHIP MEETING NOTICE
8, 2021.in the Maidencreek
Township ,Municipal Build-
ing located at 1 Quarry Road,
Blandon. .. The. regular busi-
Class:
1201
ness.meeting of theTownship
CRPKERR
Orig User:
will begin at 7 p.m. and the
90
public is welcome to attend.
Words:
CDC guidelines in effect at the
Lines:
26
date and time of the meeting
Agate Lines:
forCovid-19will befollowed.
Column width:
Diane Hollenbach,manager
Depth:
2.889
Maidencreek Township
Blind Box:
RE July 1 A-1
Totat:
$79.02
07/01/21
Run Dates:
Publication
07/01/21
Reading Eagle, Reading Eagle
Digital
We Appreciate Your Business!
Thank You !

3.0
Illicit Discharge Detection and Elimination Program
3.1
Description
MCM #3 requires the MS4 municipality to:
3.1.1
Develop and implement a written program for the detection, elimination, and
prevention of illicit discharges into the regulated Ms4.
3.1.2
Develop and maintain a map of the regulated small Ms4's outfalls and surface
waters.
3.1.3
In conjunction with the map(s) created above (either on the same map or on a
different map), permittees shall show and update the entire storm sewer
collection system, including roads, inlets, piping, swales, catch basins,
channels, basins, and any other features of the permittee's storm sewer
system including municipal boundaries and/or watershed boundaries.
3.1.4
The permittee shall conduct outfall field screenings, identify the source of any
illicit discharges, and remove or correct any illicit discharges.
3.1.5
Enact a Stormwater Management Ordinance to implement and enforce a
stormwater management program that includes prohibition of non-
stormwater discharges to the regulated small MS4.
3.1.6
Provide educational outreach to public employees, business owners and
employees, property owners, the general public and elected officials (i.e.,
target audiences) about the program to detect and eliminate illicit discharges.
3.2
llicit Discharges
3.2.1
pursuant to a NPDES permit and discharges resulting from firefighting
activities".
3.2.2
The municipal Act 167 and/or MS4 ordinance contains a list of authorized
discharges; and provides penalties for violators.
3.2.3
Illicit discharges are critical because they make their way to waterways
untreated. Discharges such as paint or oil dumped into storm drains, septic
effluent, car wash wastewater and illegally connected wastewater piping can
cause serious pollution issues. Pollutants include heavy metals, bacteria,
viruses, nutrients, oil and grease, solvents and toxins.

3.3
IDD&E Program
There are six (6) Best Management Practices (BMPs) required under MCM #3. BMP #1 is a
written program for the detection, elimination, and prevention of illicit discharges into the
regulated Ms4. The following items comprise the written program for the municipality.
3.3.1
MS4 System Map - The map is included in Appendix F, and depicts the
following:
The extents of the regulated MS4 within the municipality
The locations of alf outfalls, numbered
Streams, named and unnamed
Other surface waters
Catch basins, swales and channels that receive stormwater discharges
Roads, municipal boundaries and watershed boundaries
This map has been supplied to municipal employees and the local fire and
EMS responders.
3.3.2
Identify Priority Areas for Outfall Screenings - Priority areas consist of so-
called "hot spots", which are areas having the potential to generate
pollutants.
Any outfalls near construction sites or logged resident complaints will be
added to the priority list.
3.3.3
Procedures for Screening Outfalls -- All outfalls will be screened at least once
during each five-year permit cycle, by Township staff. Outfall screenings are
generally conducted in February or March each year, when there has been no
measurable precipitation within the 72 hours prior to the screening. Efforts
are also made to avoid screenings during periods of snowmelt. Screenings are
recorded on field sheets, a sample of which is included in Appendix G.
Any outfall that is discovered to have continuous dry weather flow or a history
of problems must be screened annually.
3.3.4
Outfall Accessibility- To date, there have been no issues with inaccessibility
of outfalls due to private property restrictions. If access to an outfall or a
suspected illicit discharge source, is denied by a private property owner, the
following course of action will be followed:
Outfall inspector to contact the Township Street Supervisor and try to gain
voluntary access.

Street Supervisor to contact police if access remains prohibited.
A search warrant shall be obtained if needed to complete the investigation
into the discharge. District magistrate to be contacted.
DEP is to be contacted at 866-825-0208 if illicit discharges constitute an
immediate threat to the population, as well as 9-1-1, regardless of
whether access is denied.
3.3.5
Procedures for Identifying an Illicit Discharge - Historically, the outfalls in
Maidencreek Township's Ms4 have been dry during screenings, or carry a
perennial stream and intermittent underground spring flow. Therefore, to
date, no illicit discharges have been identified.
If a questionable discharge is encountered, either during routine screenings or
in response to a complaint or investigation, the following procedure shall be
followed:
3.3.5.1 Visual or odor characteristics shall be recorded. Observations shall
be made, either in the field or via the system map of possible sources
of the discharge, based on its characteristics (for example, milky
discharge downstream of a dairy).
Laboratory sampling is required when odor or appearance indicate
that the outfall is polluted.
3.3.5.2 When laboratory testing is necessary, the Township engineering staff
will consult with Township staff as to what parameters to test for.
Common sampling parameters include pH (where extreme values can
indicate commercial or industrial sources), conductivity (dissolved
salts and inorganics like alkalis, chlorides and sulfides), optical
brighteners (which can identify presence of detergents) and bacteria
(which can indicate presence of sanitary wastewater).
3.3.6
Procedures for Identifying the Source of an Illicit Discharge - Once the type of
pollutant(s) in the discharge has been identified, its source may be clearly
evident, or an in-depth investigation may be necessary. Using the above
example, a milky discharge downstream of a dairy may indicate the source
without further investigation. However, many times, illicit discharges result
from unseen pipe interconnections, sporadic illegal dumping, or other
clandestine activities.
Following is a partial list of investigative tools; which or how many to use will
be determined on a case-by-case basis:
10

Map or historical document review by Township staff or engineering
consultant
Pipe video using in-house equipment by Township staff
Smoke or dye tests ("Mr. Rehab" or similar service)
Public interviews/word of mouth; interview nearby residents, by Township
staff.
Surveillance by Township staff, police and/or engineering staff.
3.3.7
Procedures for Eliminating an llicit Discharge - Once the source of the illicit
discharge is identified, measures must be taken to stop the source. Through
this IDD&E Plan, the municipality will respond to the discovery of an illegal
connection in a graduated manner. Often, home or business owners are not
aware of the existence of illegal connections between their buildings and the
storm sewer system. The initial step will involve providing the responsible
party with information about the connection, its environmental
corrected in an effort to secure voluntary compliance. In the event that
voluntary compliance cannot be secured, the municipality will move to
enforcement provisions as outlined within the Act 167/MS4 Ordinance.
When the source of the illicit discharge is due to illegal dumping, elimination
of the source becomes more difficult. It is often difficult to identify and
locate the individuals responsible for illegal dumping. In these cases, the
procedure to eliminate the discharge focuses on prevention, supported by
enforcement to the extent possible.
Prevention can often be accomplished through education. Implementation of
MCMs #1 and #2 via their respective programs is intended to educate the
public on the consequences of illegal dumping. The ordinance developed as
part of MCM #3 provides the legal basis for penalties, should they become
necessary.
3.3.8
Complaints - The Township has in place a system for logging complaints.
Any stormwater-related complaints are referred to the Township's
engineering staff for response and may be in conjunction with the Streets
Supervisor. Complaints must be made in-person at Township Building
Records of all complaints are maintained at Township Building; any
stormwater-related complaints are made part of this SWMP.
3.3.9
Records Retention - All MS4 records are retained by the Maidencreek
Township Manager at Township Building, with duplicates stored in the
Township Engineer's office. Record retention and disposal is subject to
Pennsylvania's Municipal Records Act, and rules promulgated thereunder.
11

3.4
Ordinance Adoption
Maidencreek Township adopted its Stormwater Management Ordinance, which includes
documentation on illicit discharges and penalties, as Ordinance Number 214, on June 12,
2008. Any updates will be properly advertised.
3.5
Reaching Target Audiences about IDD&E
The Township will primarily use Facebook to disseminate information about IDD&E, including
what illicit discharges are, how to report them, and how to file complaints.
3.6
Evaluation of the IDD&E Program
The IDD&E plan will be evaluated annually throughout the permit term. New outfalls will be
mapped as discovered, and will be screened with the others during the routine inspection
period. The map will be updated as changes occur. Investigations, enforcement and other
actions will be documented and reported.
12

COMPLAINTFORM
Brief Description of Problem:-
Complainant's Name:
Address:
Phone Number:
FOR OFFICE USE ONLY:
Date Received:
Time:
Complaint Received By:
Complaint Referred To:
Street Department
Zoning Department
Police Department
Water/Sewer Authority
Board of Supervisors
Other
Action Taken:
Contact Made By:

APPENDIX F
MCM #3 - ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDD&E)
BMP #2 & #3 - MS4 & OUTFALL MAP

MS4 REQUIREMENTS TABLE
LEGEND
IMPAIRED DOWNSTREAM WATERS
MS4OUTFALL&ID囍
100-0
REQUIREMENTS
OTHER CAUSE(S) OF IMPAIRMENT
STORM SEWERSHED (OUTFALL)
OR APPLICABLE TMDL NAME
UHNAMCD TRILITARIES TO WILLOW CRCEK
APPCHDIX 鲁-PATHOOEWS (5)
NOHC USTEO
OP001
MS4OBSERVATIONPOINT& ID
SCHUYLKUL RIVER
MONE LISTED
STORM SEWERSHED (OBSERVATION POINT)
MADEH CREEK
LPPENOND-PATHOCARY(S)
OTHER HABITAT ALTERATIONS (4c)
LAKE ONTELAUNE TINDL
THDL PLAN-MUTRIENTS, SUSPCNDED SOLIDS (40)
OTHER BUABHTAT ALTEEATHONS (4c)
EXISTING STORMWATER COLLECTION SYSTEM
WLLOW CREEX
APMENOIX I-PATHOGENS($), APPCHDIK E-NRTHEMTS (S)
FLOW ALTERATIONS (4c)
MUNICIPAL BOUNDARY
EXISTING STORM PIPE AND FLOW DIRECTION
"READING"URBANIZED AREA
EXISTING CHANNEL
EXISTING STREAM (IMPAIRED-NUTRIENTS)
EXISTING STREAM (IMPAIRED-PATHOGENS)
TOWNSHIPROAD
STATE ROAD
URBANIZED AREA
11ACT 167 WATERSHED 8OUNDARY
MAIDENCREEK TOWNSHIP
Laka Ontiaunee
LANNCINAUHEEHED
Croek
0-00
O-021
025
Q-047
0-055
0-005
0007
0-003
OP-006
0-008
0.019
-01G
D018
020
0012
0-017
0-016
O13
OF-003
0-053
LLOW CREEK WATERSHED
036
0-041
0-01
0-040
rooplecarth
MS4 MAP
SYSTEMS DESIGN
SDE
ENGINEERING, INC
MAIDENCREEK TOWNSHIP
BERKS CO., PA.
UPDATED_04/01/19
SDE Projocl No.: 17:0019-0191
05/25/2017

APPENDIX G
MCM #3 - ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDD&E)
BMP #4 - OUTFALL FIELD SCREENING

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-008
Today's date: 8/22/2022
Time (Military): 0630
Investigators: Brian Wise
Form completed by: Brian Wise
Temperature (°F): 71
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde:40.44864N
Longitude: 075.89213W
GPS Unit: Magellan
GPSLMK #: 220/224Faith Drive
Camera: Brian Wise Cellular Device
Photo#s:#1&#2
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): 2 out of 3 pipes drain from Faith Drive inlet
Shed on top of pipe
Section 2: Outfall Description
LOCATION
SHAPE
MATERIAL
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
PVC
 HDPE
 Eliptical
 Double
(2) 22"
 Partially
 Fully
 Closed Pipe
 Steel
Box
 Triple
(1)
24"
With Sediment:
 Other:
Other:
Other:
 No
Partially
Fully
 Concrete
Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 9"
 rip-rap
other: .
Bottom Width: 3'
 Other:
 In-Stream
(applicable when collecting samples)
Yes
Flow Present?
μ No
If No, Skip to Section 5
Flow Description
 Trickle
 Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
 Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 - Clearly visible in 
I 3 - Some; origin clear
sanitary materials)
(e.g., obvious oil
flow
 3- Opaque
distance
 outfall 
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
1 2- Some; indications
possible suds or oil
1 2 - Clearly visible in
J Obvious
 2 - Easily detected
of origin (e.g.,
 sample bottle
1 2 - Cloudy
sheen)
Suspect (one or more indicators with a severity of 3)
I 1 - Few/slight; origin
I 1 -- Slight cloudiness
I Caulk dam
I 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
1 -- Faint
not obvious
(If No, Skip to Section 6)
1OBM
Peeling Paint
 Oil Sheen
I Other:
I other:
J Other:
 type:
(If No, Skip to Section 5)
 DESCRIPTION
Floatables
 Yellow
JOther:
I Green
I Petroleum/gas
 Spalling, Cracking or Chipping
I Paint
I Excessive Algae
DESCRIPTION
See severity
Other:
 Gray
1 Inhibited
I Suds
 Colors
 Orange
I Flow Line
Pool
I No
No
I Rancid/sour
00
I Sewage (Toilet Paper, etc.)
Corrosion
No
I Orange
 Brown
lExcessive
I Other:
I Petroleum (oil sheen)
Brown
SIOPO
lOily
 Suds
Are physical indicators that are not related to flow present?
low
Yes
I Sewage
I Sulfide
I Clear
I Green
 CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
 Present
Section 7: Data Collection
 set?
Intermittent flow trap s
Abnormal Vegetation
Sample for the lab?
Pipe benthic growth
 Outfall Damage
Deposits/Stains
Poor pool quality
-Does Not Include
 INDICATOR
 INDICATOR
Turbidity
Floatables
Trash!!
Color
 Unlikely
JOPO

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-009
Today's date: 8/22/2022
Time (Military): 0645
Investigators: Brian Wise
Form completed by:
Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44911N
Longitude: 075.88934W
GPS Unit: Magellan
GPS LMK #: Leaning Pine
Camera: Brian Wise Cellular Device
Photo #s: #3
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
Ultra-Urban Residential
 Institutional
 Suburban Residential
Other: .
Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Across from 100 Colonial Court
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
Eliptical
 Double
20"
Partially
 Fully
 Closed Pipe
I Steel
Box
 Triple
With Sediment:
I Other:
Other:
 other: 
 No
 Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 1' 4"
 rip-rap
other: .
Bottom Width: 4' 4"
 Other:
In-Stream
(applicable when collecting samples)
Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
 Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow#1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 - Clearly visible in 
I 3 - Some; origin clear
 sanitary materials)
flow
1 3 - Opaque
distance
outfall 
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
I 2- Some; indications
1 2 - Clearly visible in
possible suds or oil
I Obvious
1 2 - Easily detected
of origin (e.g.,
 sample bottle
1 2 -- Cloudy
sheen)
 1- Few/slight; origin
I 1 - Slight cloudiness
 Caulk dam
I 1 - Faint colors in 
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
-Faint
not obvious
1-
(If No, Skip to Section 6)
1OBM
Peeling Paint
I Sheen
I Other:
I Other:
10 
J other:
If Yes, type:
00
(If No, Skip to Section 5)
 DESCRIPTION
I Floatables
 Yellow
JOther:
 Green
1 Petroleum/gas
Spalling, Cracking or Chipping
 Paint
I Excessive Algae
DESCRIPTION
See severity
I Other:
I Inhibited
Gray
I Suds
 Colors
 Flow Line
100
 No
No
f two or more indicators)
00
1 Rancid/sour
I Sewage (Toilet Paper, etc.)
No
1 Orange
I Brown
Excessive
I Other:
f Petroleum (oil sheen)
 Brown
Section 4: Physical Indicators for Flowing Outfalls Only
I Suds
Are physical indicators that are not related to flow present?
 Oily
MO
Yes
Yes
I Sewage
I Sulfide
I Clear
Green
CHECK if Present
Section 6: Overall Outfall Characterization
1 (presence of 
Are Any Physical Indicators Present in the flow?
CHECK if
 Present
Potential
Section 7: Data Collection
Intermittent flow trap set?
Abnormal Vegetation
Sample for the lab?
Pipe benthic growth
Outfall Damage
Deposits/Stains
 Poor pool quality
-Does Not Include
INDICATOR
INDICATOR
Turbidity
Floatables
Trash!!
Color
 Unlikely
JOPO

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-010
Today's date: 8/22/2022
Time (Military): 0700
Investigators: Brian Wise
Form completed by:Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44882N
Longitude: 075.89081W
GPS Unit: Magellan
GPS LMK #: 310 Colonial Court
Camera: Brian Wise Cellular Device
Photo #s: 4
Land Use in Drainage Area (Check all that apply):
 Industrial 
 Open Space
Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): From open grate across entire road
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
Eliptical
 Double
24" x 10"
Partially
 Fully
 Closed Pipe
 Steel
 Box
 Triple
With Sediment:
Other: .
 other: 
 No
 Partially
 Fully
 Concrete
 Trapezoid
Depth: 9'
 Earthen
 Open drainage
Parabolic
Top Width: 3'
 rip-rap
other: 
Bottom Width: 10"
 Other:
 In-Stream
(applicable when collecting samples)
Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FOR FLOWING OUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
■Flow#1
Time to fill
Sec
Flow depth
Tape measure
Flow width
Ft, In
Tape measure
Flow#2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
1 3 - Noticeable from a
I 3 - Some; origin clear
 3 - Clearly visible in 
sanitary materials)
Iflow
1 3 - Opaque
distance
outfall 
COMMENTS
J 2 - Some; indications
possible suds or oil
1 2 - Clearly visible in 
 2 - Easily detected
of origin (e.g.,
1 2 - Cloudy
sample bottle
sheen)
Suspect (one or more indicators with a severity of 3)
 1 -Few/slight; origin
I 1 - Slight cloudiness
 Caulk dam
J 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
-Faint
not obvious
11-
(If No, Skip to Section 6)
1OBM
Peeling Paint
1 Sheen
I Other:
I Other:
If Yes, type:
00
(If No, Skip to Section 5
DESCRIPTION
 Floatables 
 Yellow
Jother:
I Green
 Petroleum/gas
 Spalling, Cracking or Chipping
I Excessive Algae
I Paint
DESCRIPTION
 Yes  No
See severity
I Other:
I Inhibited
spns [
I Colors.
1Orange
I Flow Line
No
I Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
Brown
lExcessive
I Other:
I Petroleum (oil sheen)
SIOPO
I Brown
 Outfalls Only
I Oily
spns
Are physical indicators that are not related to flow present?
I Sewage
 Sulfide
 Clear
Green
CHECK if Present
Section 4: Physical Indicators for Flowing 
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
Remove debris from out flow - 2017
CHECK if
Present
Section 7: Data Collection
 set?
f yes, collected from:
Intermittent flow trap s
Abnormal Vegetation
lab?
Pipe benthic growth
Outfall Damage
Deposits/Stains
Poor pool quality
INDICATOR
-Does Not Include
Sample for the I
INDICATOR
Turbidity
Floatables
Color
 Unlikely
JOPO
Good 2022

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-011
Today's date: 8/22/2022
Time (Military): 0705
Investigators: Brian Wise
Form completed by:Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde:40.44806N
Longitude: 075.89212W
GPS Unit: Magellan
GPS LMK #: 401 Colonial Court
Camera: Brian Wise Cellular Device
Photo #s: 5
40yds off rd, by 2 sycamore trees, 10' out of creek
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Drains from Colonial Court
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
SUBMERGED
RCP
CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
PVC
 HDPE
 Eliptical
 Double
16"
Partially
Fully
 Closed Pipe
 Steel
Box
 Triple
With Sediment:
Other:
 Other:
 Other:
 No
Partially
Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 2' 2"
 rip-rap
Other:.
Bottom Width: 3" 8"
 Other:
 In-Stream
(applicable when collecting samples)
Yes
Flow Present?
μ No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELDDATAFORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow#1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Tape measure
■F1ow#2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 - Clearly visible in
I 3 - Some; origin clear
sanitary materials)
(e.g., obvious oil
MOU
1 3 - Opaquc
 distance
outfall 
COMMENTS
I 2 - Some; indications
possible suds or oil
1 2 - Clearly visible in 
I Obvious
I 2 - Easily detected
of origin (e.g.,
sample bottle
1 2 - Cloudy
sheen)
Suspect (one or more indicators with a severity of 3)
 1 - Few/slight; origin
I 1 - Slight cloudiness
J Caulk dam
I 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
- Faint
not obvious
1-
(If No, Skip to Section 6)
JOBM
Peeling Paint
1l Sheen
I other:
J Other:
If Yes, type:
(If No, Skip to Section 5)
DESCRIPTION
J Floatables
J Yellow
JOther:
 Green
I Petroleum/gas
 Spalling, Cracking or Chipping
 Paint
 Excessive Algae
DESCRIPTION
See severity
I Other:
 Inhibited
Gray
spns E
S1O[00
 Orange
 Flow Line
Pool
I No
No
 Potential (presence of two or more indicators)
 Rancid/sour
I Sewage (Toilet Paper, ctc.)
Corrosion
lOrange
Brown
Excessive
I Other:
I Petroleum (oil sheen)
SIOPO
 Brown
Section 4: Physical Indicators for Flowing Outfalls Only.
lOily
 spns
Are physical indicators that are not related to flow present?
MO
Yes
Yes
I Sewage
I Sulfide
Clear
 Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
Present
Section 7: Data Collection
Intermittent flow trap set?
f yes, collected from:
Sample for the lab?
Abnormal Vegetation
Pipe benthic growth
Outfall Damage
Deposits/Stains
Poor pool quality
-Does Not Include
INDICATOR
INDICATOR
Turbidity
Floatables
Color
 Unlikely
JOPO

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-012
Today's date: 8/22/2022
Time (Military): 0731
Investigators: Brian Wise
Form completed by:
Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44786N
Longitude: 075.89394W
GPS Unit: Magellan
GPS LMK #:across from 419 Col, Ct
Camera: Brian Wise Cellular Device
Photo #s: #6
from grate 15yds to right at patch of 3 big trees,
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Drains from drain at 419 Col. Ct. both sides of road
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
Eliptical
 Double
24"
Partially
 Fully
 Closed Pipe
 Steel
Box
 Triple
With Sediment:
other:
Other:
 other: 
 No
 Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 2'10"
 rip-rap
Other: 
Bottom Width: 5'
 Other:
 In-Stream
(applicable when collecting samples)
Flow Present?
Yes
μ No
If No, Skip to Section 5
Flow Description
 Trickle
 Moderate
Substantial
(If present)
Section 3: Quantitative Characterization
FIELDDATAFORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow#1
Time to fill
Sec
Flow depth
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
1 3 - Noticeable from a
1 3 - Clearly visible in
1 3 - Some; origin clear
 sanitary materials)
(e.g., obvious oil
I flow
1 3- Opaque
 distance
outfall 
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
1 2- Some; indications
1 2 - Clearly visible in 
possible suds or oil
 Obvious
1 2 - Easily detected
of origin (e.g.,
 sample bottle
 2- Cloudy
 sheen)
Suspect (one or more indicators with a severity of 3)
I 1 -Few/slight; origin
I 1 - Slight cloudiness
 Caulk dam
I 1 -- Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
I 1-Faint
not obvious
(If No, Skip to Section 6)
OBM
Peeling Paint
1 Sheen
Other:
I Other:
10
I Other:
If Yes, type:
(If No, Skip to Section 5)
 DESCRIPTION
 Floatables
 Yellow
JOther:
I Petroleum/gas
 Spalling, Cracking or Chipping
I Paint
I Excessive Algae
DESCRIPTION
Section 5: Physical Indicators for Both Flowing and Non-Flowing Outfalls
See severity
I Other:
 Inhibited
I Gray
I Suds
I Colors
1 Orange
 Flow Line
No
No
I Potential (presence of two or more indicators)
 Rancid/sour
00
I Sewage (Toilet Paper, etc.)
μ No
 Brown
J Excessive
I Other:
1 Orang
I Petroleum (oil sheen)
I Brown
Section 4: Physical Indicators for Flowing Outfalls Only
f Oily
spns
Are physical indicators that are not related to flow present?
low
Yes
Brush needs to be cleared for better access - 2022
I Sewage
I Sulfide
 Clear
I Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
 Present
 Section 7: Data Collection
f yes, collected from:
Intermittent flow trap 
Abnormal Vegetation
Sample for the lab?
Pipe benthic growth
 Outfall Damage
Deposits/Stains
 Poor pool quality
-Does Not Include
 INDICATOR
 INDICATOR
Turbidity
Floatables
Trash!!
JOPO
Color
 Unlikely

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-014
Today's date: 8/22/2022
Time (Military): 0750
Investigators: Brian Wise
Form completed by: Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44694N
Longitude: 075.89341W
GPS Unit: Magellan
GPS LMK #: 33-37 Spirit Court
Camera: Brian Wise Cellular Device
Photo #s: #7
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residentia!
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Drains from Spirit Court
Section 2: Outfall Description
LOCATION
SHAPE
MATERIAL
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
PVC
 HDPE
Eliptical
 Double
18"
 Partially
 Fully
 Closed Pipe
Steel
Box
 Triple
With Sediment:
 Other:
other:
- Other:
 No
Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 4°
Bottom Width: 5
 Other:
In-Stream
(applicable when collecting samples)
Yes
Flow Present?
μ No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELDDATAFORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
I 3 - Noticeable from a 
1 3 -Clearly visible in
1 3 - Some; origin clear
 sanitary materials)
(e.g., obvious oil
flow
1 3-Opaque
 distance
outfall
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
1 2 - Some; indications
 2 - Clearly visible in
 Obvious
 2 - Easily detected
of origin (e.g.,
 sample bottle
 2 - Cloudy
sheen)
Suspect (one or more indicators with a severity of 3)
I 1 - Few/slight; origin
I 1 - Slight cloudiness
J Caulk dam
I 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
I 1 - Faint
not obvious
(If No, Skip to Section 6)
JOBM
Peeling Paint
1 Sheen
I Other:
I Other:
If Yes, type:
00
If No, Skip to Section 
DESCRIPTION
I Floatables
Yellow
JOther:
 Green
 Petroleum/gas
Spalling, Cracking or Chipping
 Paint
DESCRIPTION
Section 5: Physical Indicators for Both Flowing and Non-Flowing Outfalls
 Yes  No
See severity
I Other:
Inhibited
I Suds
1 Orange
 Flow Line
100g
No
I Rancid/sour
I Sewage (Toilet Paper, etc.)
ON区
1 Orange
 Brown
Excessive
I Other:
I Petroleum (oil sheen)
SIOPO
Brown
Section 4: Physical Indicators for Flowing Outfalls Only
J ily
 Suds
Are physical indicators that are not related to flow present?
low
les
Yes
1 Sewage
Ifide
lear
Suli
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
Present
 Section 7: Data Collection
f yes, collected from:
Abnormal Vegetation
lab?
Pipe benthic growth
Outfall Damage
Deposits/Stains
INDICATOR
 Poor pool quality
-Does Not Include
Sample for the l
 INDICATOR
Turbidity
Floatables
Trash!!
 Unlikely
JOPO
Color

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-015
Today's date: 8/22/2022
Time (Military): 0755
Investigators: Brian Wise
Form completed by: Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.444731N
Longitude: 075.89240W
GPS Unit: Magellan
GPS LMK #: 41-45 Spirit Court
Camera: Brian Wise Cellular Device
Photo #s: #8
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Drains on Cornerstone & Spirit Intersection
Section 2: Outfall Description
LOCATION
SHAPE
MATERIAL
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
PVC
 HDPE
Eliptical
Double
36"
Partially
 Fully
 Closed Pipe
 Steel
Box
 Triple
With Sediment:
 other:
 other:
 Other:
 No
 Partially
 Fully
 Concrete
 Trapezoid
Depth: 18'
 Earthen
 Open drainage
 Parabolic
Top Width: 3'
 rip-rap
 Other: 
Bottom Width: 5'
 Other:
 In-Stream
(applicable when collecting samples)
 Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FOR FLOWING OUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
Tape measure
Flow width
Ft, In
Tape measure
■Flow#2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 -- Noticeable from a
1 3 - Clearly visible in 
1 3 - Some; origin clear
sanitary materials)
e.g., obvious oil
 outfall flow
1 3- Opaque
 distance
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
 2 - Some; indications 
possible suds or oil
 2 - Clearly visible in
 Obvious
1 2 - Easily detected
of origin (e.g.,
 sample bottle
 2 - Cloudy
sheen)
 Suspect (one or more indicators with a severity of 3)
J I - Few/slight; origin
I 1 - Slight cloudiness
 Caulk dam
1 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
1 - Faint
not obvious
(If No, Skip to Section 6)
OBM
Peeling Paint
Other:
J Other:
I Other:
If Yes, type:.
00
If No, Skip to Section 5)
DESCRIPTION
 Floatables
 Yellow
 Green
 Petroleum/gas
Spalling, Cracking or Chipping
I Paint
 Excessive Algae
 DESCRIPTION
J Yes μ No
See severity
I Other:
IGray
I Inhibited
spns [
I Colors
1 Orange
 Flow Line
Pool
INo
I Potential (presence of two or more indicators)
Re-shaped for MTA 5/17, good Shape - 2017; Good Shape - 2022
I Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
I No
1 Orange
I Brown
Excessive
I Other:
 Petroleum (oil sheen)
SIOPO
Brown
Section 4: Physical Indicators for Flowing Outfalls Only.
lOily
f Suds
Are physical indicators that are not related to flow present?
low
Yes
I Sewage
I Sulfide
I Clear
 Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
resent
 Section 7: Data Collection
Intermittent flow trap set?
If yes, collected from:
Abnormal Vegetation
Sample for the lab?
Pipe benthic growth
Outfall Damage
Deposits/Stains
 Poor pool quality
-Does Not Include
INDICATOR
 INDICATOR
Turbidity
Floatables
Trash!!
 Unlikely
JOPO
Color

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-016
Today's date: 8/22/2022
Time (Military): 0800
Investigators: Brian Wise
Form completed by:Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde:40.44728N
Longitude:075.89234W
GPS Unit: Magellan
GPS LMK #: 57-61 Spirit Court
Camera: Brian Wise Cellular Device
Photo #s: #9
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Street drains on Spirit Court
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
Eliptical
Double
16"
Partially
 Fully
 Closed Pipe
 Steel
Box
Triple
With Sediment:
 other:
 Other:
other: 
 No
Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 2°
 rip-rap
 Other:
Bottom Width: 3'
 other:
In-Stream
(applicable when collecting samples)
Flow Present?
Yes
μ No
If No, Skip to Section 5
Flow Description
 Trickle
 Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Tape measure
Flow#2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
1 3 - Noticeable from a
 3 - Clearly visible in
1 3 - Some; origin clear
 sanitary materials)
(e.g., obvious oil
I flow
1 3- Opaque
distance
outfall 
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
 2- Some; indications
possible suds or oil
 2 - Clearly visible in
 Obvious
 2 - Easily detected
of origin (e.g.,
sample bottle
 2 - Cloudy
sheen)
Suspect (one or more indicators with a severity of 3)
 1 - Few/slight; origin
I 1 - Slight cloudiness
I Caulk dam
I 1 - Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
1 - Faint
not obvious
(If No, Skip to Section 6)
OBM
Peeling Paint
I Oil Sheen
I Other:
I Other:
If Yes, type.
(If No, Skip to Section 5)
 DESCRIPTION
 Floatabies
 Yellow
JOther:
 Green
Spaling, Cracking or Chipping
I Petroleum/gas
I Excessive Algae
 Paint
DESCRIPTION
J Yes  No
See severity
I Other:
I Inhibited
 Gray
spns[
I Colors
 Flow Line
No
No
I Potential (presence of two or more indicators)
I Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
No
1 Orange
I Brown
I Excessive
I Other:
I Petroleum (oil sheen)
SIOPO
Brown
Section 4: Physical Indicators for Flowing Outfalls Only
I Oily
 Suds
Are physical indicators that are not related to flow present?
low
Yes
Yes
I Sewage
I Sulfide
Clear
Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
 Present
Section 7: Data Collection
Intermittent flow trap set?
f yes, collected from:
Sample for the lab?
Abnormal Vegetation
Pipe benthic growth
Outfall Damage
Deposits/Stains
Poor pool quality
-Does Not Include
INDICATOR
 INDICATOR
Turbidity
Floatables
Trash!!
Unlikely
JOPO
Color

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section l: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-017
Today's date: 8/22/2022
Time (Military): 0805
Investigators: Brian Wise
Form completed by:Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde:
40.44772N
Longitude: 075.89016W
GPS Unit: Magellan
GPS LMK #: 81-85 Spirit Court
Camera:
Photo #s: #10
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g., origin of outfall, if known): Street drains on Spirit Court
Section 2: Outfall Description
LOCATION
SHAPE
MATERIAL
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
Eliptical
 Double
18"
 Partially
 Fully
 Closed Pipe
 sSteel
 Box
 Triple
With Sediment:
 Other:
 Other:
other: .
 No
 Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
 Parabolic
Top Width: 1' 6"
 rip-rap
Bottom Width: 3°
 Other:
In-Stream
(applicable when collecting samples)
Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELDDATAFORFLOWINGOUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
1 3 - Clearly visible in
I 3 - Some; origin clear
 sanitary materials)
(e.g., obvious oil
flow
anbedo-8
distance
RELATIVE SEVERITY INDEX (1-3)
 COMMENTS
1 2- Some; indications
possible suds or oil
1 2 - Clearly visible in 
 Obvious
1 2 - Easily detected
of origin (e.g.,
 sample bottle
1 2 - Cloudy
sheen)
 1 - Few/slight; origin
I 1 - Slight cloudiness
J Caulk dam
 1 - Faint colors in
sample bottle
Outfall Reconnaissance Inventory Field Sheet
J 1 - Faint
not obvious
(If No, Skip to Section 6)
1OBM
Peeling Paint
1 Sheen
I Other:
I Other:
I Other:
If Yes, type.
(If No, Skip to Section 5)
DESCRIPTION
 Floatables
 Yellow
Jother:
I Green
 Petroleum/gas
 Spalling, Cracking or Chipping
 Excessive Algae
I Paint
 DESCRIPTION
See severity
I Other:
 Inhibited
 Gray
1 Suds
1 Orange
 Flow Line
100
No
I Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
ON区
Brown
lExcessive
I Other:
I Petroleum (oil sheen)
SIOPO
I Brown
Section 4: Physical Indicators for Flowing Outfalls Only
I Oily
 Suds
Are physical indicators that are not related to flow present?
low
Yes
I Sewage
f Sulfide
 Clear
Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
Present
Section 7: Data Collection
Intermittent flow trap set?
f yes, collected from:
Abnormal Vegetation
lab?
Pipe benthic growth
 Outfall Damage
Deposits/Stains
Poor pool quality
-Does Not Include
 INDICATOR
Sample for the l
 INDICATOR
Turbidity
Floatables
Trash!!
Color
 Unlikely
JOPO

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section l: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-018
Today's date: 8/22/2022
Time (Military): 0810
Investigators: Brian Wise
Form completed by: Brian Wise
Temperature (°F): 70
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44821N
Longitude: 075.88733W
GPS Unit: Magellan
GPS LMK #: 93 Spirit Court
Camera: Brian Wise Cellular Device
Photo #s: #11
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
 Commercial
Known Industries:
Notes (e.g., origin of outfall, if known): Drain from Spirit Court
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
 Eliptical
Double
12" x 24"
 Partially
 Fully
 Closed Pipe
 Steel
Box
Triple
With Sediment:
Other:
 Other:
other:
 No
 Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
Parabolic
Top Width: 2' 8"
 rip-rap
 oOther: .
Bottom Width: 3'6"
 Other:
 In-Stream
(applicable when collecting samples)
Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FOR FLOWING OUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
■Flow#1
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
99
Ft, In
Tape measure
Flow #2
Measured length
95
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 - Clearly visible in
 3 - Some; origin clear
sanitary materials)
(e.g., obvious oil
outfall flow
 3 - Opaque
distance
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
possible suds or oil
1 2 - Clearly visible in 
 Obvious
 2 - Easily detected
of origin (e.g.,
sample bottle
1 2 - Cloudy
sheen)
1 - Few/slight; origin
I 1- Slight cloudiness
 Caulk dam
 1  Faint colors in
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
J 1 - Faint
not obvious
(If No, Skip to Section 6)
1OBM
Peeling Paint
 Oil Sheen
I Other:
I Other:
If Yes, type:
(If No, Skip to Section 5)
 DESCRIPTION
 Floatables
 Yellow
Jother:
 Green
 Petroleum/gas
Spaling, Cracking or Chipping
 Excessive Algae
I Paint
 DESCRIPTION
See severity
I Other:
I Inhibited
 Gray
I Suds
 Colors
J Orange
I Flow Line
100.
No
No
I Potential (presence of two or more indicators)
 Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
ON区
I Orange
I Brown
Excessive
I Other:
I Petroleum (oil sheen)
I Brown
Section 4: Physical Indicators for Flowing Outfalls Only
sIOPO
 Suds
Are physical indicators that are not related to flow present?
 Oily
口口
low
Yes
Yes
 Sewage
I Sulfide
I Clear
 Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
 CHECK if
 Present
Section 7: Data Collection
Intermittent flow trap set?
If yes, collected from:
Sample for the lab?
Abnormal Vegetation
Pipe benthic growth
 Outfall Damage
Deposits/Stains
 INDICATOR
 Poor pool quality
-Does Not Include
 INDICATOR
Turbidity
Floatables
Trash!!
 Unlikely
Color
PO

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed: Willow Creek
Outfall ID: 0-019
Today's date: 8/22/2022
Time (Military): 0815
Investigators: Brian Wise
Form completed by: Brian Wise
Temperature (°F): 71
Rainfall (in.):
Last 24 hours: 0.51
Last 48 hours: trace
Latitutde: 40.44806N
Longitude: 075.00746W
GPS Unit: Magellan
GPS LMK #: 133-137 Spirit Court
Camera: Brian Wise Cellular Device
Photo#s:#12&13
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
Commercial
Known Industries:
Notes (e.g.., origin of outfall, if known): Street drains on Spirit Court
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
β CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
 No
 PVC
 HDPE
 Eliptical
 Double
18" x 30"
Partially
 Fully
 Closed Pipe
 Steel
Box
Triple
With Sediment:
 Other:
other:
other:
 No
Partially
 Fully
 Concrete
 Trapezoid
 Earthen
 Open drainage
Parabolic
Top Width: 3' 6"
 rip-rap
 Other: 
Bottom Width: 7'6"
 Other:
 In-Stream
(applicable when collecting samples)
Yes
Flow Present?
μ No
If No, Skip to Section 5
Flow Description
 Moderate
 Trickle
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FOR FLOWING OUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Bottle
Flow #1
Time to fill
Sec
Flow depth
Tape measure
Flow width
Ft, In
Tape measure
Flow #2
Measured length
99
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

sheen, suds, or floating
 3 - Noticeable from a
 3 -- Clearly visible in 
I 3 - Some; origin clear
 sanitary materials)
(e.g., obvious oil
flow
1 3- Opaque
 distance
outfall
RELATIVE SEVERITY INDEX (1-3)
COMMENTS
 2 - Clearly visible in
possible suds or oil
1 Obvious
1 2 - Easily detected
of origin (e.g.,
 sample bottle
1 2 - Cloudy
sheen)
Suspect (one or more indicators with a severity of 3)
Outfall area is about 10" higher than invert elevation, about 35' below O.F. is hole from water flow in channel - 2017 & 2022
1 - Few/slight; origin
I 1 - Slight cloudiness
J Caulk dam
 sample bottle
Outfall Reconnaissance Inventory Field Sheet
1 1 - Faint
not obvious
(If No, Skip to Section 6)
1OBM
Peeling Paint
 Other:
I Other:
Section 8: Any Non-Illicit Discharge Concerns (e.g., trash or needed infrastructure repairs)?
I Other:
 type:
00
(If No, Skip to Section S
DESCRIPTION
 Floatables
If Yes, t
 Yellow
JOther:
Green
 Petroleum/gas
 Spalling, Cracking or Chipping
I Excessive Algae
J Paint
DESCRIPTION
I Yes No
See severity
I Other:
I Inhibited
Gray
I Suds
I Colors
J Orange
 Flow Line
Pool
No
No
I Potential (presence of two or more indicators)
I Rancid/sour
I Sewage (Toilet Paper, etc.)
Corrosion
ON区
I Orange
 Brown
 Excessive
I Other:
 Petroleum (oil sheen)
Odors
Brown
Section 4: Physical Indicators for Flowing Outfalls Only
l Oily
Suds
Are physical indicators that are not related to flow present?
low
fes
Yes
J Yes
I Sewage
I Sulfide
 Clear
Green
CHECK if Present
Section 6: Overall Outfall Characterization
Are Any Physical Indicators Present in the flow?
CHECK if
 Present
Section 7: Data Collection
Intermittent flow trap set?
f yes, collected from:
Sample for the lab?
Abnormal Vegetation
Pipe benthic growth
 Outfall Damage
Deposits/Stains
Poor pool quality
-Does Not Include
 INDICATOR
 INDICATOR
Turbidity
Floatables
Trash!!
Color
 Unlikely
JOPO

SAMPLE OUTFALL SCREENING FORM

OUTFALL RECONNAISSANCE INVENTORY/ SAMPLE COLLECTION FIELD SHEET
Section 1: Background Data
Subwatershed:
Outfall ID:
Today's date:
Time (Military):
Investigators:
Form completed by:
Temperature (°F):
Rainfall (in.):
Last 24 hours:
Last 48 hours:
Latitutde:
Longitude:
GPS Unit:
GPS LMK #:
Camera:
Photo #s:
Land Use in Drainage Area (Check all that apply):
 Industrial
 Open Space
 Ultra-Urban Residential
 Institutional
 Suburban Residential
Other:
Commercial
Known Industries:
Notes (c.g.. origin of outfall, if known):
Section 2: Outfall Description
LOCATION
MATERIAL
SHAPE
DIMENSIONS (IN.)
SUBMERGED
 RCP
 CMP
 Circular
 Single
Diameter/Dimensions:
In Water:
ä No
PVC
 HDPE
Eliptical
 Double
 Partially
 Fully
 Closed Pipe
Steel
Box
 Triple
With Sediment:
 Other:
 Other:
 Other:
 No
 Partially
 Fully
 Concrete
 Trapezoid
Depth: .
 Earthen
 Open drainage
 Parabolic
Top Width: --
 rip-rap
 Other: 
Bottom Width: 
 Other:
In-Stream
(applicable when collecting samples)
 Yes
Flow Present?
 No
If No, Skip to Section 5
Flow Description
 Trickle
Moderate
 Substantial
(If present)
Section 3: Quantitative Characterization
FIELD DATA FOR FLOWING OUTFALLS
PARAMETER
RESULT
UNIT
EQUIPMENT
Volume
Liter
Flow #1
Bottle
Time to fill
Sec
Flow depth
In
Tape measure
Flow width
Ft, In
Flow #2
Tape measure
Measured length
Ft, In
Tape measure
Time of travel
Stop watch
Temperature
Thermometer
pH Units
Test strip/Probe
Ammonia
mg/L
Test strip

Section 7: Data Collection
Section 6: Overall Outfall Characterization
Are physical indicators that are not related to flow present?
Are Any Physical Indicators Present in the flow?
Abnormal Vegetation
Intermittent flow trap set?
Sample for the lab?
Pipe benthic growth
-Does Not Include
Unlikely
Poor pool quality
Outfall Damage
 INDICATOR
yes, 
Deposits/Stains
INDICATOR
 Floatables
Turbidity
Trash!!
Color
Odor
, collected from:
Potential (
Present
CHECK il
CHECK if Present
(presence of two or more i
 Sewage (
J Petroleum (oil sheen)
I Sulfide
Green
I Sewage
lear
Yes
Yes
 (Toilet Paper, etc.)
Flow
Yes
 Oily
 Brown
 Suds
Excessive
Odors
Corrosion
Spalling, Cracking or Chipping
lOrange
Brown
Other:
I Rancid/sour
 indicators)
Outfall Reconnaissance I
 Flow Line
No
Yes
DESCRIPTION
 Orange
 Inhibited
See severity
Excessive Algae
Colors
No
 Petroleum/gas
 Pool
I Other:
Suds
 Red
I Gray
 No
(If No, Skip to Section 5)
 Paint
DESCRIPTION
Suspect (one or more i
other:
I Floatables
 Grecn
If Yes, type:
(If No, Skip to Section 6
 Yellow
I Other:
Inventory Field Sheet
Peeling Paint
I Other:
 Other:
Oil
OBM
1 Sheen
not obvious
1 - Slight cloudiness
1 1 -Faint
 sample bottle
I Caulk dam
RELATIVE SEVERITY INDEX (1-3)
 2 - Some; indications
2 - Cloudy
sample bottle
sheen)
of origin (e.g.,
 Obvious
COMMENTS
in
 3 - Some; origin clear
 3 - Opaque
 3 - Clearly visible in
 3 - Noticeable from a
outfall flow
(e.g., obvious oil
 sanitary materials)
 distance

APPENDIX H
MCM #3 - ILLICIT DISCHARGE DETECTION AND ELIMINATION (IDD&E)
BMP #5 - ACT 167 AND MS4 ORDINANCE #214

MAIDENCREEKWATERSHED
STORMWATER MANAGEMENT
ORDINANCE
ORDINANCE NO. 214
MAIDENCREEK TOWNSHIP, BERKS COUNTY
PENNSYLVANIA
Adopted at a Public Meeting Held on
June 12, 2008

TABLE OF CONTENTS
PAGE
ARTICLE I-GENERAL PROVISIONS
Section 101. Short Title
Section 102. Statement of Findings ..
Section 103. Purpose .
Section 104. Statutory Authority
Section 105. Applicability/Regulated Activities.
Section 106. Repealer .
Section 107. Severability...
Section 108. Compatibility With Other Ordinance Requirements
ARTICLE I-DEFINITIONS
Section 201. Interpretation
Section 202. Definitions.
ARTICLE III-STORMWATER MANAGEMENT.
16
Section 301. General Requirements
16
Section 302. Permit Requirements by Other Government Entities...
.17
Section 303. Erosion and Sediment Control During Regulated Earth Disturbance Activities 17
Section 304. Nonstructural Project Design (Sequencing to Minimize Stormwater Impacts) . 18
Section 305. Ground Water Recharge (Infiltration/Recharge/Bioretention)
19
Section 306. Water Quality Requirements .
25
Section 307. Streambank Erosion Requirements ...
26
Section 308. Stormwater Management Districts.
26
Section 309. Design Criteria for Stormwater Management and Conveyance BMPs ..
28
Section 310. Calculation Methodology ..
33
Section 311. Other Requirements
35
ARTICLE IV-DRAINAGE PLAN REQUIREMENTS.
35
Section 401. General Requirements ..
35
Section 402. Exemptions..
36
Section 403. Drainage Plan Contents 
37
Section 404. Plan Submission
42
Section 405. Drainage Plan Review...
42
Section 406. Modification of Plans.
44
Section 407. Resubmission of Disapproved Drainage Plans
44
ARTICLE V-INSPECTIONS.
44
Section 501. Schedule of Inspections.
44
ARTICLE VI-FEES AND EXPENSES..
45
Section 601. Municipality Drainage Plan Review and Inspection Fee.
45
Section 602. Expenses Covered by Fees .
45
ARTICLE VII-MAINTENANCE RESPONSIBILITIES
45
Section 70l. Performance Guarantee
45
Section 702. Adherence to Approved Stormwater Control and BMP Operations and Maintenance
Plan .
46

Section 703. Operations and Maintenance Agreement for Privately Owned Stormwater Controls
and BMPs..
46
Section 704. Stormwater Management Easements.
46
Section 705. Maintenance Agreement for Privately Owned Stormwater Facilities ..
46
Section 706. Recording of Approved Stormwater Control and BMP Operations and Maintenance
Plan and Related Agreements .
Section 707. Municipal Stormwater Control and BMP Operation and Maintenance Fund.... 47
ARTICLE VIII - PROHIBITIONS
48
Section 801. Prohibited Discharges and Connections .
48
Section 802. Roof Drains
49
Section 803. Alteration of Stormwater Management BMPs.
49
ARTICLE IX-ENFORCEMENT AND PENALTIES
49
Section 901. Right-of-Entry
49
Section 902. Public Nuisance..
50
Section 903. Enforcement Generally
50
Section 904. Suspension and Revocation of Permits and Approvals .
50
Section 905. Penalties
51
Section 906. Notification.
51
Section 907. Enforcement
52
Section 908. Appeals
52
APPENDICES
ORDINANCE APPENDIX A
STORMWATER CONTROLS AND BEST
MANAGEMENT PRACTICES OPERATION AND
MAINTENANCE AGREEMENT
ORDINANCE APPENDIX B
STORMWATER MANAGEMENT DESIGN CRITERIA
ORDINANCE APPENDIX C
DRAINAGE PLAN APPLICATION
ORDINANCE APPENDIX D
STORMWATER MANAGEMENT DISTRICT
WATERSHED MAP
ORDINANCE APPENDIX E
LOW IMPACT DEVELOPMENT PRACTICES
ORDINANCE APPENDIX F
REFERENCES
ORDINANCE APPENDIX G
WEST NILE VIRUS GUIDANCE
ORDINANCE APPENDIX H
STORMWATER MANAGEMENT PRACTICES FOR
PROJECTS WHICH ARE EXEMPT UNDER SECTION
402 OF THIS ORDINANCE

ARTICLE I-GENERAL PROVISIONS
Section 101. Short Title
This Ordinance shall be known and may be cited as the “Maiden Creek Watershed Stormwater
Management Ordinance").
Section 102. Statement of Findings
The governing body of the Township of Maidencreek finds that:
A.
Inadequate management of accelerated stormwater runoff resulting from development
throughout a watershed increases flood flows and velocities, contributes to erosion and
sedimentation, overtaxes the carrying capacity of existing streams and storm sewers, greatly
increases the cost of public facilities to convey and manage stormwater, undermines
floodplain management and flood reduction efforts in upstream and downstream
communities, reduces groundwater recharge, and threatens public health and safety.
B.
Inadequate planning and management of stormwater runoff resulting from land development
and redevelopment throughout a watershed can also harm surface water resources by
changing the natural hydrologic patterns, accelerating stream flows (which increase scour
and erosion of stream-beds and stream-banks thereby elevating sedimentation), destroying
aquatic habitat and elevating aquatic pollutant concentrations and loadings such as sediments,
nutrients, heavy metals and pathogens. Groundwater resources are also impacted through
loss of recharge.
C.
A comprehensive program of stormwater management (SWM), including minimization of
impacts of development, redevelopment and activities causing accelerated erosion, is
fundamental to the public health, safety, welfare, and the protection of the people of the
Municipality and all the people of the Commonwealth, their resources, and the environment.
D.
Inadequate management of accelerated stormwater runoff resulting from development
throughout a watershed poses a threat to surface and groundwater quality.
E.
Stormwater can be an important water resource by providing groundwater recharge for water
supplies and base flow of streams, which also protects and maintains surface water quality.
F.
Through project design, impacts from stormwater runoff can be minimized to maintain the
natural hydrologic regime, and sustain high water quality, groundwater recharge, stream
baseflow and aquatic ecosystems. The most cost effective and environmentally advantageous
way to manage storm water runoff is through nonstructural project design, minimizing
impervious surfaces and sprawl, avoiding sensitive areas (i.e. stream buffers, floodplains,
steep slopes), and designing to topography and soils to maintain the natural hydrologic
regime.
Public education on the control of pollution from stormwater is an essential component in
successfully addressing stormwater.
Federal and state regulations require certain municipalities to implement a program of
stormwater controls. These municipalities are required to obtain a permit for stormwater

discharges from their separate storm sewer systems under the National Pollutant Discharge
Elimination System (NPDES).
Non-stormwater discharges to municipal separate storm sewer systems can contribute to
pollution of waters of the Commonwealth by the Municipality.
Section 103. Purpose
The purpose of this Ordinance is to promote the public health, safety, and welfare within the Maiden
Creek Watershed by maintaining the natural hydrologic regime by minimizing the impacts described
in Section 102 of this Ordinance through provisions designed to:
A.
Promote alternative project designs and layout that minimizes impacts to surface and ground
water.
B.
Promote nonstructural BMPs.
Minimize increases in stormwater volume.
D.
Minimize impervious surfaces.
E.
Manage accelerated runoff and erosion and sedimentation problems at their source by
regulating activities that cause these problems.
F.
Utilize and preserve the existing natural drainage systems.
G.
Manage stormwater impacts close to the runoff source, which requires a minimum of
structures and relies on natural processes.
H.
Focus on infiltration of stormwater, to maintain groundwater recharge, to prevent
degradation of surface and groundwater quality and to otherwise protect water resources.
Strive to maintain existing base flows and quality of streams and watercourses.
J.
Meet legal water quality requirements under state law, including regulations at 25 Pa. Code
Chapter 93.4a to protect and maintain “existing uses" and maintain the level of water quality
to support those uses in all streams, and to protect and maintain water quality in “special
protection" streams.
K.
Address the quality and quantity of stormwater discharges from the development site.
L.
Provide a mechanism to identify controls necessary to meet the NPDES permit requirements.
M.
Implement an illegal discharge detection and elimination program to address non-stormwater
discharges into the Township of Maidencreek's separate storm sewer system.
N.
Preserve and restore the flood-carrying capacity of streams.
0.
Prevent scour and erosion of streambanks and streambeds.
P.
Provide proper maintenance of all permanent stormwater management facilities and BMPs
that are implemented in the Township of Maidencreek.

Q.
Provide performance standards and design criteria for watershed-wide stormwater
management and planning.
R.
NPDES Requirements
Federal regulations approved October 1999 require operators of small municipal separate
storm sewer systems (MS4s) to obtain NPDES Phase I permits from DEP by March 2003.
(NPDES II is an acronym for the National Pollutant Discharge Elimination System Phase I
Stormwater Permitting Regulations.) This program affects all municipalities in “urbanized
areas" of the state. This definition applies to all Maiden Creek watershed municipalities
identified in Table III-1 of the Maiden Creek Stormwater Management Plan Volume II as
NPDES Phase II municipalities. Therefore, these identified municipalities will be subject to
the NPDES Phase II requirements mandated by the Federal Clean Water Act as administered
by DEP. For more information on NPDES II requirements, contact the DEP Regional
Office.
Section 104. Statutory Authority
Primary Authority:
The Township of Maidencreek is empowered to regulate these activities by the authority of the Act
of October 4, 1978, P.L. 864 (Act 167), 32 P.S. Section 680.1, et seq., as amended, the "Storm Water
Management Act"' and the (appropriate municipal code).
Secondary Authority
The Township of Maidencreek also is empowered to regulate land use activities that affect runoff by
the authority of the Act of July 31, 1968, P.L. 805, No. 247, The Pennsylvania Municipalities
Planning Code, as amended.
Section 105. Applicability/Regulated Activities
A.
All Regulated Activities and all activities that may affect stormwater runoff, including Land
Development and Earth Disturbance Activity, are subject to regulation by this Ordinance.
Section 106. Repealer
Any ordinance or ordinance provision of the Township of Maidencreek inconsistent with any of the
provisions of this Ordinance is hereby repealed to the extent of the inconsistency only.
Section 107. Severability
Should any section or provision of this Ordinance be declared invalid by a court of competent
jurisdiction, such decision shall not affect the validity of any of the remaining provisions of this
Ordinance.
Section 108. Compatibility With Other Ordinance Requirements

Approvals issued and actions taken under this Ordinance do not relieve the Applicant of the
responsibility to secure required permits or approvals for activities by any other code, law, regulation
or ordinance.
ARTICLE II-DEFINITIONS
Section 201. Interpretation
For the purposes of this Ordinance, certain terms and words used herein shall be interpreted as
follows:
A.
Words used in the present tense include the future tense; the singular number includes the
plural, and the plural number includes the singular; words of masculine gender include
feminine gender; and words of feminine gender include masculine gender.
B.
The word "includes" or "including" shall not limit the term to the specific example, but is
intended to extend its meaning to all other instances of like kind and character.
C.
The word "person" includes an individual, firm, association, organization, partnership, trust,
company, corporation, unit of government, or any other similar entity.
The words "shall" and "must" are mandatory; the words "may" and "should" are permissive.
E.
The words "used or occupied" include the words "intended, designed, maintained, or arranged
to be used, occupied or maintained."
Section 202. Definitions
Accelerated Erosion - The removal of the surface of the land through the combined action of man's
activity and the natural processes of a rate greater than would occur because of the natural process
alone.
Agricultural Activities - The work of producing crops and raising livestock including tillage,
plowing, disking, harrowing, pasturing and installation of conservation measures. For purposes of
regulation by this Ordinance construction of new buildings or impervious area is not considered an
agricultural activity.
Alteration - As applied to land, a change in topography as a result of the moving of soil and rock
from one location or position to another; also the changing of surface conditions by causing the
surface to be more or less impervious; land disturbance.
As-built drawings - Those maintained by the Contractor as he constructs the project and upon which
he documents the actual locations of the building components and changes to the original contract
documents. These, or a copy of same, are turned over to the Engineer at the completion of the project
Applicant - A person who has filed an application for approval to engage in any Regulated Activities
as defined in Section 105 of this Ordinance.
Bankfull - The channel at the top-of-bank or point where water begins to overflow onto a floodplain.

Base Flow - Portion of stream discharge derived from groundwater; the sustained discharge that does
not result from direct runoff or from water diversions, reservoir releases, piped discharges, or other
human activities.
Bioretention - A stormwater retention area which utilizes woody and herbaceous plants and soils to
remove pollutants before infiltration occurs.
BMP (Best Management Practice) - Methods, measures or practices to prevent or reduce surface
runoff and/or water pollution, including but not limited to, structural and non-structural stormwater
management practices and operation and maintenance procedures. See also Non-structured Best
Management Practice (BMP).
Buffer - The area of land immediately adjacent to any stream, measured perpendicular to and
horizontally from the top-of-bank on both sides of a stream.
Carbonate Bedrock (Areas) - Rock consisting chiefly of carbonate minerals, such as limestone and
dolomite; specifically a sedimentary rock composed of more than 50% by weight of carbonate
minerals that underlies soil or other unconsolidated, superficial material.
Channel - A drainage element in which stormwater flows with an open surface. Open channels
include, but shall not be limited to, natural and man-made drainage ways, swales, streams, ditches,
canals, and pipes flowing partly full.
Channel Erosion - The widening, deepening, and headward cutting of small channels and
waterways, caused by stormwater runoff or bankfull flows.
Cistern - An underground reservoir or tank for storing rainwater.
Conservation District - The Berks County Conservation District.
Culvert - A structure with appurtenant works, which carries water under or through an embankment
or fill.
Dam - An artificial barrier, together with its appurtenant works, constructed for the purpose of
impounding or storing water or another fluid or semifluid, or a refuse bank, fill or structure for
highway, railroad or other purposes which does or may impound water or another fluid or semifluid.
Department - The Pennsylvania Department of Environmental Protection.
Designee - The agent of the Berks County Planning Commission, Berks County Conservation
District and/or agent of the governing body involved with the administration, review or enforcement
of any provisions of this ordinance by contract or memorandum of understanding.
Design Professional (Qualified) - Any person licensed by the Pennsylvania Department of State or
otherwise qualified by law to perform the work required by the Ordinance
Design Storm - The magnitude and temporal distribution of precipitation from a storm event
measured in probability of occurrence (e.g., a 5-year storm) and duration (e.g., 24-hours), used in the
design and evaluation of stormwater management systems.

Designated Watershed (ACT 167) - A Watershed which is listed under the Pennsylvania
Department of Environmental Protection's “Index of Designated Watersheds (Stormwater
Management)" pursuant to the Stormwater Management Act P.L. 864, No. 167, October 4, 1978, and
published in the Pennsylvania Bulletin on May 31, 1980 and August 9, 1980, as amended on
November 19, 1991, April 21, 1992, June 21, 1994, April 16, 1996, April 15, 1997 and December 16,
1997).
Detention Basin - An impoundment designed to collect and retard stormwater runoff by temporarily
storing the runoff and releasing it at a predetermined rate. Detention basins are designed to drain
completely shortly after any given rainfall event and are dry until the next rainfall event.
Detention District - Those subareas in which some type of detention is required to meet the plan
requirements and the goals of Act 167.
Developer - A person that seeks to undertake any Regulated Earth Disturbance activities at a project
site in the Township of Maidencreek.
Development - See “Earth Disturbance Activity." The term includes redevelopment.
Development Site - The specific tract of land where any Earth Disturbance activities in the Township
of Maidencreek are planned, conducted or maintained.
Diffused Drainage Discharge - Drainage discharge not confined to a single point location or
channel, such as sheet flow or shallow concentrated flow.
Discharge - To release water from a project, site, aquifer, drainage basin or other point of interest
(verb); The rate and volume of flow of water such as in a stream, generally expressed in cubic feet
per second (volume per unit of time) (noun). See also Peak Discharge.
Discharge Point - The point where stormwater flow into.
Disturbed Areas - Unstabilized land area where an earth disturbance activity is occurring or has
occurred.
Ditch - An artificial waterway for irrigation or stormwater conveyance.
Downslope Property Line - That portion of the property line of the lot, tract, or parcels of land being
developed located such that overland or pipe flow from the site would be directed towards it.
Drainage Conveyance Facility - A Stormwater Management Facility designed to transmit
stormwater runoff and shall include channels, swales, pipes, conduits, culverts, storm sewers, etc.
Drainage Easement - A right granted by a landowner to a grantee, allowing the use of private land
for stormwater management purposes.
Drainage Permit - A permit issued by the Municipal governing body after the drainage plan has
been approved.
Drainage Plan - The documentation of the stormwater management system, if any, to be used for a
given development site, the contents of which are established in Section 403.

Earth Disturbance Activity - A construction or other human activity which disturbs the surface of
land, including, but not limited to, clearing and grubbing, grading, excavations, embankments, land
development, agricultural plowing or tilling, timber harvesting activities, road maintenance activities,
mineral extraction, and the moving, depositing, stockpiling, or storing of soil, rock or earth materials.
Emergency Spillway - A conveyance area that is used to pass peak discharge greater than the
maximum design storm controlled by the stormwater facility.
Encroachment - A structure or activity that changes, expands or diminishes the course, current or
cross section of a watercourse, floodway or body of water.
Erosion - The process by which the surface of the land, including channels, is worn away by water,
wind, or chemical action.
Erosion and Sediment Control Plan - A plan for a project site which identifies BMPs to minimize
accelerated erosion and sedimentation.
Exceptional Value Waters - Surface waters of high quality which satisfy Pennsylvania Code Title
25 Environmental Protection, Chapter 93, Water Quality Standards, $ 93.4b(b) (relating to anti-
degradation).
Existing Conditions - The initial condition of a project site prior to the proposed alteration. If the
initial condition of the site is undeveloped land, the land use shall be considered as "meadow" unless
the natural land cover is proven to generate lower curve numbers or Rational "C" value, such as
forested lands.
Flood - A temporary condition of partial or complete inundation of land areas from the overflow of
streams, rivers, and other waters of this Commonwealth.
Floodplain - Any land area susceptible to inundation by water from any natural source or delineated
by applicable Department of Housing and Urban Development, Federal Insurance Administration
Flood Hazard Boundary - Mapped as being a special flood hazard area.
Floodway - The channel of the watercourse and those portions of the adjoining floodplains, which
are reasonably required to carry and discharge the 100-year frequency flood. Unless otherwise
specified, the boundary of the floodway is as indicated on maps and flood insurance studies provided
by FEMA. In an area where no FEMA maps or studies have defined the boundary of the 100-year
frequency floodway, it is assumed - absent evidence to the contrary - that the floodway extends from
the stream to 50 feet from the top-of-bank.
Fluvial Geomorphology - The study of landforms associated with river channels and the processes
that form them.
Forest Management/Timber Operations - Planning and activities necessary for the management of
forest land with no change of land use proposed. These include timber inventory and preparation of
construction, timber harvesting and reforestation.
Freeboard - A vertical distance between the elevation of the design high-water and the top of a dam,
levee, tank, basin, swale, or diversion berm. The space is required as a safety margin in a pond or
basin.

Grade - A slope, usually of a road, channel or natural ground specified in percent and shown on
plans as specified herein. (To) Grade - to finish the surface of a roadbed, top of embankment or
bottom of excavation.
Grassed Waterway - A natural or constructed waterway, usually broad and shallow, covered with
erosion-resistant grasses, used to convey surface water.
Groundwater - Water beneath the earth's surface, often between saturated soil and rock that supplies
wells and springs.
Groundwater Recharge - Replenishment of existing natural underground water supplies without
degrading groundwater quality.
HEC-HMS - The U.S. Army Corps of Engineers, Hydrologic Engineering Center (HEC) -
Hydrologic Modeling System (HMS). This model was used to model the Maiden Creek watershed
during the ACT 167 Plan development and was the basis for the Standards and Criteria of this
Ordinance.
High Quality Waters - Surface waters having quality which exceeds levels necessary to support
propagation of fish, shellfish, and wildlife and recreation in and on the water by satisfying
Pennsylvania Code Title 25 Environmental Protection, Chapter 93 Water Quality Standards, $
93.4b(a).
Hotspots - Areas where land use or activities generate highly contaminated runoff, with
concentrations of pollutants in excess of those typically found in stormwater.
Hydrograph - A graph of discharge versus time for a selected point in the drainage system.
Hydrologic Regime (natural) - The hydrologic cycle or balance that sustains quality and quantity of
stormwater, baseflow, storage, and groundwater supplies under natural conditions.
Hydrologic Soil Group, - A classification of soils by the Natural Resources Conservation Service,
formerly the Soil Conservation Service, into four runoff potential groups. The groups range from A
soils, which are very permeable and produce little runoff, to D soils, which are not very permeable
and produce much more runoff.
Impervious Surface - A surface that prevents the infiltration of water into the ground. Impervious
surface includes, but is not limited to, any roof, parking or driveway areas, and any new streets and
sidewalks. Any surface areas designed to be gravel or crushed stone shall be assumed to be
impervious surfaces.
Impoundment - A retention or detention basin designed to retain stormwater runoff and release it at
a controlled rate.
Infill - Development that occurs on smaller parcels that remain undeveloped but are within or very
close proximity to urban areas. The development relies on existing infrastructure and does not
require an extension of water, sewer or other public utilities.
Infiltration - Movement of surface water into the soil, where it is absorbed by plant roots, evaporated
into the atmosphere, or percolates downward to recharge groundwater.
Infiltration Structures - A structure designed to direct runoff into the underground water (e.g.,
french drains, seepage pits, seepage trench).
10

Inlet - The upstream end of any structure through which water may flow.
weeks or months in response to seasonal precipitation, due to groundwater discharge.
Land Development - (i) the improvement of one lot or two or more contiguous lots, tracts, or parcels
of land for any purpose involving (a) a group of two or more residential or nonresidential buildings,
whether proposed initially or cumulatively, or a single nonresidential building on a lot or lots
regardless of the number of occupants or tenure or (b) the division or allocation of land or space,
whether initially or cumulatively, between or among two or more existing or prospective occupants
by means of, or for the purpose of streets, common areas, leaseholds, condominiums, building
groups, or other features; (i) A subdivision of land; (i) development in accordance with Section
503(1.1) of the PA Municipalities Planning Code.
Limiting zone - A soil horizon or condition in the soil profile or underlying strata which includes one
of the following:
(i)
A seasonal high water table, whether perched or regional, determined by direct
observation of the water table or indicated by soil mottling.
(ii)
A rock with open joints, fracture or solution channels, or masses of loose rock
fragments, including gravel, with insufficient fine soil to fill the voids between the
fragments.
(ii)
A rock formation, other stratum or soil condition which is so slowly permeable that it
effectively limits downward passage of effluent.
Lot - A part of a subdivision or a parcel of land used as a building site or intended to be used for
building purposes, whether immediate or future, which would not be further subdivided.
Main Stem (Main Channel) - Any stream segment or other runoff conveyance facility used as a
reach in the Maiden Creek hydrologic model.
Manning Equation (Manning formula) - A method for calculation of velocity of flow (e.g., feet per
second) and flow rate (e.g., cubic feet per second) in open channels based upon channel shape,
roughness, depth of flow and slope. "Open channels" may include closed conduits so long as the
flow is not under pressure.
Municipal Engineer - A professional engineer licensed as such in the Commonwealth of
Pennsylvania, duly appointed as the engineer for a municipality, planning agency or joint planning
commission.
Municipality - Township of Maidencreek, Berks County, Pennsylvania.
Natural Hydrologic Regime (see hydrologic regime)
Natural Recharge Area - Undisturbed surface area or depression where stormwater collects, and a
portion of which infiltrates and replenishes the underground and groundwater.
Non-point Source Pollution - Pollution that enters a water body from diffuse origins in the
watershed and does not result from discernible, confined, or discrete conveyances.
11

Non Stormwater Discharges - Water flowing in stormwater collection facilities, such as pipes or
swales, which is not the result of a rainfall event or snowmelt.
Nonstructural Best Management Practice (BMPs) - Methods of controlling stormwater runoff
quantity and quality, such as innovative site planning, impervious area and grading reduction,
protection of natural depression areas, temporary ponding on site and other techniques.
NPDES - National Pollutant Discharge Elimination System, the federal government's system for
issuance of permits under the Clean Water Act, which is delegated to DEP in Pennsylvania.
NRCS - Natural Resource Conservation Service (previously SCS).
Outfall - “Point source" as described in 40 CFR $ 122.2 at the point where the Township of
Maidencreek's storm sewer system discharges to surface waters of the Commonwealth.
Outlet - Points of water disposal to a stream, river, lake, tidewater or artificial drain.
Parent Tract - The parcel of land from which a land development or subdivision originates,
determined from the date of municipal adoption of this ordinance.
Parking Lot Storage - Involves the use of parking areas as temporary impoundments with controlled
release rates during rainstorms.
Peak Discharge - The maximum rate of stormwater runoff from a specific storm event.
Penn State Runoff Model - The computer-based hydrologic model developed at the Pennsylvania
State University.
Pipe - A culvert, closed conduit, or similar structure (including appurtenances) that conveys
stormwater.
Planning Commission - The planning commission of the Township of Maidencreek.
Point Source - any discernible, confined and discrete conveyance, including, but not limited to, any
pipe, ditch, channel, tunnel, or conduit from which stormwater is or may be discharged, as defined in
State regulations at 25 Pa. Code $ 92.1.
Post Construction - Period after construction where disturbed areas are stabilized, stormwater
controls are in place and functioning and all proposed improvements in the approved land
development plan are completed.
Predevelopment - Undeveloped/Natural Condition.
Pretreatment - Techniques employed in stormwater BMPs to provide storage or filtering to trap
coarse materials and other pollutants before they enter the system, but not necessarily meet the water
quality volume requirements of 306.
Project Site - The specific area of land where any Regulated Earth Disturbance activities in the
Township of Maidencreek are planned, conducted or maintained.
Rational Formula - A rainfall-runoff relation used to estimate peak flow
12

Recharge - The replenishment of groundwater through the infiltration of rainfall, other surface
waters, or land application of water or treated wastewater.
Record Drawings - Original documents revised to suit the as-built conditions and subsequently
provided by the Engineer to the Client. The Engineer takes the Contractor's as-builts, reviews them
in detail with his/her own records for completeness, then either turns these over to the Client or
transfers the information to a set of reproducibles, in both cases for the Client's permanent records.
Redevelopment - The demolition, construction, reconstruction, alteration, or improvement exceeding
2,000 square feet of land disturbance performed on sites where existing land use is commercial,
industrial, institutional, or multifamily residential. Maintenance activities such as top-layer grinding
and re-paving are not considered to be redevelopment. Interior remodeling projects and tenant
improvements are also not considered to be redevelopment. Utility trenches in streets are not
considered redevelopment unless more than 50% of the street width is removed and re-paved.
Regulated Activities - Any actions or proposed actions that involve the alteration or development of
land in a manner that may affect stormwater runoff.
Regulated Earth Disturbance Activity - Activity involving Earth Disturbance subject to regulation
under 25 PA Code Chapters 92, Chapter 102, or the Clean Streams Law.
Release Rate - The percentage of existing conditions peak rate of runoff from a site or subarea to
which the proposed condition peak rate of runoff must be reduced to protect downstream areas.
Retention Basin - A structure in which stormwater is stored and not released during the storm event.
Retention basins do not have an outlet other than recharge and must infiltrate stored water in no more
than 4 days.
Return Period - The average interval, in years, within which a storm event of a given magnitude can
be expected to recur. For example, the 25-year return period rainfall would be expected to recur on
the average of once every twenty-five years.
Riser - A vertical pipe extending from the bottom of a pond that is used to control the discharge rate
from the pond for a specified design storm.
Road Maintenance - earth disturbance activities within the existing road cross-section, such as
grading and repairing existing unpaved road surfaces, cutting road banks, cleaning or clearing
drainage ditches and other similar activities.
Roof Drains - A drainage conduit or pipe that collects water runoff from a roof and leads it away
from the structure.
Rooftop Detention - Temporary ponding and gradual release of stormwater falling directly onto flat
roof surfaces by incorporating controlled-flow roof drains into building designs.
Runoff - Any part of precipitation that flows over the land surface.
SALDO - Subdivision and Land Development Ordinance.
Sediment Basin - A barrier, dam, retention or detention basin located and designed to retain rock,
sand, gravel, silt, or other material transported by water during construction.
13

Sediment Pollution - The placement, discharge or any other introduction of sediment into the waters
of the Commonwealth.
Sedimentation - The process by which mineral or organic matter is accumulated or deposited by the
movement of water or air.
Seepage Pit/Seepage Trench - An area of excavated earth filled with loose stone or similar coarse
material, into which surface water is directed for infiltration into the underground water.
Separate Storm Sewer System - A conveyance or system of conveyances (including roads with
drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels or storm
drains) primarily used for collecting and conveying stormwater runoff.
Shallow Concentrated Flow - Stormwater runoff flowing in shallow, defined ruts prior to entering a
defined channel or waterway.
Sheet Flow - A flow process associated with broad, shallow water movement on sloping ground
surfaces that is not channelized or concentrated.
Soil-Cover Complex Method - A method of runoff computation developed by the NRCS that is
based on relating soil type and land use/cover to a runoff parameter called Curve Number (CN).
Source Water Protection Areas (SWPA) - The zone through which contaminants, if present, are
likely to migrate and reach a drinking water well or surface water intake.
Special Geologic Features - Carbonate bedrock features, including but not limited to closed
depressions, existing sinkholes, fracture traces, lineaments, joints, faults, caves and pinnacles, which
may exist and must be identified on a site when stormwater management BMPs are being considered.
Special Protection Subwatersheds - Watersheds for which the receiving waters are exceptional
value (EV) or high quality (HQ) waters.
Spillway - A conveyance that is used to pass the peak discharge of the maximum design storm
controlled by the stormwater facility.
State Water Quality Requirements - The regulatory requirements to protect, maintain, reclaim and
restore water quality under PA Code Title 25 and the Clean Streams Law.
Storage Indication Method - A reservoir routing procedure based on solution of the continuity
equation (inflow minus outflow equals the change in storage) with outflow defined as a function of
storage volume and depth.
Storm Frequency - The number of times that a given storm "event" occurs or is exceeded on the
average in a stated period of years. See "Return Period".
Storm Sewer - A system of pipes and/or open channels that convey intercepted runoff and
stormwater from other sources, but excludes domestic sewage and industrial wastes.
Stormwater - The surface runoff generated by precipitation reaching the ground surface.
Stormwater Management Facility - Any structure, natural or man-made, that, due to its condition,
design, or construction, conveys, stores, or otherwise affects stormwater runoff quality, rate or
14

quantity. Typical stormwater management facilities include, but are not limited to, detention and
retention basins, open channels, storm sewers, pipes, and infiltration structures.
Stormwater Management Plan - The plan for managing those land use activities that will influence
stormwater runoff quality and quantity and that would impact the Maiden Creek Watershed adopted
by Berks County, and Lehigh County as required by the Act of October 4, 1978, P.L. 864, (Act 167),
and known as the "Maiden Creek Watershed Act 167 Stormwater Management Plan'.
Stormwater Management Site Plan - The plan prepared by the Applicant or his representative
indicating how stormwater runoff will be managed at the particular site of interest according to this
Ordinance.
Stream - A natural watercourse.
Stream Buffer - The land area adjacent to each side of a stream, essential to maintaining water
quality. (See Buffer)
Stream Enclosure - A bridge, culvert or other structure in excess of 100 feet in length upstream to
downstream which encloses a regulated water of this Commonwealth.
Subarea (Subwatershed) - The smallest drainage unit of a watershed for which stormwater
management criteria have been established in the Stormwater Management Plan.
Subdivision - The division or redivision of a lot, tract, or parcel of land by any means into two or
more lots, tracts, parcels or other divisions of land including changes in existing lot lines for the
purpose, whether immediate or future, of lease, partition by the court for distribution to heirs or
devisees, transfer of ownership, or building or lot development: Provided, however, that the
subdivision by lease of land for agricultural purposes into parcels of more than ten acres, not
involving any new street or easement of access or any residential dwelling, shall be exempted.
Surface Waters of the Commonwealth - Any and all rivers, streams, creeks, rivulets, ditches,
watercourses, storm sewers, lakes, dammed water, wetlands, ponds, springs, and all other bodies or
channels of conveyance of surface, or parts thereof, whether natural or artificial, within or on the
boundaries of this Commonwealth.
Swale - A low lying stretch of land which gathers or carries surface water runoff.
Timber Operations - See Forest Management.
Time-of-Concentration (Tc) - The time for surface runoff to travel from the hydraulically most
distant point of the watershed to a point of interest within the watershed. This time is the combined
total of overland flow time and flow time in pipes or channels, if any.
Top-of-Bank - Highest point of elevation in a stream channel cross section at which a rising water
level just begins to flow out of the channel and over the floodplain.
Vernal Pond - Seasonal depressional wetlands that are covered by shallow water for variable periods
from winter to spring, but may be completely dry for most of the summer and fall.
Watercourse - A channel or conveyance of surface water having defined bed and banks, whether
natural or artificial, with perennial or intermittent flow.
15

Waters of the Commonwealth - Any and all rivers, streams, creeks, rivulets, ditches, watercourses,
storm sewers, lakes, dammed water, wetlands, ponds, springs, and all other bodies or channels of
conveyance of surface and underground water, or parts thereof, whether natural or artificial, within or
on the boundaries of this Commonwealth.
Watershed - Region or area drained by a river, watercourse or other body of water, whether natural
or artificial.
Wellhead - 1. a structure built over a well, 2. the source of water for a well.
Wellhead Protection Area - The surface and subsurface area surrounding a water supply well, well
field, spring or infiltration gallery supplying a public water system, through which contaminants are
reasonably likely to move toward and reach the water source.
Wet Basin - Pond for urban runoff management that is designed to detain urban runoff and always
contains water.
Wetland - Those areas that are inundated or saturated by surface or groundwater at a frequency and
duration sufficient to support, and that under normal circumstances do support, a prevalence of
vegetation typically adapted for life in saturated soil conditions, including swamps, marshes,
bogs, fens, and similar areas.
ARTICLE III-STORMWATER MANAGEMENT
Section 30l. General Requirements
A.
Applicants proposing regulated activities in Maiden Creek Watershed which do not fall under
the exemption criteria shown in Section 402 shall submit a drainage plan consistent with the
Maiden Creek Watershed Stormwater Management Plan to the Township of Maidencreek for
review. These criteria shall apply to the total proposed development even if development is
to take place in stages
B.
The Applicant is required to evaluate practicable alternatives to the surface discharge of
stormwater, the creation of impervious surfaces and the degradation of waters of the
Commonwealth, and must maintain as much as possible the natural hydrologic regime
C.
The Drainage Plan must be designed consistent with the sequencing provisions of Section
304 to ensure maintenance of the natural hydrologic regime and to promote groundwater
recharge and protect groundwater and surface water quality and quantity. The Drainage Plan
designer must proceed sequentially in accordance with Article III of this ordinance.
D.
The existing points of concentrated drainage that discharge onto adjacent property shall not
be altered in any manner which could cause property damage without permission of the
affected property owner(s) and shall be subject to any applicable discharge criteria specified
in this Ordinance.
E.
Areas of existing diffused drainage discharge shall be subject to any applicable discharge
criteria in the general direction of existing discharge, whether proposed to be concentrated or
maintained as diffused drainage areas, except as otherwise provided by this ordinance. If
diffused drainage discharge is proposed to be concentrated and discharged onto adjacent
property, the Applicant must document that adequate downstream conveyance facilities exist
16

to safely transport the concentrated discharge, or otherwise prove that no erosion,
sedimentation, fiooding or other impacts will result from the concentrated discharge.
F.
Where a development site is traversed by existing watercourses, drainage easements shall be
provided conforming to the line of such watercourses. The terms of the easement shall
conform to the stream buffer requirements contained in Section 306.F of this Ordinance.
G.
Any stormwater management facilities regulated by this Ordinance that would be located in
or adjacent to waters of the Commonwealth or wetlands shall be subject to approval by
PaDEP through the Joint Permit Application process, or, where deemed appropriate by
PaDEP, the General Permit process. When there is a question whether wetlands may be
involved, it is the responsibility of the Applicant or his agent to show that the land in
question cannot be classified as wetlands, otherwise approval to work in the area must be
obtained from PaDEP.
H.
Any alteration that affects stormwater flow directly or indirectly toward a PennDOT facility
shall be subject to PennDOT regulations.
1.
Minimization of impervious surfaces and infiltration of runoff through seepage beds,
infiltration trenches, etc. are encouraged, where soil conditions permit, to reduce the size or
eliminate the need for detention facilities or other structural BMPs.
J.
Roof drains shall not be connected to impervious surfaces in order to promote overland flow
and infiltration/ percolation of stormwater where advantageous to do so.  When site
conditions preclude infiltration/percolation, then it shall be permitted on a case by case basis
by the municipality.
K.
All stormwater runoff shall be treated for water quality.
L.
Transference of runoff to or from an EV/HQ watershed is prohibited unless otherwise
authorized by DEP, DRBC or SRBC.
Section 302. Permit Requirements by Other Government Entities
Permits must comply with any and all applicable local, county, state and federal regulations.
Section 303. Erosion and Sediment Control During Regulated Earth Disturbance Activities
A.
No Regulated Earth Disturbance activities within the Township of Maidencreek shall
commence until the Township of Maidencreek receives an approval from the Conservation
District of an Erosion and Sediment Control Plan for construction activities.
DEP has regulations that require an Erosion and Sediment Control Plan for any earth
disturbance activity of 5,000 square feet or more, under 25 Pa. Code $ 102.4(b).
C.
In addition, under 25 Pa. Code Chapter 92, a DEP “NPDES Construction Activities" permit
is required for Regulated Earth Disturbance activities.
17

D.
Evidence of any necessary permit(s) for Regulated Earth Disturbance activities from the
appropriate DEP regional office or County Conservation District must be provided to the
Township of Maidencreek. The issuance of an NPDES Construction Permit (or permit
coverage under the statewide General Permit (PAG-2) satisfies the requirements subsection
303.A.
E.
A copy of the Erosion and Sediment Control plan and any required permit, as required by
DEP regulations, shall be available at the project site at all times.
F.
Additional erosion and sediment control design standards and criteria are recommended to be
applied where infiltration BMPs are proposed shall include the following:
1.
Areas proposed for infiltration BMPs shall be protected from sedimentation and
compaction during the construction phase to maintain maximum infiltration capacity.
2.
Infiltration BMPs shall not be constructed nor receive runoff until the entire
contributory drainage area to the infiltration BMP has achieved final stabilization
Section 304. Nonstructural Project Design (Sequencing to Minimize Stormwater Impacts)
A.
For projects disturbing one (1) acre or more, the design of all Regulated Activities shall
include evaluation of practicable alternatives to the surface discharge of stormwater, the
creation of impervious surfaces, and the degradation of waters of the Commonwealth, and
must maintain as much as possible the natural hydrologic regime of the site.
1.
An alternative is practicable if it is available and capable of being done after taking
into consideration cost, existing technology and logistics in light of overall project
purposes, and other municipal requirements.
2.
All practicable alternatives to the discharge of stormwater are presumed to have less
adverse impact on quantity and quality of waters of the Commonwealth unless
otherwise demonstrated.
B. The Applicant shall demonstrate that the design of the Regulated Activities that disturb one
(1) acre or more include consideration of the following issues:
1.
Prepare an Existing Resource and Site Analysis Map (ERSAM), showing
environmentally sensitive areas including, but not limited to, steep slopes, ponds,
lakes, streams, wetlands, hydric soils, vernal pools, flood plains, stream buffer zones,
hydrologic soil groups A and B (areas conducive to infiltration), special geologic
features, any existing recharge areas and any other requirements outlined in the
municipal Subdivision and Land Development ordinance.
2.
Establish appropriate buffers for each of the delineated environmentally sensitive areas
per the municipal zoning ordinance (See Section 306.D for stream buffers and Section
305.K for special geologic feature buffers).
3.
Prepare a draft project layout avoiding sensitive areas identified in Section 304.B.1.
18

4.
Identify site specific existing conditions drainage areas, discharge points, recharge
areas and hydrologic soil groups A and B.
5.
Evaluate Nonstructural Stormwater Management Alternatives
a. Minimize earth disturbance
b. Minimize impervious surfaces
c. Break up large impervious surfaces.
6.
Satisfy infiltration objective (Section 305) and provide for stormwater pretreatment
prior to infiltration. Pretreatment may not be necessary for rooftop runoff which
enters the infiltration facility directly from a roof leader (rain spout/drain).
7.
Satisfy water quality (Section 306) and streambank erosion protection objective
(Section 307).
Determine what Management District the site falls into (Appendix D) and conduct an
existing conditions runoff analysis.
9.
Prepare final project design to maintain existing conditions drainage areas and
discharge points, to minimize earth disturbance and impervious surfaces, and to the
maximum extent possible, to ensure the remaining site development has no surface or
point discharge.
10.
Conduct a proposed condition runoff analysis based on the final design and to meet
the release rate and in turn the overbank flow and extreme event requirements
(Section 308).
11.
detention, bioretention, direct discharge or other structural control.
Section 305. Ground Water Recharge (Infiltration/Recharge/Bioretention)
Design of the infiltration stormwater management facilities shall give consideration to providing
ground water recharge to compensate for the reduction in the percolation that occurs when the
ground surface is disturbed or impervious surface is created. It is recommended that roof runoff be
directed to infiltration BMPs which can be over-designed to compensate for the infiltration
requirements of the parking areas. However, the runoff from the parking lot would still be required
to meet the water quality provisions of this ordinance, Section 306. These measures are required to
be consistent with Section 103, and take advantage of utilizing any existing recharge areas.
Infiltration may not be feasible on every site due to site-specific limitations such as soil type. If it
cannot be physically accomplished, due to seasonal high water table, soil permeability rate, soil depth
or setback distances from special geologic features, then the design professional shall be responsible
to show that this cannot be physically accomplished. If it can be physically accomplished, then the
volume of runoff to be infiltrated shall be determined from Sections 305.A.3 depending on
demonstrated site conditions and shall be the greater of the two volumes.
A. Infiltration BMPs shall meet the following minimum requirements:
1. Infiltration Requirements:
19

a.
Regulated activities will be required to infiltrate, where site conditions permit, a portion
of the runoff created by the development as part of an overall stormwater management
plan designed for the site. The volume of runoff to be infiltrated shall be determined
from Sections 305.A.3.a. or 305.A.3.b, depending upon demonstrated site conditions.
2. Infiltration BMPs intended to receive runoff from developed areas shall be selected based on
suitability of soils and site conditions and shall be constructed on soils that have the
following characteristics:
a.
A minimum depth of 24 inches between the bottom of the BMP and the limiting zone.
b.
An infiltration and/or percolation rate sufficient to accept the additional stormwater
load and drain completely as determined by field tests conducted by the Applicant's
design professional.
The infiltration facility shall be capable of completely infiltrating the required retention
(infiltration) volume within 4 days (96 hours).
d.
Pretreatment shall be provided prior to infiltration.
3. The size of the infiltration facility shall be based upon the following volume criteria:
a.
NRCS Curve Number equation.
The NRCS runoff equation shall be utilized to calculate infiltration requirements (I) in
inches.
I (Infiltration requirement, in inches) = (200 / CN) - 2
Eqn: 305.1
where:
CN = SCS (NRCS) curve number of existing conditions contributing to the infiltration
facility.
determined from Figure 305.1.
20

Required Infiltration (U) in inches by NRCS CN
Infiltration Requirement (l) (in)
3.5
2.5
1.5
0.5
40
60
65
45
50
55
70
75
80
85
90
95
100
SCS Curve Number (CN)
Figure 305.1. Infiltration requirement based upon NRCS Curve Number.
The retention (infiltration) volume (Rev) required to meet the infiltration requirement
would therefore be computed as:
Rev (Cubic Feet) = I * impervious area (square feet) / (12 in/ft)
Eqn: 305.2
Where:
I -- infiltration requirements (in inches)
b. Annual Recharge -- Water Budget Approach
It has been determined that infiltrating 0.46 inches of runoff from the impervious areas
will aid in maintaining the hydrologic regime of the watershed. If the goals of Sections
306.A.2.a cannot be achieved, then 0.46 inches of rainfall shall be infiltrated from all
impervious areas, up to a an existing site conditions curve number of 81. Above a curve
number of 81, Equation 305.1 or the curve in Figure 305.1 should be used to determine
the infiltration requirement.
B. Soils - A detailed soils evaluation of the project site shall be required where practicable to
determine the suitability of infiltration facilities. The evaluation shall be performed by a

qualified design professional, and at a minimum, address soil permeability, depth to bedrock and
subgrade stability. The general process for designing the infiltration BMP shall be:
1. 
Analyze hydrologic soil groups as well as natural and man-made features within the site to
determine general areas of suitability for infiltration practices. In areas where development
on fill material is under consideration, conduct geotechnical investigations of sub-grade
stability; infiltration is not permitted to be ruled out without conducting these tests.
2.
Provide field tests such as double ring infiltrometer or hydraulic conductivity tests (at the
level of the proposed infiltration surface) to determine the appropriate hydraulic
conductivity rate. Percolation tests are not recommended for design purposes.
3.
Design the infiltration structure for the required retention (Rey) volume based on field
determined capacity at the level of the proposed infiltration surface.
4.
If on-lot infiltration structures are proposed by the Applicant's design professional, it must
be demonstrated to the Township of Maidencreek that the soils are conducive to infiltrate on
the lots identified.
C. Carbonate Areas - The Applicant shall investigate non-carbonate areas of the site for the
suitability of infiltration and, if feasible, proceed to undertake infiltration pursuant to Section
305.A. If infiltration in non-carbonate areas is not feasible, the Applicant shall investigate areas
of the site underlain by carbonate bedrock for infiltration purposes. If a suitable area is identified
that meets the requirements of this provision and Table B-5, infiltration shall be conducted in
accordance with the requirements of this ordinance. Only if infiltration proves infeasible in both
carbonate and non-carbonate areas of the site may the applicant be granted a waiver from the
infiltration requirements of the ordinance without structural BMP's.
calculated as follows:
Area tributary to the infiltration BMP
*100%
Base Area of the infiltration BMP
The area tributary to the infiltration BMP shall be weighted as follows:
Area Description
Weighting
All disturbed area to be made impervious
100%
All disturbed areas to be made pervious
50%
All undisturbed impervious areas
100%
All undisturbed pervious areas
0%
Soil thickness is to be measured from the bottom of any proposed infiltration BMP. The
effective soil thickness in Table B-5 in Ordinance Appendix B is the measured soil thickness
multiplied by the thickness factor based on soil permeability, as follows:
22

Permeability Range
Thickness Factor
6.0 to 12.0 inches/hr
0.8
2.0 to 6.0 inches / hr
1.0
1.0 to 2.0 inches/hr
1.4
0.75 to 1.0 inches/hr
1.2
0.5 to 0.75 inches/hr
1.0
The design of all facilities over Karst shall include an evaluation of measures to minimize
adverse effects.
D. Stormwater Hotspots -- Following is a list of examples of designated hotspots. If a site is
designated as a hotspot, it has important implications for how stormwater is managed. First and
foremost, untreated stormwater runoff from hotspots shall not be allowed to recharge into
groundwater where it may contaminate water supplies. Therefore, the Rev requirement shall
NOT applied to development sites that fit into the hotspot category (the entire WQv must still be
treated). Second, a greater level of stormwater treatment shall be considered at hotspot sites to
prevent pollutant washoff after construction. EPA's NPDES stormwater program requires some
industrial sites as well as 923 municipalities and other entities to prepare and implement a
stormwater pollution prevention plan.
Examples of Hotspots:
. Vehicle salvage yards and recycling facilities
. Vehicle fueling stations
. Vehicle service and maintenance facilities
: Vehicle and equipment cleaning facilities
• Fleet storage areas (bus, truck, etc.)
: Industrial sites (based on Standard Industrial Codes)
: Marinas (service and maintenance)
• Outdoor liquid container storage
: Outdoor loading/unloading facilities
: Public works storage areas
• Facilities that generate or store hazardous materials
: Commercial container nursery
: Other land uses and activities as designated by an appropriate review authority
The following land uses and activities are not normally considered hotspots:
• Residential streets and rural highways
• Residential development
• Institutional development
: Office developments
: Non-industrial rooftops
• Pervious areas, except golf courses and nurseries (which may need an Integrated Pest
Management (IPM) Plan).
23

While large highways (average daily traffic volume (ADT) greater than 30,000) are not
designated as a stormwater hotspot; however, it is important to ensure that highway stormwater
management plans adequately protect groundwater.
E. Caution shall be exercised where infiltration is proposed in Source Water Protection Areas as
defined by the local Municipality or Water Authority.
F. Infiltration facilities shall be used in conjunction with other innovative or traditional stormwater
control facilities that are found within the PADEP State BMP Manual.
G. Caution shall be exercised where salt or chloride (municipal salt storage) would be a pollutant
since soils do little to filter this pollutant and it may contaminate the groundwater. The qualified
design professional shall evaluate the possibility of groundwater contamination from the
proposed infiltration facility and perform a hydrogeologic justification study if necessary. A
hydrogeologic justification study would entail: Field reconnaissance, in which local geology,
topographic features, local wall characteristics, surface water flows, potential contamination, and
nature of impermeable areas are determined. Data review of collected pertinent information such
as geologic information, hydrologic data concerning both surface and groundwater, and
geophysical data. With the collected data, a hydrologic model may be developed to determine
the extent to which salt or chloride effects the groundwater.
H. The infiltration requirement in High Quality or Exceptional Value waters shall be subject to the
Department's Chapter 93 Antidegradation Regulations.
I. Dependant upon certain landuse or hotspots an impermeable liner will be required in detention
basins where the possibility of groundwater contamination exists. A detailed hydrogeologic
investigation may be required by the Township of Maidencreek.
J. The Township of Maidencreek shall require the Applicant to provide safeguards against
groundwater contamination for land uses that may cause groundwater contamination should
there be a mishap or spill.
K. For projects that disturb one (1) acre or more, unless otherwise specified in the zoning ordinance,
the following setbacks for infiltration facilities shall apply:
100 feet from water supply wells
10 feet downslope or 100 feet upslope from building foundations
50 feet from septic system drainfields
50 feet from a geologic contact with carbonate bedrock, unless a preliminary site
investigation is done in the carbonate bedrock to show the absence of special
geologic features within 50 feet of the proposed infiltration area;
100 feet from the property line unless documentation is provided to show all
setbacks from wells, foundations and drainfields on the neighboring property will
be met.
24

Section 306. Water Quality Requirements
The applicant shall comply with the following water quality requirements of this Article.
A.
Developed areas shall provide adequate storage and treatment facilities necessary to capture
and treat stormwater runoff. The infiltration volume computed under Section 305 may be a
component of the water quality volume if the Applicant chooses to manage both components
in a single facility. If the infiltration volume is less than the water quality volume, the
remaining water quality volume may be captured and treated by methods other than
infiltration BMPs. The required water quality volume (WQv) is the storage capacity needed
to capture and treat a portion of stormwater runoff from the developed areas of the site.
To achieve this goal, the following criterion is established:
The following calculation formula is to be used to determine the water quality storage
volume, (WQv), in acre-feet of storage for the Maiden Creek watershed:
WQv=[(P)(Rv)(A)]/12
Eqn: 306.1
WQv = Water Quality Volume (acre-feet)
P = 1 inch
A =- Total contributing drainage area to the water quality BMP (acres)
Ry = 0.05 + 0.009() where I is the percent of the area that is impervious surface (impervious
area/A)*100)
This volume requirement can be accomplished by the permanent volume of a wet basin or the
detained volume from other BMPs.
Release of water can begin at the start of the storm (i.e., the invert of the water quality orifice
is at the invert of the facility). The design of the facility shall provide for protection from
clogging and unwanted sedimentation.
B.
For areas within defined Special Protection subwatersheds which include Exceptional Value
(EV) and High Quality (HQ) waters, Cold Water Fishery (CWF) the temperature and quality
of water and streams shall be maintained.
C.
To accomplish the above, the Applicant shall use innovative or traditional stormwater control
facilities that are found within the PADEP State BMP Manual.
D.
If a perennial or intermittent stream passes through the site, the applicant shall create a
stream buffer extending a minimum of fifty (50) feet to either side of the top-of-bank of the
channel. The buffer area shall be maintained with appropriate native vegetation (Reference
to Appendix F of Pennsylvania Handbook of Best Management Practices for Developing
Area for plant lists). If the applicable rear or side yard setback is less than fifty (50) feet, the
buffer width may be reduced to twenty-five (25) percent of the setback to a minimum of ten
(10) feet. If an existing buffer is legally prescribed (i.e. deed, covenant, easement, etc.) and it

exceeds the requirements of this Ordinance, the existing buffer shall be maintained. This
does not include lakes or wetlands.
E.
Evidence of any necessary permit(s) for regulated earth disturbance activities from the
appropriate DEP regional office must be provided to the Township of Maidencreek. The
issuance of an NPDES Construction Permit (or permit coverage under the statewide General
Permit satisfies the requirements of subsection 306.A.
Section 307. Streambank Erosion Requirements
In addition to control of the water quality volume, in order to minimize the impact of
stormwater runoff on downstream streambank erosion, the primary requirement is to design a
BMP to detain the proposed condition 2-year, 24-hour design storm to the existing conditions 1-
year peak flow using the SCS Type II distribution. Additionally, provisions shall be made (such
as adding a small orifice at the bottom of the outlet structure) so that the proposed condition 1-
year storm takes a minimum of 24 hours to drain from the facility from a point where the
maximum volume of water from the 1-year storm is captured. (i.e., the maximum water surface
elevation is achieved in the facility). Release of water can begin at the start of the storm (i.e.,
The minimum orifice size in the outlet structure to the BMP shall be a three (3) inch diameter
orifice and a trash rack shall be installed to prevent clogging. On sites with small contributing
drainage areas to this BMP that do not provide enough runoff volume to allow a 24 hour
attenuation with the 3 inch orifice, the calculations shall be submitted showing this condition.
Orifice sizes less than 3 inches can be utilized provided that the design will prevent clogging of
the intake.
Section 308. Stormwater Management Districts
A.
The Maiden Creek Watershed has been divided into stormwater management districts as
shown on the Management District Map in Appendix D.  Corresponding release rate
percentages associated with each Stormwater Management District is provided as well.
In addition to the requirements specified in Table 308.1 below, the groundwater recharge
(Section 305), water quality (Section 306), and streambank erosion control (Section 307),
requirements shall be implemented.
Standards for managing runoff from each subarea in the Maiden Creek Watershed for the
2.33, 10 and 50-year design storms are shown in Table 308.1. Development sites located in
each of the Districts must control proposed condition runoff rates to existing conditions
runoff rates for the design storms in accordance with Table 308.1.
26

TABLE 308.1 - Water Quantity Requirements
Proposed
Management
Existing Condition
Equivalent
Condition Design
District
Design Storm
Release Rate
Storm
2 - year
1 - year
5 - year
5 - year
100 %
Reduce
10 - year
10 - year
100 %
To
25 - year
25 - year
100 %
100 - year
100 - year
100 %
2 - year
1 - year
10 - year
5 - year
75 %
Reduce
B-1
25 - year
10 - year
75 %
To
50 - year
25 - year
75 %
100 - year
100 - year
100 %
2 - year
1 - year
5 - year
2 - year
30 %
Reduce
B-2
25 - year
5 - year
50 %
To
50 - year
10 - year
50 %
100 - year
100 - year
100 %
2 - year
1 - year
5 - year
2- year
30 %
Reduce
B-3
10 - year
5 - year
75 %
To
50 - year
25 - year
75 %
100 - year
100 - year
100 %
2-year
1-year
100%
5-year
5-year
100%
10-year
Reduce
10-year
100%
C*
To
25-year
25-year
100%
50-year
50-year
100%
100-year
100-year
100%
* The minimum performance standard for development sites in District C is that stormwater
management controls must be provided to limit the post-development peak rate of stormwater
runoff to a rate that is equal to or less than the existing peak rate of stormwater runoff. This
minimum performance criteria was set through a policy directive of the Pennsylvania
Department of Environmental Protection. However, in the previous development of the Act
167 Plan, this district was originally established as a conditional no-detention district such
that development sites which could discharge directly to the main channel of the Maiden
Creek and its major tributaries, or indirectly to the main channel through an existing
stormwater drainage system (i.e., storm sewer or open channel) could do so without control
of the post-development peak rate of runoff.

All areas, regardless of the release rate, must still meet the requirements of the groundwater
recharge criteria (Section 305), water quality criteria (Section 306), and streambank erosion
criteria (Section 307).
B.
General - Proposed condition rates of runoff from any regulated activity shall not exceed the
Stormwater Management District Watershed Map (Ordinance Appendix D) and Section 308,
of this Ordinance.
C.
District Boundaries - The boundaries of the Stormwater Management Districts are shown on
an official map that is available for inspection at the municipal office. A copy of the official
map at a reduced scale is included in the Ordinance Appendix D. The exact location of the
Stormwater Management District boundaries as they apply to a given development site shall
be determined by mapping the boundaries using the two-foot topographic contours (or most
accurate data required) provided as part of the Drainage Plan.
D.
Sites Located in More Than One District - For a proposed development site located within
two or more stormwater management district category subareas, the peak discharge rate from
any subarea shall meet the Management District Criteria for which the discharge is located, as
indicated in Section 308. The calculated peak discharges shall apply regardless of whether
the grading plan changes the drainage area by subarea. An exception to the above may be
granted if discharges from multiple subareas recombine in proximity to the discharge site. In
this case, peak discharge in any direction shall follow Management District A criteria
provided that the overall site discharge meets the Management District Criteria for which the
discharge is located.
E.
Off-Site Areas - Off-site areas that drain through a proposed development site are not subject
to release rate criteria when determining allowable peak runoff rates. However, on-site
drainage facilities shall be designed to safely convey off-site flows through the development
site.
F.
Site Areas - Where the site area to be impacted by a proposed development activity differs
significantly from the total site area, only the proposed impact area utilizing stormwater
management measures shall be subject to the Management District Criteria. In other words,
unimpacted areas bypassing the stormwater management facilities would not be subject to
the Management District Criteria.
Section 309. Design Criteria for Stormwater Management and Conveyance BMPs
A.
Applicants may select a combination of runoff control technigues that are most suitable to
control stormwater runoff from the site. All controls shall be subject to approval of the
Township of Maidencreek. The municipal engineer may request specific information on
design and/or operating features of the proposed stormwater controls in order to determine
their suitability and adequacy in terms of the standards of this Section.
B.
The Applicant shall consider the effect of the proposed stormwater management techniques
on any special soil conditions or geological hazards that may exist on the development site. In
the event such conditions are identified on the site, the municipal engineer may require in-
depth studies by a Geotechnical Engineer.
28

C.
Basins and Impoundments: Any BMP that is a dam, as defined in 25 Pa. Code Chapter 105,
shall be designed according to the requirements in those regulations. Any stormwater BMP
that does not constitute a dam under 25 Pa. Code Chapter 105, but is designed to store runoff
and requires a berm or earthen embankment (i.e. detention basin), shall be designed to comply
with the following:
1. Basins with earthen embankments shall be designed with an emergency spillway that has
capacity and stability to accommodate the 100-year post-development hydrograph, in a
manner that will not damage the integrity of the facility and will not create a downstream
hazard. Emergency spillway design shall assume that all other basin outlets are non-
functional. Where practical, the emergency spillway shall be constructed in undisturbed
ground, and locations in fill should be avoided. Regardless of location, appropriate
stabilization measures shall be provided.
2. The height of the embankment shall be designed to provide a minimum 1.0 foot of
freeboard above the maximum elevation computed when the 100-year peak post-
development flow passes through the emergency spillway. Embankment heights shall not
exceed 15 feet, unless approved by the Township of Maidencreek.
3. The minimum top width of earthen embankments shall be equal to three-fourths (3/4) of
the embankment height, but in no case shall the top width be less than eight feet (8').
4. Interior and exterior embankment side slopes shall not be greater than three (3) horizontal
to one (1) vertical.
5. All pipes, conduits, etc. passing through basin embankments shall have properly spaced
concrete anti-seep collars. Minimum collar projection beyond the pipe shall be two feet
(2'), and maximum collar spacing is 14 times the projection. The joint between collar and
pipe shall be watertight.
6. A key trench of relatively impervious material shall be provided within all basin
embankments. The key trench shall be at least two feet (2') deep, or extend down to
stable subgrade, whichever is deeper. Minimum bottom width for key trench shall be four
feet (4'). Maximum side slopes for the key trench shall be one (1) horizontal to one (1)
vertical. A compacted impervious core at least three feet (3') wide at the top, having
maximum side slopes of one (1) horizontal to one (1) vertical shall extend for the full
length of the embankment, and the top elevation shall be set at the 10-year design water
surface elevation.
7. All basins shall be structurally sound and shall be constructed of durable materials. The
completed structure and the foundation of all basins shall be stable under all probable
conditions of operation. Embankments shall be placed in maximum eight-inch (8") lifts to
a minimum of 95 percent of maximum dry density, as established by ASTM D-1557.
Compaction test results shall be provided to the Township of Maidencreek upon request.
Embankments shall be constructed six inches (6") above design elevations to allow for
settlement.

8. All basins not including groundwater recharge and/or water quality storage shall include
an outlet structure to permit draining the basin to a completely dry condition within
twenty-four (24) hours following the end of the design rainfall.
9. All discharge control devices with appurtenances (except discharge pipes) shall be made
of reinforced concrete and stainless or hot dip galvanized steel. Bolts/fasteners and any
orifice plates are to be stainless or galvanized steel.  Outlet barrels/pipes shall have a
minimum diameter of fifteen (15) inches and shall be made of reinforced concrete pipe
with watertight joints, or approved equivalent. Where installation conditions merit,
structural calculations that address the actual design requirements will be required.
10. All basins employing small orifices (i.e., less than six inches diameter or equivalent area),
shall be provided with an apron of concrete or similar durable material which abuts the
orifice invert and extends a minimum of 18 inches in all directions from the orifice, to
prevent potential blockage by vegetative growth or debris, and to allow for easy cleaning
of the area approaching the orifice. Appropriate trash racks are required for all orifice
openings.
11. Low flow channels shall be provided from each water carrying facility to the outlet
structure for all basins that do not include Groundwater Recharge and/or Water Quality
storage. Low flow channels shall be one (1) percent minimum slope and shall be designed
to enable ease of maintenance. All basins that do include Groundwater Recharge and/or
Water Quality storage shall not be required to have a low flow channel.
12. Minimum slope within a basin that does not include Groundwater Recharge and/or Water
Quality storage shall be two (2) percent positive grade to the low flow channel.
13. Design storms for the computation of retention basin volumes shall be based upon a 24-
hour storm with 100 year return period (SCS Type I storm).
14. The effect on downstream areas if the basin embankment fails shall be considered in the
design of all basins. The basin shall be designed to minimize the potential damage caused
by such failure of the embankment.
15. All structures (detention basins, cisterns, etc.), other than those used for Groundwater
Recharge Volume and Water Quality Volume, must completely drain within 24 hours
after the end of the design storm.
16. Soils used for the construction of basins shall have low erodibility factors (K" factors).
17. Minimum floor elevations for all structures that would be affected by a basin, other
temporary impoundments, or open conveyance systems where ponding may occur shall be
two (2) feet above the 100-year water surface. If basement or underground facilities are
proposed, detailed calculations addressing the effects of stormwater ponding on the
structure and water-proofing and/or flood-proofing design information shall be submitted
for approval.
30

D.
Stormwater Collection and Conveyance Systems: Gutters, inlets, pipes, conduits, swales,
ditches and any other means for collecting and/or conveying stormwater shall be designed to
comply with the following:
1. All storm sewer pipes, culverts and bridges (excluding detention and retention basin
outfall structures), gutters and swales conveying water originating only from within the
boundaries of the development site shall be designed for a twenty-five (25) year storm
event. All storm sewer pipes, culverts and bridges (excluding detention and retention
basin outfall structures) conveying water originating from off-site shall be designed for a
fifty (50) year storm event. Facilities that convey runoff to stormwater management
facilities (e.g., detention basins, etc.) shall be designed for the 100-year storm event,
unless adequate alternate means for conveying 100-year flow to the facilities are provided.
Drainage easements having widths no less than 20 feet shall be provided to contain and
convey the 100-year frequency flood throughout the development site. Easements shall
begin at the furthest upstream property line of the proposed development site in a
watershed.
2. Water obstructions shall convey runoff from the 25-year design storm with a minimum of
2.0 feet of freeboard measured below the lowest point along the top of the roadway,
without damage to the drainage structure or the roadway, unless more restrictive local,
state and/or federal regulations apply. A concentrated discharge of stormwater to an
adjacent property shall be within an existing watercourse or otherwise an easement and
appropriate agreements shall be required.
3. Storm sewer pipes other than those used as roof drains, detention basin underdrains, and
street subbase underdrains, shall have a minimum diameter of fifteen (15) inches and be
either Class III reinforced concrete pipe (RCP) or smooth-lined corrugated high-density
polyethylene pipe (HDPE). Corrugated metal pipe is not permitted. HDPE pipe joints
shall be silt-tight at a minimum (e.g., ADS N-12 ST/IB, or equal), and RCP joints shall
have pre-lubed O-ring gaskets. Water-tight specification is required in areas of carbonate
geology and elsewhere as may be specified by the municipality. Where installation
conditions merit (e.g., deep fills), structural calculations that address the actual design
requirements will be required.
4. Storm sewer pipes and culverts shall be installed on sufficient slopes to provide a
minimum velocity of three (3) feet per second when flowing full.
5. Storm sewers shall be placed within in the cartway of curbed streets and parallel to the
road shoulders of streets without curbs. At curbed street intersections, inlets shall be
placed on the tangent and not on the curved portion of the curbing. Storm sewer crossings
of streets shall be perpendicular to the street centerline to the maximum extent practicable.
6. Storm facilities not located within a public right-of-way shall be contained in and centered
within an easement not less than 20 feet wide. Easements shall follow property boundaries
where possible.
7. Manning “n" values used for design of pipes and culverts shall be in accordance with
generally accepted engineering practice. Adequate documentation shall be provided in
support of the chosen values.
31

8. All storm sewer pipe and culverts shall have a minimum cover of 18 inches. Embedment
for all storm sewer pipe and culverts shall consist of AASHTO No. 8 (1B) aggregate from
a minimum of six (6) inches of bedding beneath the pipe, to a minimum of 12 inches over
the pipe. Aggregate requirements for street construction shall take precedence over the 1B
specification, but in no case shall total aggregate cover over the pipe be less than 12
inches. Compaction shall be in conformance with manufacturer's specifications. Select
backfill shall complete the trench to pavement subgrade or topsoil layer in grassed areas.
9. Curves, tees, elbows and wyes are not permitted in pipes other than those used as roof
drains, detention basin underdrains, and street subbase underdrains. Manholes or inlets
are required to facilitate such configurations.
10. Manholes and inlets shall not be spaced more than 400 feet apart for pipes with diameters
of 24 inches and less, and not more than 500 feet apart for pipes of greater diameter.
Ladder rungs shall be placed in manholes and inlets with depths exceeding five feet (5').
11. When there is a change in the pipe size in a manhole or inlet, the elevations of the top of
the pipes shall be the same, or the smaller pipe(s) higher. A minimum drop of one-tenth
foot (O.1') shall be provided from the inlet invert elevation(s) to the outlet invert elevation.
12. Manholes, inlets, headwalls, endwalls and end sections proposed for dedication or located
along streets or subject to vehicular traffic, shall conform to the requirements of
PennDOT, or to specifications as otherwise modified by the Township of Maidencreek.
Manhole covers shall have the word "STORM"' cast clearly on the lid.
13. Inlets along curbed streets shall be spaced to limit depth along the curb to a maximum of
three inches (3") during a 10-year storm. Inlet capacities and by-pass calculations shall be
determined by PennDOT design techniques.
14. Pipe underdrains and/or pavement base drains shall be provided in areas known or
otherwise documented to have a seasonal high water table, and as directed by the
Township of Maidencreek Engineer.
15. Appropriate headwalls, endwalls or end sections shall be used where stormwater runoff
enters or leaves the storm sewer horizontally from a natural or manmade channel. Such
facilities shall conform to the requirements of PennDOT, or to specifications as otherwise
modified by the Township of Maidencreek.
16. Adequate erosion and sediment control protection shall be provided along all open
channels, and at all points of discharge.
17. Stormwater roof drains, sump pumps, and pipes shall not directly discharge water into a
street right-of-way or discharge into a sanitary sewer or storm sewer.
18. All existing and natural watercourses, channels, drainage systems, wetlands and areas of
surface water concentration shall be maintained in their existing condition unless an
32

alteration is approved by the Township of Maidencreek and any other necessary approving
body.
19. Flow velocities from any storm sewer may not result in erosion of the receiving channel.
20. Energy dissipaters shall be placed at the outlets of all storm sewer pipes, culverts, and
bridges where flow velocities exceed maximum permitted channel velocities as specified
in the PADEP Erosion and Sediment Pollution Control Manual, as amended.
21. The following conditions shall be met for all swales:
a. Capacities and velocities shall be computed using the Manning equation. Stabilization
(i.e., linings, etc.) shall be as specified in the PADEP Erosion and Sediment Pollution
Control Manual, as amended.
b. All vegetated swales shall have a minimum slope of one (1) percent unless approved
by the municipality.
c. “n"' factors shall be based upon accepted engineering design practices as approved by
the Municipality.
d. All swales shall be designed to concentrate low flows to minimize siltation and
meandering.
Section 310. Calculation Methodology
A.
Stormwater runoff from all development sites with a drainage area of greater than 200 acres
shall be calculated using a generally accepted calculation technique that is based on the
methods and the method selected by the design professional shall be based on the individual
limitations and suitability of each method for a particular site.  The Township of
Maidencreek may allow the use of the Rational Method to estimate peak discharges from
drainage areas that contain less than 200 acres. The Soil Complex Method shall be used for
drainage areas greater than 200 acres.
33

TABLE 310-1
Acceptable Computation Methodologies For
Stormwater Management Plans
METHOD
METHOD DEVELOPED BY
APPLICABILITY
TR-20
USDA NRCS
Applicable where use of full
(or commercial computer
hydrology computer model is
package based on TR-20)
desirable or necessary.
TR-55
USDA NRCS
Applicable for land development
(or commercial computer
plans within limitations described
package based on TR-55)
in TR-55.
HEC-1 / HEC-HMS
US Army Corps of Engineers
Applicable where use of full
hydrologic computer model is
desirable or necessary.
PSRM
Penn State University
Applicable where use of a
hydrologic computer model is
desirable or necessary; simpler
than TR-20 or HEC-1.
Rational Method
Emil Kuichling(1889)
For sites less than 200 acres and
or commercial computer
with time of concentration less
package based on Rational
than 60 minutes (tc< 60 min), 0r
Method)
as approved by the Municipality
Other Methods
Varies
Other computation methodologies
approved by the. Municipality
* Note: Successors to the above methods are also acceptable. These successors include
WINNTR55 for TR55 and WINTR20 for TR20 and SWMM.
All calculations consistent with this Ordinance using the soil cover complex method shall use
the appropriate design rainfall depths for the various return period storms according to the
region in which they are located as presented in Table B-1 in Appendix B of this Ordinance.
If a hydrologic computer model such as PSRM or HEC-1 / HEC-HMS is used for stormwater
runoff calculations, then the duration of rainfall shall be 24 hours. The SCS 'S' curve shown
in Figure B-1, Appendix B of this Ordinance shall be used for the rainfall distribution.
C.
For the purposes of existing conditions flow rate determination, undeveloped land shall be
considered as "meadow" in good condition, unless the natural ground cover generates a lower
curve number or Rational 'C' value (i.e., forest), as listed in Table B-2 or B-3 in Appendix B
of this Ordinance.
D.
All calculations using the Rational Method shall use rainfall intensities consistent with
Storm Curves from PA Department of Transportation Design Rainfall Curves (1986) and
NOAA Atlas 14 (Figures B-2 to B-3). Times-of-concentration for overland flow shall be
calculated using the methodology presented in Chapter 3 of Urban Hydrology for Small
Watersheds, NRCS, TR-55 (as amended or replaced from time to time by NRCS). Times-of-
concentration for channel and pipe flow shall be computed using Manning's equation. NRCS
lag equation divided by 0.6 as acceptable method for Tc in undeveloped areas.
34

E.
Runoff Curve Numbers (CN) for both existing and proposed conditions to be used in the soil
cover complex method shall be obtained from Table B-2 in Appendix B of this Ordinance.
F.
Runoff coefficients (C) for both existing and proposed conditions for use in the Rational
method shall be obtained from Table B-3 in Appendix B of this Ordinance.
G.
Where uniform flow is anticipated, the Manning equation shall be used for hydraulic
computations, and to determine the capacity of open channels, pipes, and storm sewers.
Values for Manning's roughness coefficient (n) shall be consistent with Table B-4 in
Appendix B of the Ordinance. Full flow shall be assumed for closed conduits.
Outlet structures for stormwater management facilities shall be designed to meet the
performance standards of this Ordinance using any generally accepted hydraulic analysis
technique or method.
The design of any stormwater detention facilities intended to meet the performance standards
of this Ordinance shall be verified by routing the design storm hydrograph through these
facilities using the Storage-Indication Method. For drainage areas greater than 200 acres in
size, the design storm hydrograph shall be computed using a calculation method that
produces a full hydrograph (i.e. TR-20, TR-55, HEC-1, PSRM). The municipality may
use a total runoff volume that is consistent with the volume from a method that produces a
full hydrograph.
Section 311. Other Requirements
A.
All wet basin designs shall incorporate biologic minimization controls consistent with the
West Nile Guidance found in Appendix G.
B.
Any facilities that constitute water obstructions (e.g., culverts, bridges, outfalls, or stream
enclosures), water encroachnents, and any work involving wetlands governed by PaDEP
Chapter 105 regulations (as amended or replaced from time to time by PaDEP), are subject to
PaDEP Chapter 105 regulations.
C.
Adequate erosion protection shall be provided along all open channels, and at all points of
discharge (DEP erosion and Erosion, Sediment and Pollution Control Manual).
D.
The Township of Maidencreek reserves the right to disapprove any design that would result
in the construction in or continuation of a stormwater problem area.
E.
No stormwater detention facility shall be placed within fifty (50) feet of a special geologic
feature. No subsurface stormwater conveyance facility shall be constructed within fifty (50)
feet of a special geologic feature, unless it is constructed of durable pipe utilizing watertight
joints.
ARTICLE IV-DRAINAGE PLAN REQUIREMENTS
Section 401. General Requirements

For any of the activities regulated by this Ordinance, the preliminary or final approval of subdivision
and/or land development plans, the issuance of any building or occupancy permit, or the
commencement of any earth disturbance activity may not proceed until the Property Owner or
Applicant or his/her agent has received written approval of a Drainage Plan from the Township of
Maidencreek unless the project qualifies for an exemption from the requirements to submit a
Drainage Plan.
Section 402. Exemptions
A. General Exemptions
The following land use activities are exempt from the drainage plan submission requirements of
this ordinance.
1. Use of land for gardening for home consumption.
2. Agricultural plowing and. tilling are exempt from the rate control and stormwater
management site plan preparation requirements of this ordinance provided the activities
are performed according to the requirements of 25 PA Code, Chapter 102.
3. Forest Management and timber operations are exempt from the rate control and
stormwater management site plan preparation requirements of this ordinance provided the
activities are performed according to the requirements of 25 PA Code, Chapter 102.
B.Stormwater Quantity Control Exemption
Any Regulated Activity that meets the impervious area exemption criteria in Table 402-1 shall
not be required to implement the stormwater quantity controls, specified in Section 308 of this
Ordinance. These criteria shall apply to the total development even if development is to take
place in phases. The date of the municipal Ordinance adoption shall be the starting point from
which to. consider tracts as “parent tracts" in which future subdivisions and respective
impervious area computations shall be cumulatively considered. Impervious areas existing on
the "parent tract" prior to adoption of this Ordinance shall not be considered in cumulative
impervious area calculations for exemption purposes.
TABLE 402-1
Impervious Area Exemption Criteria
Total Parcel
Impervious Area
Size
Exemption (sq.ft.)
0 to <0.125 ac
1,000 sq. ft.
0.125 to <0.5 ac
2,500 sq. ft.
0.5 to <1 ac
5,000 sq. ft.
1 to <2 ac
7,500 sq. ft.
2 to <3 ac
10,000 sq. ft.
3 to <4 ac
12,500 sq. ft.
≥4 ac
15,000 sq. ft.
36

Submissions for projects that utilize the exemption under section 402.B shall reference
Ordinance Appendix H to meet the requirements of groundwater recharge (Section 305), water
quality (Section 306), and streambank erosion (Section 307) controls of this Ordinance.
Drainage plans in accordance with Sections 403 A.2, 403 B.7, 8, 11, 15, and 22 and 403.D.2.
must still be submitted. Any exemption must first be approved by the Township of Maidencreek.
C. Additional Exemption Requirement:
1. Exemption does not relieve the Applicant from the responsibility to secure required permits
or approvals for activities regulated by any other applicable code, rule, act, or ordinance.
Nor does exemption relieve the Applicant from meeting the water quality requirements of
this Ordinance.
2. Exemption responsibilities - An exemption shall not relieve the Applicant from
implementing such measures as are necessary to protect the public health, safety, and
property. An exemption shall not relieve the Applicant from providing adequate stormwater
management for Regulated Activities to meet the purpose of this Ordinance; however,
drainage plans will not have to be submitted to the municipality.
3. HQ and EV streams - This exemption shall not relieve the Applicant from meeting the
special requirements for watersheds draining to high quality (HQ) or exceptional value (EV)
waters, identified and Source Water Protection Areas (SWPA) and requirements for
nonstructural project design sequencing (Section 304), groundwater recharge (Section 305),
water quality (Section 306), and streambank erosion (Section 307). The volume and rate of
the net increase in stormwater runoff from Regulated Activities must be managed to prevent
the physical degradation of receiving waters from such effects as scour and streambank
destabilization, to satisfy State Water Quality Requirements;
All regulated activities occurring in drainage areas tributary to waters designated HQ/EV
pursuant to 25 PA Code, Chapter 93, shall not change any biological, chemical, or physical
characteristics, including volume, rate, velocity, course, current, cross section, or temperature
of the waters, unless the activity is specifically permitted in accordance with the
environmental laws of the Commonwealth.
4. Drainage Problems - If a drainage problem is documented or known to exist downstream of,
or expected from the proposed activity, then the municipality may require a drainage plan
submittal.
5. Subdivision plans for three lots or fewer are exempt from the requirement to submit a
Drainage Plan at the time of the subdivision; however, development of the individual lots
created by the subdivision is subject to all other provisions of this Ordinance.
Section 403. Drainage Plan Contents
The Drainage Plan shall consist of a general description of the project including sequencing items
described in Section 304, calculations, maps and plans. A note on the maps shall refer to the
associated computations and erosion and sediment control plan by title and date. The cover sheet of
the computations and erosion and sediment control plan shall refer to the associated maps by title
37

and date. All Drainage Plan materials shall be submitted to the Township of Maidencreek in a
format that is clear, concise, legible, neat, and well organized; otherwise, the Drainage Plan shall not
be accepted for review and shall be returned to the Applicant.
The following items shall be included in the Drainage Plan:
A.
General
1. General description of the project including those areas described in Section 304.
2. General description of permanent stormwater management techniques, including
construction specifications of the materials to be used for stormwater management
facilities.
3. Complete hydrologic, hydraulic, and structural computations for all stormwater
management facilities.
4. An Erosion and Sediment Control Plan, including all reviews and approvals by the
Conservation District.
5. A general description of nonpoint source pollution controls.
B.
Maps
Map(s) of the project area shall be submitted on 24-inch x 36-inch sheets and/or shall be
prepared in a form that meets the requirements for recording at the offices of the Recorder of
Deeds of Berks County. If the Subdivision and Land Developmnent Ordinance (SALDO) has
more stringent criteria then the more stringent criteria shall apply. The contents of the
map(s) shall include, but not be limited to:
1. The location of the project relative to highways, municipalities or other identifiable
landmarks.
2.
Existing contours at intervals of two feet. In areas of steep slopes (greater than 15
percent), five-foot contour intervals may be used.
3.
Existing streams, lakes, ponds or other Waters of the Commonwealth within the project
area..
4.
Other physical features including flood hazard boundaries, stream buffers, existing
drainage courses, areas of natural vegetation to be preserved, and the total extent of the
upstream area draining through the site.
5.
The locations of all existing and proposed utilities, sanitary sewers, and water lines
within fifty (50) feet of property lines.
6.
An overlay showing soil names and boundaries.
7.
Limits of earth disturbance, including the type and amount of impervious area that
would be added.
8.
 Proposed structures, roads, paved areas, and buildings.
38

9. Final contours at intervals of two feet. In areas of steep slopes (greater than 15 percent),
five-foot contour intervals may be used.
10. The name of the development, the name and address of the owner of the property, and
the name of the individual or firm preparing the plan.
11. The date of submission.
12. A graphic and written scale of one (1) inch equals no more than fifty (50) feet; for tracts
of twenty (20) acres or more, the scale shall be one (1) inch equals no more than one
hundred (100) feet.
13. A north arrow.
14. The total tract boundary and size with distances marked to the nearest foot and bearings
to the nearest degree.
15. Existing and proposed land use(s).
16. A key map showing all existing man-made features beyond the property boundary that
would be affected by the project.
17. Location of all open channels.
18. Overland drainage patterns and swales.
19. A twenty (20) foot wide access easement around all stormwater management facilities
that would provide ingress to and egress from a public right-of-way.
20. The location of all erosion and sediment control facilities.
21. A note on the plan indicating the location and responsibility for maintenance of
stormwater management facilities that would be located on/off-site. All on/off-site
facilities shall meet the performance standards and design criteria specified in this
Ordinance.
22. A statement, signed by the landowner, acknowledging that any revision to the approved
Drainage Plan must be approved by the Township of Maidencreek and the Conservation
District.
23. The following signature block for the Design Engineer:
"I, (Design Engineer), on this date (date of signature), hereby certify that the Drainage
Plan meets all design standards and criteria of the Maiden Creek Watershed Act 167
Stormwater Management Ordinance."
C.
Supplemental Information
1. A written description of the following information shall be submitted.
a.
The overall stormwater management concept for the project designed in
accordance with Section 304.
b.
Stormwater runoff computations as specified in this Ordinance.
39

C.
Stormwater management techniques to be applied both during and
after development.
d.
Expected project time schedule.
e.
Development stages (project phases) if so proposed.
Ordinance.
2.
An erosion and sediment control plan.
3.
The effect of the project (in terms of runoff volumes and peak flows) on adjacent
properties and on any existing municipal stormwater collection system that may receive
runoff from the project site.
D.
Stormwater Management Facilities
1.
 All stormwater management facilities must be located on a plan and described in detail.
2.
When infiltration facilities such as seepage pits, beds or trenches are used, the locations
of existing and proposed septic tank infiltration areas and wells must be shown.
3. All calculations, assumptions, and criteria used in the design of the stormwater
management facilities must be shown.
E.
Responsibilities for Operations and Maintenance of Stormwater Controls and BMPs
1. No Regulated Earth Disturbance activities within the Township of Maidencreek shall
commence until approval by the Township of Maidencreek of a Stormwater Control and
BMP Operations and Maintenance plan which describes how the permanent (e.g., post-
construction) stormwater controls and BMPs will be properly operated and maintained.
2.
The following items shall be included in the Stormwater Control and BMP Operations
and Maintenance Plan:
a.
Map(s) of the project area, in a form that meets the requirements for recording at
the offices of the Recorder of Deeds of Berks County, and shall be submitted on
24-inch x 36-inch sheets. The contents of the maps(s) shall include, but not be
limited to:
1).
Clear identification of the location and nature of permanent stormwater
controls and BMPs,
2).
The location of the project site relative to highways, municipal boundaries
or other identifiable landmarks,
3).
Existing and final contours at intervals of two feet, or others as appropriate,
4).
Existing streams, lakes, ponds, or other bodies of water within the project
site area,
5).
Other physical features including flood hazard boundaries, sinkholes,
streams, existing drainage courses, and areas of natural vegetation to be
preserved,
The locations of all existing and proposed utilities, sanitary sewers, and
water lines within fifty (50) feet of property lines of the project site,.
40

7).
Proposed final changes to the land surface and vegetative cover, including
the type and amount of impervious area that would be added,
8).
Proposed final structures, roads, paved areas, and buildings, and
9).
A twenty (20) foot wide access easement around all stormwater controls and
BMPs that would provide ingress to and egress from a public right-of-way.
b.
A description of how each permanent stormwater control and BMP will be
operated and maintained, and the identity of the person(s) responsible for
operations and maintenance,
The name of the project site, the name and address of the owner of the property,
and the name of the individual or firm preparing the plan, and
d.
A statement, signed by the landowner, acknowledging that the stormwater
controls and BMPs are fixtures that can be altered or removed only after approval
by the Township of Maidencreek.
3.
The Stormwater Control and BMP Operations and Maintenance Plan for the project site
shall establish responsibilities for the continuing operation and maintenance of all
permanent stormwater controls and BMPs, as follows:
a.
If a plan includes structures or lots which are to be separately owned and in which
streets, sewers and other public improvements are to be dedicated to the
Township of Maidencreek, stormwater controls and BMPs may also be dedicated
to and maintained by the Township of Maidencreek;
b.
If a plan includes operations and maintenance by a single ownership, or if sewers
and other public improvements are to be privately owned and maintained, then the
operation and maintenance of stormwater controls and BMPs shall be the
responsibility of the owner or private management entity.
4.
The Township of Maidencreek shall make the final determination on the continuing
operations and maintenance responsibilities. The Township of Maidencreek reserves
the right to accept or reject the operations and maintenance responsibility for any or all
of the stormwater controls and BMPs.
F.
Municipality Review of Stormwater Control and BMP Operations and Maintenance Plan
1.
The Township of Maidencreek shall review the Stormwater Control and BMP
Operations and Maintenance Plan for consistency with the purposes and requirements
of this ordinance, and any permits issued by DEP.
2.
The Township of Maidencreek shall notify the Applicant in writing whether the
Stormwater Control and BMP Operations and Maintenance Plan is approved.
3.
The Township of Maidencreek may require a "Record Drawing" of all stormwater controls and
BMPs, and an explanation of any discrepancies with the Operations and Maintenance Plan.
41

Section 404. Plan Submission
The Township of Maidencreek shall require receipt of a complete plan, as specified in this
Ordinance.
For any activities that require an NPDES Permit for Stormwater Discharges from Construction
Activities, a PaDEP Joint Permit Application, a PennDOT Highway Occupancy Permit, or any other
permit under applicable state or federal regulations are regulated under Chapter 105 (Dam Safety
and Waterway Management) or Chapter 106 (Floodplain Management) of PaDEP's Rules and
Regulations, or, the proof of application for said permit(s) or approvals shall be part of the plan. The
plan shall be coordinated with the state and federal permit process and the municipal SALDO review
process.
A.
For projects which require SALDO approval, the Drainage Plan shall be submitted by the
Applicant as part of the Preliminary Plan submission where applicable for the Regulated
Activity.
B.
For these regulated activities that do not require SALDO approval, See Section 401, General
Requirements.
C.
Six (6) copies of the Drainage Plan shall be submitted and distributed as follows:
1. Two (2) copies to the Township of Maidencreek accompanied by the requisite
Municipal Review Fee, as specified in this Ordinance.
2.
Two (2) copies to the Conservation District.
3.
One (1) copy to the Municipal Engineer.
4.
One (1) copy to the Berks County Planning Commission.
Section 405. Drainage Plan Review
A.
The Township of Maidencreek shall review the Drainage Plan for consistency with the
adopted Maiden Creek Watershed Act 167 Stormwater Management Plan. Any found
incomplete shall not be accepted for review and shall be returned to the Applicant.
B.
For activities regulated by this Ordinance, the Township of Maidencreek shall notify the
Applicant in writing, within (recommend 90) calendar days, whether the Drainage Plan is
consistent with the Stormwater Management Plan.
1. Should the Drainage Plan be determined to be consistent with the Stormwater
Management Plan, the Municipal Engineer shall forward an approval letter to the
Municipal Secretary who will then forward a copy to the Applicant.
2.
Should the Drainage Plan be determined to be inconsistent with the Stormwater
Management Plan, the Municipal Engineer shall forward a disapproval letter to the
Municipal Secretary who will then forward a copy to the Applicant. The disapproval
letter shall cite the reason(s) and specific Ordinance sections for the disapproval.
42

Disapproval may be due to inadequate information to make a reasonable judgment as to
compliance with the stormwater management plan. Any disapproved Drainage Plans
may be revised by the Applicant and resubmitted consistent with this Ordinance.
C.
For Regulated Activities specified in Section 104 of this Ordinance, which require a building
permit, the Municipal Engineer shall notify the Municipal Building Permit Officer in writing,
within a time frame consistent with the Municipal Building Code and/or Municipal
Subdivision Ordinance, whether the Drainage Plan is consistent with the Stormwater
Management Plan and forward a copy of the approval/disapproval letter to the Applicant.
Any disapproved drainage plan may be revised by the Applicant and resubmitted consistent
with this Ordinance.
D.
For regulated activities under this ordinance that require an NPDES Permit Application, the
Applicant shall forward a copy of the Municipal Engineer's letter stating that the Drainage
Plan is consistent with the stormwater management plan to the Conservation District. PaDEP
and the Conservation District may consider the Municipal Engineer's review comments in
determining whether to issue a permit.
E.
The Township of Maidencreek shall not grant approval or grant preliminary approval to any
subdivision or land development for Regulated Activities specified in Section 105 of this
Ordinance if the Drainage Plan has been found to be inconsistent with the Stormwater
Management Plan, as determined by the Township of Maidencreek. All required permits
from PaDEP must be obtained prior to approval of any subdivision or land development.
F.
The Applicant shall be responsible for completing record drawings of all stormwater
management facilities included in the approved Drainage Plan. The record drawings and an
explanation of any discrepancies with the design plans shall be submitted to the Township of
Maidencreek for final approval. The Township of Maidencreek may withhold approval of
the record drawings until the Township of Maidencreek receives a copy of an approved
Highway Occupancy Permit from the PennDOT District Office, NPDES Permit, and any
other applicable permits or approvals, from PaDEP or the Conservation District. The above
permits and approvals must be based on the record drawings.
G.
The Township of Maidencreek's approval of a Drainage Plan shall be valid for a period not to
exceed 5 years. Commencing on the date that the Township of Maidencreek signs the
approved Drainage Plan. If stormwater management facilities included in the approved
Drainage plan have not been constructed, or if constructed, and record drawings of these
facilities have not been approved within this 5 year time period, then the Township of
Maidencreek may consider the Drainage plan disapproved and may revoke any and all
permits. Drainage Plans that are considered disapproved by the Township of Maidencreek
shall be resubmitted in accordance with Section 407 of this Ordinance.
H.
For municipalities located in the Lehigh County portion of the watershed, the Drainage Plan
must: be submitted to the Lehigh Planning Commission (LVPC) for review. 
The
municipalities shall take the LVPC's comments into consideration.

Section 406. Modification of Plans
A.
A modification to a Drainage Plan under review by the Township of Maidencreek for a
development site that involves a change in stormwater management facilities or techniques,
or that involves the relocation or re-design of stormwater management facilities, or that is
necessary because soil or other conditions are not as stated on the Drainage Plan as
determined by the Township of Maidencreek, shall require a resubmission of the modified
Drainage Plan consistent with Section 404 of this Ordinance and be subject to review as
specified in Section 405 of this Ordinance.
A modification to an already approved or disapproved Drainage Plan shall be submitted to
the Township of Maidencreek, accompanied by the applicable Municipal Review and
Inspection Fee. A modification to a Drainage Plan for which a formal action has not been
taken by the Township of Maidencreek shall be submitted to the Municipality, accompanied
by the applicable Municipal Review and Inspection Fee.
Section 407. Resubmission of Disapproved Drainage Plans
A disapproved Drainage Plan may be resubmitted, with the revisions addressing the Township of
Maidencreek's concerns documented in writing and addressed to the Municipal Secretary in
accordance with Section 404 of this Ordinance and distributed accordingly and be subject to review
as specified in Section 405 of this Ordinance. The applicable Municipal Review and Inspection Fee
must accompany a resubmission of a disapproved Drainage Plan.
ARTICLE V-INSPECTIONS
Section 501. Schedule of Inspections
A.
The Township of Maidencreek or their designee shall inspect all phases of the installation of
the permanent stormwater management facilities as deemed appropriate by the Township of
Maidencreek.
B.
During any stage of the work, if the Township of Maidencreek or their designee determines
that the permanent stormwater management facilities are not being installed in accordance
with the approved Stormwater Management Plan, the Township of Maidencreek shall revoke
any existing building permits and issue a cease and desist order until a revised Drainage Plan
is submitted and approved, as specified in this Ordinance.
C.
A final inspection of all stormwater management facilities shall be conducted by the
Township of Maidencreek or their designee and to confirm compliance with the approved
Drainage Plan prior to the issuance of any Occupancy Permit.
44

ARTICLE VI-FEES AND EXPENSES
Section 601. Municipality Drainage Plan Review and Inspection Fee
Fees shall be established by the Township of Maidencreek to defray plan review and construction
inspection costs incurred by the Township of Maidencreek. All fees shall be paid by the Applicant
at the time of Drainage Plan submission. Review and Inspection Fee Schedule shall be established
by resolution of the municipal governing body based on the size of the Regulated Activity and based
on the Township of Maidencreek's costs for reviewing Drainage Plans and conducting inspections
pursuant to Section 501. The Township of Maidencreek shall periodically update the Review and
Inspection Fee Schedule to ensure that review costs are adequately reimbursed.
Section 602. Expenses Covered by Fees
The fees required by this Ordinance shall at a minimum cover:
A.
Administrative costs.
B.
The review of the Drainage Plan by the Township of Maidencreek or its consultant.
C.
The site inspections
D.
The inspection of stormwater management facilities and drainage improvements during
construction.
E.
The final inspection upon completion of the stormwater management facilities and drainage
improvements presented in the Drainage Plan.
F.
Any additional work required to enforce any permit provisions regulated by this Ordinance,
correct violations, and assure proper completion of stipulated remedial actions.
ARTICLE VII-MAINTENANCE RESPONSIBILITIES
Section 701. Performance Guarantee
A.
For subdivisions and land developments the Applicant shall provide a financial guarantee to
the Township of Maidencreek for the timely installation and proper construction of all
stormwater management controls as: 1) Required by the approved drainage plan equal to or
greater than the full construction cost of the required controls or 2) in the amount and method
of payment provided for in the subdivision and land development ordinance.
B.
For other regulated activities, the Township of Maidencreek may require a financial
guarantee from the Applicant.
C.
At the completion of the project, and as a prerequisite for the release of the performance
guarantee, the Applicant or his representatives shall:
45

1. Provide a certification of completion from an engineer, architect, surveyor or other
qualified person verifying that all permanent facilities have been constructed according
to the plans and specifications and approved revisions thereto.
2. Provide a set of record drawings.
D.
After the Township of Maidencreek receives the certification, a final inspection shall be
conducted by the Township of Maidencreek or designee to certify compliance with this
ordinance.
Section 702. Adherence to Approved Stormwater Control and BMP Operations and
Maintenance Plan
It shall be unlawful to alter or remove any permanent stormwater control and BMP required by an
approved Stormwater Control and BMP Operations and Maintenance Plan, or to allow the property
to remain in a condition which does not conform to an approved Stormwater Control and BMP
Operations and Maintenance Plan.
Section 703. Operations and Maintenance Agreement for Privately Owned Stormwater
Controls and BMPs
A.
The property owner shall sign an operations and maintenance agreement with the Township
of Maidencreek covering all stormwater controls and BMPs that are to be privately owned.
The agreement shall be substantially the same as the agreement in Appendix A of this
Ordinance.
B.
Other items may be included in the agreement where determined necessary to guarantee the
satisfactory operation and maintenance of all permanent stormwater controls and BMPs. The
agreement shall be subject to the review and approval of the Township of Maidencreek.
Section 704. Stormwater Management Easements
A.
Stormwater management easements are required for all areas used for off-site stormwater
control, unless a waiver is granted by the Township of Maidencreek.
B.
Stormwater management easements shall be provided by the property owner if necessary for
(1) access for inspections and maintenance, or (2) preservation of stormwater runoff
conveyance, infiltration, and detention areas and other stormwater controls and BMPs, by
persons other than the property owner. The purpose of the easement shall be specified in any
agreement under Section 703.
Section 705. Maintenance Agreement for Privately Owned Stormwater Facilities
A.
Prior to final approval of the site's Drainage Plan, the Applicant shall sign and record the
Maintenance Agreement contained in Appendix A which is attached and made part hereof,
covering all stormwater control facilities that are to be privately owned.

B.
Other items may be included in the agreement where determined necessary to guarantee the
satisfactory maintenance of all facilities. The Maintenance Agreement shall be subject to the
review and approval of the municipal solicitor and governing body.
Section 706. Recording of Approved Stormwater Control and BMP Operations and
Maintenance Plan and Related Agreements
A.
The owner of any land upon which permanent stormwater controls and BMPs will be placed,
constructed or implemented, as described in the Stormwater Control and BMP Operations
and Maintenance Plan, shall record the following documents in the Office of the Recorder of
Deeds for Berks County, within 15 days of approval of the Stormwater Control and BMP
Operations Plan by the Municipality:
The Operations and Maintenance Plan, or a summary thereof,
2.
Operations and Maintenance Agreements under Section 703, and
3.
Easements under Section 704.
B.
The Township of Maidencreek may suspend or revoke any approvals granted for the project
site upon discovery of the failure of the owner to comply with this Section.
Section 707. Municipal Stormwater Control and BMP Operation and Maintenance Fund
A.
Persons installing stormwater controls or BMPs shall be required to pay a specified amount
to the Municipal Stormwater Control and BMP Operation and Maintenance Fund to help
defray costs of periodic inspections and maintenance expenses. The amount of the deposit
shall be determined as follows:
1.
If the stormwater control or BMP is to be privately owned and maintained, the
deposit shall cover the cost of periodic inspections performed by the Township of
Maidencreek for a period of ten (10) years, as estimated by the municipal engineer.
After that period of time, inspections will be performed at the expense of the
Township of Maidencreek.
2.
If the stormwater control or BMP is to be owned and maintained by the Township of
Maidencreek, the deposit shall cover the estimated costs for maintenance and
inspections for ten (10) years. The municipal engineer will establish the estimated
costs utilizing information submitted by the Applicant.
3.
The amount of the deposit to the fund shall be converted to present worth of the
annual series values. The municipal engineer shall determine the present worth
equivalents, which shall be subject to the approval of the governing body.
B.
If a stormwater control or BMP is proposed that also serves as a recreation facility (e.g.
ballfield, lake), the Township of Maidencreek may reduce or waive the amount of the
maintenance fund deposit based upon the value of the land for public recreation purpose.
C.
If at some future time a stormwater control or BMP (whether publicly or privately owned) is
eliminated due to the installation of storm sewers or other storage facility, the unused portion
47

of the maintenance fund deposit will be applied to the cost of abandoning the facility and
connecting to the storm sewer system or other facility. Any amount of the deposit remaining
after the costs of abandonment are paid will be returned to the depositor.
If stormwater controls or BMPs are accepted by the Township of Maidencreek for
dedication, the Township of Maidencreek may require persons installing stormwater controls
or BMPs to pay a specified amount to the Municipal Stormwater Control and BMP Operation
and Maintenance Fund, to help defray costs of operations and maintenance activities. The
amount may be determined as follows:
1.
If the stormwater control or BMP is to be owned and maintained by the Township of
Maidencreek, the amount shall cover the estimated costs for operations and
maintenance for ten (1O) years, as determined by the Township of Maidencreek.
2.
The amount shall then be converted to present worth of the annual series values.
E.
If a stormwater control or BMP is proposed that also serves as a recreation facility (e.g. ball
field, lake), the Township of Maidencreek may adjust the amount due accordingly.
F.
fee to the Municipal Stormwater Maintenance Fund to cover long term maintenance of
stormwater control and best management practices.
G.
Stormwater Related Problems - The Township of Maidencreek may require applicants to pay
a fee to the Municipal Stormwater Maintenance Fund to cover stormwater related problems
which may arise from the land development and earth disturbance
ARTICLE VIII - PROHIBITIONS
Section 80l. Prohibited Discharges and Connections
A.
Any drain or conveyance, whether on the surface or subsurface, which allows any non-
stormwater discharge including sewage, process wastewater, and wash water to enter the
waters of this Commonwealth is prohibited.
B.
No person shall allow, or cause to allow, discharges into surface waters of this
Comimonwealth which are not composed entirely of stormwater, except (1) as provided in
subsection C below, and (2) discharges allowed under a state or federal permit.
C.
The following discharges are authorized unless they are determined to be significant
contributors to pollution to the waters of this Commonwealth:
48

Discharges from fire fighting activities
Flows from riparian habitats and
wetlands
Potable water sources including water
Uncontaminated water from
line flushing
foundations or from footing drains
Irrigation drainage
Lawn watering
Air conditioning condensate
Dechlorinated swimming pool
discharges
Springs
Uncontaminated groundwater
Water from crawl space pumps
Water from individual residential car
washing
Pavement wash waters where spills or
Routine external building wash down
leaks of toxic or hazardous materials
(which does not use detergents or other
have not occurred (unless all spill
compounds)
material has been removed) and where
detergents are not used
D.
In the event that the Township of Maidencreek or DEP determines that any of the discharges
identified in Subsection C, significantly contribute to pollution of the waters of this
Commonwealth, the Township of Maidencreek or DEP will notify the responsible person(s) to
cease the discharge.
Section 802. Roof Drains
Roof drains and sump pumps shall discharge to infiltration or vegetative BMPs and to the maximum
extent practicable satisfy the criteria for Disconnected Impervious Areas.
Section 803. Alteration of Stormwater Management BMPs
No person shall modify, remove, fill, landscape, or alter any stormwater management BMPs,
facilities, areas, or structures, without the written approval of the Township of Maidencreek.
ARTICLE IX-ENFORCEMENT AND PENALTIES
Section 901. Right-of-Entry
A.
Upon presentation of proper credentials, duly authorized representatives of the Township of
Maidencreek may enter at reasonable times upon any property within the Township of
Maidencreek to inspect the implementation, condition, or operation and maintenance of the
stormwater controls or BMPs in regard to any aspect governed by this Ordinance.
B.
Stormwater control and BMP owners and operators shall allow persons working on behalf of
the Township of Maidencreek ready access to all parts of the premises for the purposes of
determining compliance with this Ordinance.
49

C.
Persons working on behalf of the Township of Maidencreek shall have the right to
temporarily locate on any stormwater control or BMP in the Township of Maidencreek such
devices as are necessary to conduct monitoring and/or sampling of the discharges from such
stormwater control or BMP.
D.
Unreasonable delays (>24 hrs.) in allowing the Township of Maidencreek access to a
stormwater control or BMP is a violation of this Article.
Section 902. Public Nuisance
A.
The violation of any provision of this ordinance is hereby deemed a Public Nuisance.
B.
Each day that a violation continues shall constitute a separate violation.
Section 903. Enforcement Generally
A.
Whenever the Township of Maidencreek finds that a person has violated a prohibition or
failed to meet a requirement of this Ordinance, the Township of Maidencreek may order
compliance by written notice to the responsible person. Such notice may require without
limitation:
1.
The performance of monitoring, analyses, and reporting;
2.
The elimination of prohibited connections or discharges;
3.
Cessation of any violating discharges, practices, or operations;
4.
The abatement or remediation of stormwater pollution or contamination hazards and
the restoration of any affected property;
5.
Payment of a fine to cover administrative and remediation costs;
6.
The implementation of stormwater controls and BMPs; and
7.
Operation and maintenance of stormwater controls and BMPs.
B.
Such notification shall set forth the nature of the violation(s) and establish a time limit for
correction of these violations(s). Said notice may further advise that, if applicable, should
the violator fail to take the required action within the established deadline, the work will be
done by the Township of Maidencreek or designee and the expense thereof shall be charged
to the violator.
C.
Failure to comply within the time specified shall also subject such person to the penalty
provisions of this Ordinance. All such penalties shall be deemed cumulative and shall not
prevent the Municipality from pursuing any and all other remedies available in law or equity.
Section 904. Suspension and Revocation of Permits and Approvals
A.
Any building, land development or other permit or approval issued by the Township of
Maidencreek may be suspended or revoked, in whole or in part, by the Township of
Maidencreek for:
50

1.
Non-compliance with or failure to implement any provision of the permit;
2.
A violation of any provision of this Ordinance; or
3.
The creation of any condition or the commission of any act during construction or
development which constitutes or creates a hazard or nuisance, pollution or which
endangers the life or property of others.
B.
A suspended permit or approval may be reinstated by the Township of Maidencreek, in whole
or in part, when:
1.
The Township of Maidencreek or designee has inspected and approved the
corrections to the stormwater controls and BMPs, or the elimination of the hazard or
nuisance, and/or;
2.
The Township of Maidencreek is satisfied that the violation of the Ordinance, law, or
rule and regulation has been corrected.
C.
A permit or approval which has been revoked in whole or in part, by the Township of
procedures outlined in this Ordinance.
Section 905. Penalties
A.
Any violation of the provisions of this Ordinance shall be enforced by action brought before
a District Justice in the same manner provided for the enforcement of summary offenses
under the Pennsylvania Rules of Criminal Procedure. The Municipal Solicitor may assume
charge of the prosecution without the consent of the District Attorney as required by Pa.
R.Crim.P. No. 454 (relating to trial in summary cases). Upon conviction, the person shall be
subject to a fine of not more than One Thousand Dollars ($1,000.00) for each violation,
recoverable with costs, or imprisonment to the extent allowed by law for the punishment of
summary offenses, or both. Each day that the violation continues shall be a separate offense.
B.
In addition, the Township of Maidencreek, through its Solicitor, may institute injunctive,
enforcement of this Ordinance. Any court of competent jurisdiction shall have the right to
issue restraining orders, temporary or permanent injunctions, mandamus or other appropriate
forms of remedy or relief. The imposition of a fine or penalty for any violation of, or non-
compliance with, this Ordinance shall not excuse the violation or non-compliance, or permit
it to continue, and all such persons shall be reguired to correct or remedy such violations and
non-compliances.
Section 906. Notification
In the event that a person fails to comply with the requirements of this Ordinance, or fails to conform
to the requirements of any permit issued hereunder, the Municipality will provide notification of the
violation. After notice is provided, failure to correct violations in a timely manner may result in
additional violations.
51

Section 907. Enforcement
The Township of Maidencreek Board of Supervisors is hereby authorized and directed to enforce all
of the provisions of this ordinance. All inspections regarding compliance with the drainage plan
shall be the responsibility of the municipal engineer or other qualified persons designated by the
Township of Maidencreek.
A.
No person shall modify, remove, fill, landscape or alter any stormwater management BMPs,
facilities, areas, or structures, without the written approval of the Township of Maidencreek.
B.
Upon presentation of proper credentials, the Township of Maidencreek may enter at
condition of the stormwater structures and facilities in regard to any aspect regulated by this
Ordinance.
C.
It shall be unlawful for a person to undertake any Regulated Activity except as provided in an
approved Stormwater Management Site Plan, unless specifically exempted from the
requirement to submit a stormwater management Site Plan by this Ordinance.
The Developer shall be responsible for providing as-built plan of all stormwater management
BMPs included in the approved stormwater management Site Plan. The as-built plans and an
explanation of any discrepancies with the construction plans shall be submitted by the
Developer to the Township of Maidencreek.
E.
The as-built submission shall include a certification of completion signed by a Qualified
Professional verifying that all permanent stormwater management BMPs have been
constructed according to the approved plans and specifications. If any licensed Qualified
Professionals contributed to the construction plans, then a licensed Qualified Professional
must sign the completion certificate.
F.
After receipt of the completion certificate by the Township of Maidencreek, the Township
of Maidencreek may conduct a final inspection.
G.
Inspections regarding compliance with the stormwater management Site Plan are a
responsibility of the Township of Maidencreek.
H.
The Township of Maidencreek may withhold an occupancy permit until a certificate of
completion has been provided by the Developer.
Section 908. Appeals
A.
Any person aggrieved by any action of the Township of Maidencreek or its designee may
appeal to the Maidencreek Township Board of Supervisors within thirty (30) days of that
action.
B.
Any person aggrieved by any decision of the Maidencreek Township Board of Supervisors
may appeal to the County Court of Common Pleas in the County where the activity has taken
place within thirty (30) days of the municipal decision.
52

ENACTED and ORDAINED at a regular meeting of the
on the
of
, 20. This Ordinance
shall take effect immediately.
[Name]
[Title]
[Name]
[Title]
[Name]
[Title]
[Name]
[Title]
[Name]
[Title]
ATTEST:
Secretary
I hereby certify that the foregoing Ordinance was advertised in the
on
, 20, a newspaper of general
circulation in the municipality and was duly enacted and approved as set forth at a regular meeting of
the municipality's governing body held on
, 20
Secretary
53

ORDINANCE APPENDIX A
STORMWATER CONTROLS AND BEST MANAGEMENT
PRACTICES
OPERATIONS AND MAINTENANCE AGREEMENT
THIS AGREEMENT, made and entered into this
day of
, 20, by and
between
, (hereinafter the “Landowner"), and
County, Pennsylvania,
(hereinafter “"Municipality");
WITNESSETH
WHEREAS, the Landowner is the owner of certain real property as recorded by deed in the land
records of
County, Pennsylvania, Deed Book
at Page
, (hereinafter
"Property").
WHEREAS, the Landowner is proceeding to build and develop the Property; and
WHEREAS, the Stormwater Controls and BMP Operations and Maintenance Plan approved
by the Municipality (hereinafter referred to as the “Plan') for the property identified herein, which is
attached hereto as Appendix A and made part hereof, as approved by the Municipality, provides for
management of stormwater within the confines of the Property through the use of Best Management
Practices (BMPs); and
WHEREAS, the Municipality, and the Landowner, his successors and assigns, agree that the
health, safety, and welfare of the residents of the Municipality and the protection and maintenance of
maintained on the Property; and
WHEREAS, for the purposes of this agreement, the following definitions shall apply:
BMP - “Best Management Practice;" activities, facilities, designs, measures or procedures
used to manage stormwater impacts from land development, to protect and maintain water quality and
groundwater recharge and to otherwise meet the purposes of the Municipal Stormwater Management

Ordinance, including but not limited to infiltration trenches, seepage pits, filter strips, bioretention,
wet ponds, permeable paving, rain gardens, grassed swales, forested buffers, sand filters and
detention basins.
Infiltration Trench - A BMP surface structure designed, constructed, and maintained for the
purpose of providing infiltration or recharge of stormwater into the soil and/or groundwater
aquifer,
Seepage Pit - An underground BMP structure designed, constructed, and maintained for the
purpose of providing infiltration or recharge of stormwater into the soil and/or groundwater
aquifer,
Rain Garden - A BMP overlain with appropriate mulch and suitable vegetation designed,
constructed, and maintained for the purpose of providing infiltration or recharge of stormwater
into the soil and/or underground aquifer, and
WHEREAS, the Municipality requires, through the implementation of the Plan, that
stormwater management BMPs as required by said Plan and the Municipal Stormwater Management
Ordinance be constructed and adequately operated and maintained by the Landowner, his successors
and assigns. and
NOW, THEREFORE, in consideration of the foregoing promises, the mutual covenants
contained herein, and the following terms and conditions, the parties hereto agree as follows:
1.
The BMPs shall be constructed by the Landowner in accordance with the plans and
specifications identified in the Plan.
2. 
The Landowner shall operate and maintain the BMP(s) as shown on the Plan in good working
order acceptable to the Municipality and in accordance with the specific maintenance
requirements noted on the Plan.
3. 
The Landowner hereby grants permission to the Municipality, its authorized agents and
employees, to enter upon the property, at reasonable times and upon presentation of proper

identification, to inspect the BMP(s) whenever it deems necessary. Whenever possible, the
Municipality shall notify the Landowner prior to entering the property.
4.
In the event the Landowner fails to operate and maintain the BMP(s) as shown on the Plan in
good working order acceptable to the Municipality, the Municipality or its representatives may
enter upon the Property and take whatever action is deemed necessary to maintain said
BMP(s). This provision shall not be construed to allow the Municipality to erect any
permanent structure on the land of the Landowner. It is expressly understood and agreed that
the Municipality is under no obligation to maintain or repair said facilities, and in no event
shall this Agreement be construed to impose any such obligation on the Municipality.
5.
In the event the Municipality, pursuant to this Agreement, performs work of any nature, or
expends any funds in performance of said work for labor, use of equipment, supplies,
materials, and the like, the Landowner shall reimburse the Municipality for all expenses (direct
and indirect) incurred within 10 days of receipt of invoice from the Municipality.
6.
The intent and purpose of this Agreement is to ensure the proper maintenance of the onsite
BMP(s) by the Landowner; provided, however, that this Agreement shall not be deemed to
create or effect any additional liability of any party for damage alleged to result from or be
caused by stormwater runoff.
7.
The Landowner, its executors, administrators, assigns, and other successors in interests, shall
release the Municipality's employees and designated representatives from all damages,
accidents, casualties, occurrences or claims which might arise or be asserted against said
employees and representatives from the construction, presence, existence, or maintenance of
the BMP(s) by the Landowner or Municipality. In the event that a claim is asserted against the
Municipality, its designated representatives or employees, the Municipality shall promptly
notify the Landowner and the Landowner shall defend, at his own expense, any suit based on
the claim. If any judgment or claims against the Municipality's employees or designated
representatives shall be allowed, the Landowner shall pay all costs and expenses regarding said
judgment or claim.
8.
The Municipality shall inspect the BMP(s) at a minimum of once every three years to ensure
their continued functioning,

This Agreement shall be recorded at the Office of the Recorder of Deeds of
County, Pennsylvania, and shall constitute a covenant running with the Property and/or equitable
servitude, and shall be binding on the Landowner, his administrators, executors, assigns, heirs and any
other successors in interests, in perpetuity.
ATTEST:
WITNESS the following signatures and seals:
(SEAL)
For the Municipality:
(SEAL)
For the Landowner:
ATTEST:
(City, Borough, Township)
County of
, Pennsylvania
I,
, a Notary Public in and for the County and State
aforesaid, whose commission expires on the
day of
, 20, do
hereby certify that
whose name(s) is/are signed to
day of
the foregoing Agreement bearing date of the
, 20_, has
acknowledged the same before me in my said County and State.
GIVEN UNDER MY HAND THIS
day of
200
NOTARY PUBLIC
(SEAL)

ORDINANCE APPENDIX B
STORMWATER MANAGEMENT DESIGN CRITERIA
TABLE B-1
REGION 4 - DESIGN STORM RAINFALL AMOUNT
Source: “Field Manual of Pennsylvania Department of Transportation""
STORM INTENSITY-DURATION-FREQUENCY CHARTS
P D T - I DF May 1986.
FIGURE B-1
NRCS TYPE II RAINFALL DISTRIBUTION - S CURVE
Source: NRCS, TR-55, June 1986
FIGURE B-2
PENNDOT DELINEATED REGIONS
Source: “Field Manual of Pennsylvania Department of Transportation"
STORM INTENSITY-DURATION-FREQUENCY CHARTS
PDT - IDF May 1986.
FIGURE B-3
PENNDOT REGION 4 STORM INTENSITY-DURATION-FREQUENCY CURVE
Source: “Field Manual of Pennsylvania Department of Transportation"
STORM INTENSITY-DURATION-FREQUENCY CHARTS
PD T - I D F May 1986.
TABLE B-2
RUNOFF CURVE NUMBERS
Source: NRCS (SCS) TR-55
TABLE B-3
RATIONAL RUNOFF COEFFICIENTS
TABLE B-4
MANNING ROUGHNESS COEFFICIENTS
TABLE B-5
INFILTRATION REQUIREMENTS IN CARBONATE AREAS

TABLE B-1
DESIGN STORM RAINFALL AMOUNT (INCHES)
The design storm rainfall amount chosen for design should be obtained from the PennDOT region in
which the site is located according to Figure B-2.
Source: “Field Manual of Pennsylvania Department of Transportation"
STORM INTENSITY-DURATION-FREQUENCY CHARTS
P D T -I D F May 1986.
Region 4
Precipitation Depth (in)
Duration
1 Yr
1.5 Yr
2 Yr
5 Yr
10 Yr
25 Yr
50 Yr
100 Yr
5 min
0.30
0.33
0.35
0.41
0.45
0.50
0.55
0.61
15 min
0.58
0.63
0.68
0.80
0.93
1.03
1.13
1.25
1 hr
1.12
1.01
1.22
1.48
1.70
1.91
2.16
2.41
2 hr
1.24
1.37
1.50
1.84
2.14
2.46
2.80
3.18
3 hr
1.38
1.55
1.71
2.10
2.43
2.82
3.24
3.69
6 hr
1.86
1.68
2.04
2.52
3.06
3.60
4.14
4.74
12 hr
2.04
2.28
2.52
3.00
3.84
4.56
5.16
6.00
24 hr
2.40
2.64
2.88
3.60
4.56
5.76
6.48
7.44

Fraction of 24-hr Rainfall
0.0
NRCS (SCS) TYPE II RAINFALL DISTRIBUTION - S CURVE
FIGURE B-1
Time (hrs)

FIGURE B-2
PENNDOT DELINEATED REGIONS
CHESTEN
SCHRILL
LANC
ADTOAD
CUHDEALAND
FAANSLI
ETAE
03040 50 miles
60 80 km
BECFORD,
40
79
:08
008
CRAWFOAD
NERCER
GAEENE

FIGURE B-3
PENNDOT REGION 4 STORM INTENSITY-DURATION-FREQUENCY CURVE
REGION 4
inches /hour
Return
Period,
yeors
100
Rainfoll Intensily,
.8
50
.6
25
10
12
1.5
30
24
60
20
15
10
100
50
25
inches
10
Return Period,
Rainfoll.
yesrs
.8
.6
.3
12
10
1.6
24
15
20
60
minutes
hours
Storm
Durotion

TABLE B-2
Runoff Curve Numbers
(From NRCS (SCS) TR-55)
HYDROLOGIC SOIL GROUP
LAND USE DESCRIPTION
Open Space
44
65
77
82
30
58
Meadow / Orchard
71
78
Agricultural
59
71
79
83
Forest
36
60
73
79
Commercial
(85% Impervious)
89
92
94
95
Industrial
81
(72% Impervious)
88
91
93
Institutional
71
(50% Impervious)
82
88
90
Residential
Average Lot Size
% impervious
1/8 acre or less*
65
77
85
90
92
1/8 - 1/3 acre
34
59
74
82
87
1/3 - 1 acre
23
53
69
80
85
1 - 4 acres
12
46
66
78
82
74
Farmstead
59
82
86
98
Smooth Surfaces (Concrete, Asphalt,
98
98
98
Gravel or Bare Compacted Soil)
Water
98
98
98
98
Mining/Newly Graded Areas
77
86
91
94
(Pervious Areas Only)
 Includes Multi-Family Housing unless justified lower density can be provided.
Note: Existing site conditions of bare earth or fallow ground shall be considered as meadow when
choosing a CN value.

of Agriculture, Soil Conservation Service, Baltimore, MD.
Source : Rawls, W.J., S.L. Wong and R.H. McCuen, 1981, "
Parking
Open Space
Streets
Commercial
Industrial
Lot Size 1 Acre
Lot Size 1/2 Acre
Lot Size 1/3 Acre
Lot Size 1/4 Acre
Lot Size 1/8 Acre
Residential
Forest
Meadow
Pasture
Cultivated Land
Runoff coefficients for storm recurrence intervals less than 25 years.
Land Use
0.95
0.85
0.11
0.05
0.76
0.70
0.88
0.71
0.85
0.67
0.22
0.14b
0.14
0.25
0.16
0.28
0.19
0.30
0.22
0.08°
0.33
0.08
0.25
0.14
0.10
0.15
0.12
0.05
0-2%
0.96
0.86
0.16
0.10
0.77
0.71
0.85
0.68
0.26
0.19
0.29
0.32
0.23
0.88
0.20
0.34
0.26
0.37
0.28
0.11
0.22
0.16
0.25
0.20
0.13
0.08
0.18
2-6%
1, "Comparison of Urban Flood Frequency Procedures", Preliminary Draff, U.S. Department
0.97
0.87
0.20
0.14
0.79
0.71
0.89
0.72
0.86
0.68
0.29
0.22
0.32
0.24
0.35
0.26
0.37
0.29
0.40
0.31
0.14
0.11
0.30
0.25
0.37
0.30
0.22
0.16
6%+
0.95
0.71
0.85
0.14
0.08
0.80
0.89
0.71
0.85
0.68
0.24
0.28
0.19
0.17
0.30
0.22
0.33
0.24
0.10
0.08
0.14
0.23
0.16
0.27
0.20
0.18
0-2%
By Hydrologic Soils Group and Overland Slope (%)
RATIONAL RUNOFF COEFFICIENTS
0.86
0.19
0.13
0.82
0.96
0.72
0.89
0.72
0.86
0.68
0.28
0.21
0.32
0.23
0.35
0.26
0.37
0.29
0.39
0.30
0.14
0.28
0.22
0.34
0.15
0.28
2-6%
0.97
0.87
0.26
0.19
0.84
0.74
0.89
0.72
0.86
0.69
0.34
0.36
0.26
0.28
0.39
6%+
0.30
0.42
0.33
0.44
0.25
0.18
0.14
0.37
0.30
0.45
0.37
0.28
0.21
TABLE B-3
0.95
0.85
0.18
0.12
0.72
0.72
0.68
0.22
0.84
0.89
0.86
0.28
0.20
0.25
0.36
0.30
0.33
0.27
0.38
0.12
0.10
0.26
0.20
0.30
0.24
0.20
0.14
0-2%
0.96
0.86
0.23
0.17
0.85
0.73
0.89
0.69
0.86
0.32
0.25
0.35
0.38
0.29
0.40
0.31
0.27
0.33
0.28
0.16
0.35
0.42
0.34
0.25
0.19
0.13
2-6%
0.97
0.87
0.32
0.24
0.89
0.76
0.72
0.87
0.69
0.40
0.31
0.42
0.32
0.90
0.45
0.34
0.47
0.36
0.38
0.20
0.49
0.16
0.44
0.36
0.52
0.44
0.34
0.26
6%+
0.95
0.85
0.22
0.16
0.89
0.24
0.73
0.89
0.86
0.69
0.31
0.34
0.26
0.28
0.38
0.15
0.36
0.30
0.41
0.12
0.30
0.18
0.33
0.24
0.37
0.30
0.24
0-2%
0.86
0.96
0.27
0.21
0.91
0.75
0.89
0.72
0.86
0.69
0.35
0.29
0.38
0.30
0.40
0.32
0.42
0.34
0.45
0.36
0.20
0.16
0.30
0.40
0.23
0.40
0.50
0.29
2-6%
0.97
0.87
0.39
0.28
0.95
0.78
0.90
0.72
0.88
0.70
0.46
0.35
0.48
0.37
0.50
0.39
0.52
0.40
0.54
0.42
0.25
0.20
0.50
0.40
0.62
0.50
0.31
0.41
6%+

TABLE B-4
Roughness Coefficients (Manning's "n') For Overland Flow
(U.S. Army Corps Of Engineers, HEC-1 Users Manual)
Surface Description
Dense Growth
0.4
0.5
Pasture
0.3
0.4
Lawns
0.2
0.3
Bluegrass Sod
0.2
0.5
Short Grass Prairie
0.1
0.2
Sparse Vegetation
0.05
0.13
Bare Clay-Loam Soil (eroded)
0.01
0.03
Concrete/Asphalt - very shallow depths
(less than 1/4 inch)
0.10
0.15
- small depths
(1/4 inch to several inches)
0.05
0.10
Roughness Coefficients (Manning's “n') For Channel Flow
Reach Description
Natural stream, clean, straight, no rifts or pools
0.03
Natural stream, clean, winding, some pools or shoals
0.04
Natural stream, winding, pools, shoals, stony with some weeds
0.05
Natural stream, sluggish deep pools and weeds
0.07
Natural stream or swale, very weedy or with timber underbrush
0.10
Concrete pipe, culvert or channel
0.012
Corrugated metal pipe
0.012-0.027(1)
High Density Polyethylene (HDPE) Pipe
Corrugated
0.021-0.029(2)
Smooth Lined
0.012-0.020(2)
(1) Depending upon type, coating and diameter
(2) Values recommended by the American Concrete Pipe Association, check Manufacturer's
recommended value.

TABLE B-5
INFILTRATION REQUIREMENTS IN CARBONATE AREAS
Test Pit Density (per
Percolation Tests (per
Effective Soil
Auger Grid Spacing
acre of proposed
acre of proposed
Thickness (ft.)
(Feet On-Center)
infiltration area)*
infiltration area)**
50
4 to 8
12
35
2 to 4
16
25
*No. of Test Pits required = Infiltration sq. ft./43,560 x test pit density from chart rounded up to the
nearest whole number
**No. of Percolation Tests required = Infiltration sq. ft./43,560 x percolation tests from chart
rounded up to the nearest whole number

ORDINANCE APPENDIX C
DRAINAGE PLAN APPLICATION
(To be attached to the "land subdivision plan or development plan review application or "minor land
subdivision plan review application")
Application is hereby made for review of the Stormwater Management and Erosion and
Sedimentation Control Plan and related data as submitted herewith in accordance with the
Township Stormwater Management and Earth Disturbance
Ordinance.
Final Plan
Preliminary Plan
Sketch Plan
Date of Submission
Submission No.
1. Name of subdivision or development
2. Name of Applicant
Telephone No.
(if corporation, list the corporation's name and the names of two officers of the corporation)
Officer 1
Officer 2
Address
Zip
Applicants interest in subdivision or development
(if other than property owner give owners name and address)
3. Name of property owner
Telephone No.
Address
Zip
4. Name of engineer or surveyor
Telephone No.
Address
Zip
5. Type of subdivision or development proposed:
Single-Family Lots
Townhouses
Commercial (Multi-Lot)
Two Family Lots
Garden Apartments
Commercial (One-Lot)
Multi-Family Lots
Mobile-Home Park
Industrial (Multi-Lot)
Cluster Type Lots
Campground
Industrial (One-Lot)
Planned Residential
Other (
Development

6. Lineal feet of new road proposed
L.F.
7. Area of proposed and existing impervious area on entire tract.
S.F.
a. Existing (to remain)
% of Property
b. Proposed
S.F.
% of Property
8. Stormwater
a. Does the peak rate of runoff from proposed conditions exceed that flow which occurred for
existing conditions for the designated design storm?
b. Design storm utilized (on-site conveyance systems) (24 hr.)
No. of Subarea
Watershed Name
Explain:
C.
 Does the submission and/or district meet the release rate criteria for the applicable subarea?
d. Number of subarea(s) from Ordinance Appendix D of the Maiden Creek Watershed
Stormwater Management Plan.
e. Type of proposed runoff control
f. Does the proposed stormwater control criteria meet the requirement/guidelines of the
Stormwater Ordinances?
If not, what variances/waivers are requested?
Reasons
f. Does the plan meet the requirements of Article i of the Stormwater Ordinances?
If not, what variances/waivers are requested?
Reasons Why
h. Was TR-55, June 1986 utilized in determining the time of concentration?
i.
What hydrologic method was used in the stormwater computations?

j. Is a hydraulic routing through the stormwater control structure submitted?
k. Is a construction schedule or staging attached?
Is a recommended maintenance program attached?
9. Erosion and Sediment Pollution Control (E&S):
a. Has the stormwater management and E&S plan, supporting documentation and narrative
been submitted to the
Berks
County Conservation District?
b. Total area of earth disturbance
S.F.
10. Wetlands
a. Have the wetlands been delineated by someone trained in wetland delineation?
b. Have the wetland lines been verified by a state or federal permitting authority?
c. Have the wetland lines been surveyed?
d. Total acreage of wetland within the property
e. Total acreage of wetland disturbed
f.Supporting documentation
11. Filing
a. Has the required fee been submitted?
Amount
b. Has the proposed schedule of construction inspection to be performed by the Applicant's
engineer been submitted?
c. Name of individual who will be making the inspections
d. General comments about stormwater management at the development

CERTIFICATE OF OWNERSHIP AND ACKNOWLEDGMENT OF APPLICATION:
COMMONWEALTH OF PENNSYLVANIA
COUNTY OF
BERKS
day of
On this the
20
, before me, the undersigned officer,
personally appeared
who being duly sworn, according to law, deposes
and says that
owners of the property described in this application
and that the application was made with
knowledge and/or direction and
does hereby agree with the said application and to the submission of the same.
Property Owner
My Commission Expires
20
Notary Public
AND BELIEF THE INFORMATION AND STATEMENTS GIVEN ABOVE ARE TRUE AND
CORRECT.
SIGNATURE OF APPLICANT
(Information Below This Line To Be Completed By The Municipality)
(Name of) Municipality official submission receipt:
Date complete application received
Plan Number
Fees
date fees paid
received by
Official submission receipt date
Received by
Municipality

ORDINANCE APPENDIX D
STORMWATER MANAGEMENT DISTRICT
WATERSHED MAP

MAIDEN CREEK WATERSHED
ACT 167 STORMWATER MANAGEMENT PLAN
LOCATION MAP
Management District Legend
Egivalert Design Stom
Design Slom
District
Rste
Existing
Condions
Raduca
1-Yesr
to-Yex.
To
10-Yesr
WEST PENN
Reduce
to-Yow
1-Year
To
110-Year
HEIDELBERG
Recuce
B2
SYear
To
50-Yen
10-Yemr
100-Yem
100-Ya*
Reduce
I-Year
2-Vear
25-Yew
人-000
1c0-Year
C*
200% Release Rata
LYNN
BERKS COUNTY
ALBANY
B1
WEISENBERG
LER
EHIGH COUNTY
SCHUYLKILL COUNTY
COUNT
B2
26
LEXASMPE
GREENWICH
KUTETONN
PERR
MAXATANNY
B2
RICHMOND
B3
YONS
MAIDENCREEK
EEWO
ROCKLAND
B2
ALNEE
RUSCOMBMANOR
0.5
Miles
LASACES
ORDINANCE
Map Legend
Portiors of this map were generated from existing data sources as listed below.
Corporate Ofice
APPENDIX D
WATERSHED BQUNDARY
813 BaltimareDrive
STREAMS
Wlkes-3arre,PA18702
Borion-Lawson Engineering has found some inaccuracies in some of this data
MANAGEMENT
WATER BODIES
Tel: 570-821-1999
andi has coredled the data in locations where discrepancies wereobvious,
COUNTYBOUNDARIES
DISTRICTS
Lehigh Valley Office
DATA SOURCES
MUNICIPALBOUNDARIES
8814ChrisphaltDrive
Whuershed Boundary -PADEFY iModitied by Borton-Lawson
Prepared For.
LawBon
HGHWAYS
Bath,PA18014
Sreams - PaDEP
Berks County
Tel:610-837-591S
Laws -US Fosh anui Wilctife Service (Extractedfrom NM Coverages)
OTHERROADS
Planning Cemmlssion
RAILROADS
County Serrices Center
Raads -Berks Ca.&Lehigh:Vuley Planning Cammitsions, PennDoT
Raltroacs-Benks Co.&Lerigh ValleyPlanngContssions
PREPARED SY: SUD
633 Court Street
SUBWATERSHEDS
Counties-Berks County Planning Commisscm
CHECKED BY
Reading,PA 19601
MunicipllesBerksCo.&LenignVateyPlanningCotisins,PuwD
LIMESTONE
616-476-6300
ManagomeniDrsticis-Boron-Lawtch
DATE:10/26/2005
PROJECT NO,203-1349-C1

ORDINANCE APPENDIX E
LOW IMPACT DEVELOPMENT (LID) PRACTICES
ALTERNATIVE APPROACH FOR
MANAGING STORMWATER RUNOFF
Natural hydrologic conditions may be altered radically by poorly planned development
practices, such as introducing unneeded impervious surfaces, destroying existing drainage
swales, constructing unnecessary storm sewers, and changing local topography. A traditional
drainage approach of development has been to remove runoff from a site as quickly as
possible and capture it in a detention basin.  This approach leads ultimately to the
degradation of water quality as well as expenditure of additional resources for detaining and
managing concentrated runoff at some downstream location.
The recommended alternative approach is to promote practices that will minimize proposed
condition runoff rates and volumes, which will minimize needs for artificial conveyance and
storage facilities. To simulate predevelopment hydrologic conditions, infiltration is often
necessary to offset the loss of infiltration by creation of impervious surfaces. The ability of
the ground to infiltrate depends upon the soil types and its conditions.
Preserving natural hydrologic conditions requires careful alternative site design
considerations.
Site design practices include preserving natural drainage features,
minimizing impervious surface area, reducing the hydraulic connectivity of impervious
surfaces, and protecting natural depression storage. A well-designed site will contain a mix
of all those features. The following describes various techniques to achieve the alternative
approach:
Preserving Natural Drainage Features. Protecting natural drainage features,
particularly vegetated drainage swales and channels, is desirable because of their
ability to infiltrate and attenuate flows and to filter pollutants. However, this
objective is often not accomplished in land development. In fact, commonly held
drainage philosophy encourages just the opposite pattern -- streets and adjacent storm
sewers typically are located in the natural headwater valleys and swales, thereby
replacing natural drainage functions with a completely impervious system. As a
storm sewers with no opportunity for attenuation, infiltration, or filtration.
Developments designed to fit site topography also minimizes the amount of grading
on site.
Protecting Natural Depression Storage Areas. Depressional storage areas have no
surface outlet, or drain very slowly following a storm event. They can be commonly
seen as ponded areas in farm fields during the wet season or after large runoff events.
Traditional development practices eliminate these depressions by filling or draining.
thereby obliterating their ability to reduce surface runoff volumes and trap pollutants.

The volume and release-rate characteristics of depressions should be protected in the
design of the development site. The depressions can be protected by simply avoiding
the depression or by incorporating its storage as additional capacity in required
detention facilities.
Avoiding introduction of impervious areas. Careful site planning should consider
reducing impervious coverage to the maximum extent possible. Building footprints,
sidewalks, driveways and other features producing impervious surfaces should be
evaluated to minimize impacts on runoff.
Reducing the Hydraulic Connectivity of Impervious Surfaces. Impervious
surfaces are significantly less of a problem if they are not directly connected to an
hydraulic connectivity are routing of roof runoff over lawns and reducing the use of
storm sewers. Site grading should promote increasing travel time of stormwater
runoff, and should help reduce concentration of runoff to a single point in the
development.
Routing Roof Runoff Over Lawns. Roof runoff can be easily routed over lawns in
most site designs. The practice discourages direct connections of downspouts to
storm sewers or parking lots. The practice also discourages sloping driveways and
parking lots to the street. By routing roof drains and crowning the driveway to run
off to the lawn, the lawn is essentially used as a filter strip.
Reducing the Use of Storm Sewers. By reducing use of storm sewers for draining
streets, parking lots, and back yards, the potential for accelerating runoff from the
development can be greatly reduced. The practice requires greater use of swales and
may not be practical for some development sites, especially if there are concerns for
areas that do not drain in a “reasonable"' time. The practice requires educating local
citizens and public works officials, who expect runoff to disappear shortly after a
rainfall event.
Reducing Street Widths. Street widths can be reduced by either eliminating on-
street parking or by reducing roadway widths. Municipal planners and traffic
designers should encourage narrower neighborhood streets which ultimately could
lower maintenance.
Limiting Sidewalks to One Side of the Street. A sidewalk on one side of the street
may suffice in low-traffic neighborhoods. The lost sidewalk could be replaced with
bicycle/recreational trails that follow back-of-lot lines. Where appropriate, backyard
trails should be constructed using pervious materials.
Using Permeable Paving Materials.
These materials include permeable
interlocking concrete paving blocks or porous bituminous concrete. Such materials
should be considered as alternatives to conventional pavement surfaces, especially for

low use surfaces such as driveways, overflow parking lots, and emergency access
roads.
Reducing Building Setbacks. Reducing building setbacks reduces driveway and
entry walks and is most readily accomplished along low-traffic streets where traffic
noise is not a problem.
Constructing Cluster Developments. Cluster developments can also reduce the
amount of impervious area for a given number of lots. The biggest savings is in street
length, which also will reduce costs of the development.  Cluster development
clusters the construction activity onto less-sensitive areas without substantially
affecting the gross density of development.
In summary, a careful consideration of the existing topography and implementation of a
combination of the above mentioned techniques may avoid construction of costly stormwater
control measures. Other benefits include reduced potential of downstream flooding, water
quality degradation of receiving streams/water bodies and enhancement of aesthetics and
reduction of development costs. Beneficial results include more stable baseflows in
receiving streams, improved groundwater recharge, reduced flood flows, reduced pollutant
loads, and reduced costs for conveyance and storage.

ORDINANCE APPENDIX F
REFERENCES
BMP Manuals
California
California Stormwater BMP Handbook: New Development and Redevelopment (January
2003) - separate file available at http://www.cabmphandbooks.org/Development.asp
Georgia
Georgia Stormwater Management Manual Volume 2: Technical Handbook (August 2001)
separate file (http://www.georgiastormwater.com/)
Maryland
2000 Maryland Stormwater Design Manual -
http://www.mde.state.md.us/Programs/Waterprograms/SedimentandStormwater/stormwater
design/index.asp
Massachusetts
Stormwater Management, Volume Two: Stormwater Technical Handbook (Massachusetts,
1997) - separate file available at http:/www.state.ma.us/dep/brp/stormwtr/stormpub.htm
Minnesota
Minnesota Urban Small Sites BMP Manual: Stormwater Best Management Practices for
Cold Climates (July 2001) -
http://www.metrocouncil.org/environment/Watershed/BMP/manual.htm
New Jersey
Revised Manual for New Jersey: Best Management Practices for Control of Non-point
Source Pollution from Stormwater (Fifth Draft May 2000) -
http://www.state.nj.us/dep/watershedmgt/bmpmanual.htm
New York
New York State Stormwater Management Design Manual (2001) -
http://www.dec.state.ny.us/website/dow/swmanual/swmanual.html
Pennsylvania
Pennsylvania Association of Conservation Districts, Pennsylvania Handbook of Best
Management Practices for Developing Areas, November 14, 1997.
Washington
Stormwater Management Manual for Western Washington (August 200l) -
http://www.ecy.wa.gov/programs/wq/stormwater/manual.html
Federal
Stormwater Best Management Practices in an Ultra-Urban Setting: Selection and Monitoring
(FHWA) - http://www.fhwa.dot.gov/environment/ultraurb/3fs 1.htm
USEPA Infiltration Trench Fact Sheet (September 1999) -
http://cfpub.epa.gov/npdes/stormwater/menuofbmps/post.cfm
Riparian Buffer References
Alliance for the Chesapeake Bay, Pennsylvania Department of Environmental Protection,
September 2000. Forest Buffer Toolkit, Stream ReLeaf Program.
Penn State College of Agricultural Sciences, 1996. Establishing Vegetative Buffer Strips
Along Streams to Improve Water Quality. Publication # AGRS-67.
Fike, Jean, June 1999. Terrestrial & Palustrine Plant Communities of Pennsylvania,
Pennsylvania Natural Diversity Inventory, The Nature Conservancy, Western

Pennsylvania Conservancy, and Pennsylvania Department of Conservation and Natural
Resources.
Pennsylvania Association of Conservation Districts, Inc., Keystone Chapter, Soil and Water
Conservation Society, Pennsylvania Department of Environmental Protection, Natural
Resources Conservation Service, 1998. Pennsylvania Handbook of Best Management
Practices for Developing Areas. Prepared by CH2MHill.
Palone, R. S. and A. H. Todd (eds), 1997. Chesapeake Bay Riparian Handbook: A Guide for
Establishing and Maintaining Riparian Forest Buffers. Chesapeake Bay Program and
Northeastern Area State and Private Forestry. Natural Resources Conservation Service
Cooperative State Research Education and Extension Services.
The Federal Interagency Stream Restoration Working Group (FISRWG, 10/1998). Stream
Corridor Restoration Principles, Processes, and Practices. GPO Item No. 0120-A;
SuDocs No. A57.6/2:EN3/PT.653. ISBN-0-934213-59-3. Published October 1998.
Revised August 2000.

ORDINANCE APPENDIX G
West Nile Virus Guidance
(This source is from the Monroe County, PA Conservation District who researched the
potential of West Nile Virus problems from BMPs due to a number of calls they were
receiving)
Monroe County Conservation District Guidance:
Stormwater Management and West Nile Virus
Source: Brodhead McMichaels Creeks Watershed Act 167 Stormwater Management
Ordinance Final Draft 2/23/04
The Monroe County Conservation District recognizes the need to address the problem
of non-point source pollution impacts caused by runoff from impervious surfaces. The new
stormwater policy being integrated into Act 167 Stormwater Management regulations by the
PA Department of Environmental Protection (DEP) will make non-point pollution controls
an important component of all future plans and updates to existing plans. In addition, to meet
post-construction anti-degradation standards under the state National Pollution Discharge
Elimination System (NPDES) permitting program, applicants will be required to employ Best
Management Practices (BMPs) to address non-point pollution concerns.
Studies conducted throughout the United States have shown that wet basins and in
particular constructed wetlands are effective in traditional stormwater management areas
such as channel stability and flood control, and are one of the most effective ways to remove
stormwater pollutants (United States Environmental Protection Agency 1991, Center for
Watershed Protection 2000). From Maryland to Oregon, studies have shown that as
urbanization and impervious surface increase in a watershed, the streams in those watersheds
become degraded (CWP 2000). Although there is debate over the threshold of impervious
cover when degradation becomes apparent (some studies show as little as 6% while others
show closer to 20%), there is agreement that impervious surfaces cause non-point pollution
in urban and urbanizing watersheds, and that degradation is ensured if stormwater BMPs are
not implemented.
Although constructed wetlands and ponds are desirable from a water quality
perspective there may be concerns about the possibility of these stormwater management
structures becoming breeding grounds for mosquitoes. The Conservation District feels that
although it may be a valid concern, municipalities should not adopt ordinance provisions
prohibiting wet basins for stormwater management.
Mosquitoes
The questions surrounding mosquito production in wetlands and ponds have
intensified in recent years by the outbreak of the mosquito-borne West Nile Virus. As is the
case with all vector-borne maladies, the life cycle of West Nile Virus is complicated,
traveling from mosquito to bird, back to mosquito and then to other animals including
humans. Culex pipiens was identified as the vector species in the first documented cases from
New York in 1999. This species is still considered the primary transmitter of the disease
across its range. Today there are some 60 species of mosquitoes that inhabit Pennsylvania

Along with C. pipiens, three other species have been identified as vectors of West Nile Virus
while four more have been identified as potential vectors.
The four known vectors in NE Pennsylvania are Culex pipiens, C. restuans, C.
salinarius and Ochlerotatus japonicus. All four of these species prefer, and almost
exclusively use, artificial containers (old tires, rain gutters, birdbaths, etc.) as larval habitats.
In the case of C. pipiens, the most notorious of the vector mosquitoes, the dirtier the water
the better they like it. The important factor is that these species do not thrive in functioning
wetlands where competition for resources and predation by larger aquatic and terrestrial
organisms is high.
The remaining four species, Aedes vexans, Ochlerotatus Canadensis, O. triseriatus
and O. trivittatus are currently considered potential vectors due to laboratory tests (except the
O. trivittatus, which did have one confirmed vector pool for West Nile Virus in PA during
2002). All four of these species prefer vernal habitats and ponded woodland areas following
heavy summer rains. These species may be the greatest threat of disease transmission around
stormwater basins that pond water for more than four days. This can be mitigated however by
establishing ecologically functioning wetlands.
Stormwater Facilities
If a stormwater wetland or pond is constructed properly and a diverse ecological
community develops, mosquitoes should not become a problem. Wet basins and wetlands
constructed as stormwater management facilities, should be designed to attract a diverse
wildlife community. If a wetland is planned, proper hydrologic soil conditions and the
establishment of hydrophytic vegetation will promote the population of the wetland by
amphibians and other mosquito predators. In natural wetlands, predatory insects and
amphibians are effective at keeping mosquito populations in check during the larval stage of
development while birds and bats prey on adult mosquitoes.
The design of a stormwater wetland must include the selection of hydrophytic plant
species for their pollutant uptake capabilities and for not contributing to the potential for
vector mosquito breeding. In particular, species of emergent vegetation with little submerged
growth are preferable. By limiting the vegetation growing below the water surface, larvae
lose protective cover and there is less chance of anaerobic conditions occurring in the water.
Stormwater ponds can be designed for multiple purposes. When incorporated into an
open space design a pond can serve as a stormwater management facility and a community
amenity. Aeration fountains and stocked fish should be added to keep larval mosquito
populations in check.
Publications from the PA Department of Health and the Penn State Cooperative
Extension concerning West Nile Virus identify aggressive public education about the risks
posed by standing water in artificial containers (tires, trash cans, rain gutters, bird baths) as
the most effective method to control vector mosquitoes.
Conclusion
The Conservation District understands the pressure faced by municipalities when
dealing with multifaceted issues such as stormwater management and encourages the
incorporation of water quality management techniques into stormwater designs. As Monroe
County continues to grow, conservation design, groundwater recharge and constructed
wetlands and ponds should be among the preferred design options to reduce the impacts of

increases in impervious surfaces. When designed and constructed appropriately, the runoff
mitigation benefits to the community from these design options will far out weigh their
potential to become breeding grounds for mosquitoes.

ORDINANCE APPENDIX H
Stormwater Management Practices
for projects which are exempt under Section 402 of this
Ordinance.

STORMWATER MANAGEMENT PROCEDURES
FOR PROJECTS MEETING THE LAND COVER EXEMPTION CRITERIA
What are the Act 167 Stormwater Management Reguirements?
Pennsylvania Act 167 was authorized on October 4, 1978 (32 P.S., P.L. 864) and gave
Pennsylvania Municipalities the power to regulate activities that affect stormwater runoff,
surface and groundwater quantity and quality.
Who is affected by these reguirements?
The Act 167 Stormwater Management Requirements affect all NEW development in the
Maiden Creek watershed. Individual home construction projects on single family lots which
result are exempt under Section 402 of this Ordinance, are not required to submit formal
drainage plans to the Municipality or County; however, they are still encouraged to address
Water Quality and Groundwater Recharge criteria specified in the Maiden Creek Watershed
Stormwater Ordinance (Ord. Sections 305 and 306).
Do I reguire professional services to meet these reguirements?
This brochure has been developed to assist the individual homeowner in meeting the
voluntary water quality and groundwater recharge goals of the Maiden Creek Watershed
Stormwater Ordinance. If the guidelines presented in this brochure are followed, the
individual homeowner will not require professional services to comply with these water
quality and groundwater recharge.
What do I need to Send to the Municipality?
Even though a formal drainage plan is not required for individual lot owners, a brief
description of the proposed infiltration facilities, including types of material to be used, total
impervious areas and volume calculations as shown above, and a simple sketch plan showing
the following information shall be submitted to the contractor prior to construction:
 Location of proposed structures, driveways or other paved areas with approximate
size in square feet.
Location of any existing or proposed on site septic system and/or potable water wells
showing rough proximity to infiltration facilities.
Determination of Recharge Volume
The amount of recharge volume that should be provided can be determined by following the
simple steps below. Impervious area calculations should include all areas on the individual
lots that are covered by roof area or pavement which would prevent rain for naturally

percolating into the ground, including sidewalks, driveways or parking areas. Sidewalks,
driveways or patios that are constructed with gravel or turf pavers and will not be
blacktopped in the future, need not be included in this calculation.
Example Recharge Volume:
STEP 1 - Determine Total Impervious Surfaces:
House Roof (Front)
12 ft x 48 ft
576 sq. ft
House Roof (Rear)
12 ft x 48 ft
576 sq. ft.
Driveway
12 ft x 50 ft
600 sq. ft.
Parking Pad
12 ft x 12 ft
144 sq. ft.
Walkway
6 ft x 20 ft
120 sq. ft.
2,016 sq. ft.
STEP 2 - Determine Require Infiltration Volume (Rv) Using the Following Equation
Rv = 1 inch x (total impervious area in sguare feet) =
cubic feet of recharge
Rv = 1.0 x 2,016 sq. ft. = 2,016 cu. ft.
STEP 3 - Sizing of Select Infiltration Method
The following pages show several methods of infiltrating stormwater runoff from residential
areas. Their appropriateness depends on the amount of infiltration volume required and the
amount of land available. More than one method can be implemented on a site, depending
on site constraints. Dry wells should be used only for receiving runoff from roof drains.
Infiltration trenches are appropriate for receiving runoff from driveways, sidewalk or parking
areas. Other methods may be appropriate, but these should be discussed with the municipal
engineer prior to installation.
Dry Wells
Dry wells are effective methods of infiltrating runoff from roof leaders. These facilities
should be located a minimum of 10 feet from the building foundation to avoid seepage
problems. A dry well can be either a structural prefabricated chamber or an excavated pit
filled with aggregate. Construction of a dry well should be performed after all other areas of
the site are stabilized, to avoid clogging. During construction, compaction of the subgrade
soil should be avoided and construction should be performed with only light machinery.
Depth of dry wells in excess of 3 /2 feet should be avoided. Gravel fill should be an average
1.5 - 3.0 inches in diameter. Dry wells should be inspected at least four times annually as
well as after large storm events.

FIGURE H-1
TYPICAL DRY WELL CONFIGURATION
ROOFLEADER
SURCHARGE PIPE
-SPLASHBLOCK
CAPWITHSCREWTOPLID
12
GEOTEXTILE
BANK
TOP&SIDESONLY
RUN
88
GRAVEL
BUILDING
FOUNDATON
OBSERVATIONWELL
FOOT
10
PLATE
MINIMUM
12" SAND LAYER
Source: Maryland Stormwater Design Manual, 2000
Example Sizing:
STEP 1 - Determine Total Impervious Surfaces
House Roof Area:
12 ft x 48 ft = 576 sq. feet
STEP 2 - Determine Require Infiltration Volume using Equation
1.0 x 576 sq. ft. = 576 cu. ft.
STEP 3 - Sizing of Select Infiltration Method
Volume of facility -- Depth x Width x Length
Set D = 3.5 ft; Set W = L for a square chamber
576 cu. ft. = 3.5 x L X L ; L = 10 ft
Final Facility Dimensions: 3.5 ft (D) x 12.8 ft (W) x 12.8 ft (L)

Infiltration Trenches
An infiltration trench is a long, narrow, rock-filled trench with no outlet that receives
stormwater runoff. Runoff is stored in the void space between the stones and infiltrates
through the bottom and into the soil matrix. Infiltration trenches perform well for removal of
fine sediment and associated pollutants. Pretreatment using buffer strips, swales, or detention
basins is important for limiting amounts of coarse sediment entering the trench which can
clog and render the trench ineffective.
FIGURE H-2
TYPICAL INFILTRATION TRENCH CONFIGUATION
RUNOFF FILTERS THROUGH GRASS
OVERFLOWBERM
QESERVATN WELL
BUFFER STRIP (20'MINIMUMX GRASS
WITH SCREWTOP LD
CHANNEL: QOR SEDIMENTATION VAULT
MMM
2"PEAGRAVELFILTERLAYER
PRQTECTVELAYEROFFILTERFABRIC
TRENCH3-8FEETDEEP
FILLEDWITH1.5-2.5INCHDIAMETER
CLEAN STONE
(BANK RUN GRAVEL PREFERRED)
SAND FILTERB"OEEP
(OR FAERICEQUVALENT)
RUNOFFEXFILTRATESTHROUGH
UNDISTURBED SUBSOILS WTHA
MINIMUMRATEOFO.SNCHESPERHOUR
Source: Maryland Stormwater Design Manual, 2000
Example Sizing:
STEP 1 - Determine Total Impervious Surfaces
Driveway
12 ft x 50 ft
600 sq. ft.
Parking Pad
12 ft x 12 ft
144 sq. ft.
Walkway
6 ft x 20 ft
120 sq. ft.
864 sq. ft.
STEP 2 - Determine Require Infiltration Volume using Equation
1.0 inch x 864 sq. ft. = 864 cu. ft.
STEP 3 - Sizing of Select Infiltration Method

Volume of facility =- Depth x Width x Length
Set D = 3.5 ft; Determine Required Surface Area of Trench
864 cu. ft. / 3.5 ft. = 247 sq. ft.
The width of the trench should be greater than 2 times it depth (2 x D); therefore in this
example a trench width of 8 feet is selected;
Determine trench length: L = 247 sq. ft / 8 ft = 30.8 ft, say 31 ft.
Final Trench Dimensions: 3.5 ft (D) 8 ft (W) x 31 ft (L)

FIGURE H-3
SAMPLE SITE SKETCH PLAN
Smith Property
115OakHillDrive
Stormwater Infiltration Sketch Plan
Grade to Drain
Submitted: 15-October-2000
50 ft
12 ft
12 ft 
12 ft
Drveway.
Parking
15 ft
Propose Septic Field
5 ft
RoofArea
48 ft
6f
1 - 3.5 ft (D) x 10 ft (W) × 12.8 ft (L) Dry Well
2 - 3.5 ft (D) × 8 ft (W) × 31 ft (L) Trench Drain
12 ft
12 ft

4.0
Construction Site Stormwater Runoff Control Program
4.1
Description
MCM #4 requires the Ms4 municipality to:
4.1.1
If an NPDES permit is required for earth disturbance activities, do not issue a
building permit or approval until confirmation that a valid NPDES permit is
obtained.
4.1.2
Notify DEP or Berks County Conservation District within 5 days of the receipt
of an application for a permit involving an earth disturbance activity consisting
of one acre or more.
4.1.3
Enact, implement, and enforce an ordinance to require the implementation of
erosion and sediment control BMPs, as well as sanctions to ensure
compliance.
4.2
Memorandum of Understanding
Maidencreek Township has entered into an agreement with Berks County Conservation
District (BCCD), via the Memorandum of Understanding (MOU) in Appendix H, which
addresses items 1 and 2, above.
4.3
Records Retention
The Township will retain all correspondence from BCCD as part of this SWMP. Copies of all
permits, inspections, complaints and any relevant stormwater information will also be
retained as part of this SWMP. Permit-year copies of this correspondence appear in
Appendix I.
4.4
Ordinance Adoption
Maidencreek Township adopted its Stormwater Management Ordinance, Ordinance Number
regarding erosion and sediment control and NPDES permit requirements. Any ordinance
updates will be properly advertised.
13

4.5
Plan Maintenance
Maidencreek Township will review and revise this Plan annually, as MOU provisions may
change and ordinances are updated periodically.
14

APPENDIX I
MCM #4 - CONSTRUCTION SITE STORMWATER RUNOFF CONTROL
BERKS COUNTY CONSERVATION DISTRICT/MAIDENCREEK TOWNSHIP
MEMORANDUM OF UNDERSTANDING

MEMORANDUMOFUNDERSTANDING
Received
Between the
FEB 2 7 2017
BERKS COUNTY CONSERVATIONDISTRICT
Berks County
Conservation District
and
Maidencreek Township
This Memorandum has been prepared jointly and agreed upon by each party for the following purposes:
To serve as a joint commitment by the signatory parties to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth which may result from the conduct of earth disturbance activities in
maidencreek Townsh.p
("Municipality").
I. In carrying out the intent of this Memorandum, the Berks County Conservation District ("District") shall:
1.
changes in the plan review fee schedule.
2.
Receive and review all Erosion and Sedimentation Control Plans ("E&s Plan" or "plan") for earth
disturbance activities 5,ooo square feet or greater, which are required to be written in accordance with
Chapter 102.4 of the PA Code.
3.
Within ten (10) working days of completion of review, notify the consultant, the applicant, the
determinations including all project inspection reports and valid complaint inspection reports. Providing
.this information supports the Municipality with respect to Municipality's MS4 reporting requirements as
required to satisfy Minimum Control Measure #4 related to services provided under this Memorandum.
4.
Notify the consultant, the applicant, and the Municipality that a Plan submission has been returned
based on either the lack of response within the specified time period or the lack of the development of a
complete Plan in compliance with PA Department of Environmental Protection (PA DEP) Chapter 102
Erosion and Sediment Control Rules and Regulations.
5.
Upon request, provide all applicants with the PA DEP Erosion and Sediment Pollution Control Program
Manual and related forms, worksheets, checklists, etc., necessary to successfully prepare a Plan.
6.
Upon the filing of a complaint by the Municipality and/or a third party, the foilowing will occur:
a. The District will inspect the compiaint within (10) ten calendar days of its receipt.
b. If warranted, the District will provide documentation of the associated findings. The source of the complaint
shall remain anonymous in accordance with PA DEP policy.
Serve as the repository for all Plans, complaints, Earth Disturbance Inspection Reports, correspondence,
etc., within the limitations stated by PA DEP, that involve earth disturbance activities within the said
Municipality. All such information, except the complaint forms, shall be contained in a filing system
which shall be available for inspection by Municipal officiais upon receipt of a formal written request.
8.
When requested by the landowner, provide technical assistance in the development of needed
Agricultural E&s Plans and Manure Management Plans. 09/7/2016
JIShs2k11AsharedVADMIN MOUs. Agreements. Contracts\MOU'sIMOUs for Municipaitles\MEMORANDUM OF UNDERSTANDING 9-7-16.docx

In carrying out the intent of this Memorandum, the Municipality shall:
1.
Retain a sufficient quantity of the District's project application packets and provide such packets to all
parties for projects that require a review. The Municipality shail provide instructions to have the Plans
(residential, commercial, industrial, timber harvest, agricultural expansion construction, etc.) for earth
disturbance activities greater than or equal to 5,ooo square feet, which are required to be written in
accordance with Chapter 102.4 of the PA Code, submitted to the District for review per Chapter 102 of
the PA Code.
2.
Notify the District within (5) five days of receipt of an application for a project disturbing greater than or
equal to (1) one acre, pursuant to Chapter 102.42.
3.
Pursuant to Chapter 102.43, the Municipality shall not issue building or other permit or approval to
those proposing or conducting earth disturbance activities requiring a PA DEP permit until the PA DEP or
Permit for Stormwater Discharges Associated with Construction Activities under Chapter 102.5.
4.
Forward all questions pertaining to the preparation of Plans and applications to the District.
5.
Forward all third party complaints about ongoing earth disturbance activities to the District for its
inspection.
6.
Not issue final ciose-out, or grant final release of improvement/E&s escrow until the applicant has
submitted a Notice of Termination for all NPDEs Permitted activates and received Permit termination
correspondence from the District.
7.
Forward to the District, any third party agricultural complaint relating to: nutrient pollution and sediment
pollution.
8.
The District highly recommends that the Municipality necessitate the development of written
Agricultural E&s Plans, which are required under Chapter 102.4 for agricultural plowing or tiling
activities and animal heavy use areas disturbing 5,ooo square feet or greater of land, as well as
necessitate the development of Manure Management Plans, before building permits for agricultural
for all farming operations that land apply manure or agricultural process wastewater, whether they
Concentration Area (ACA) or pasture must also have a written Manure Management Plan. in addition,
the Municipality should not issue a building permit, or other permit or approval, to those proposing to
construct a liquid or semi-solid waste storage facility unless they have a design that has been approved
and stamped by a professional engineer.
11.
This Memorandum of Understanding shall become effective immediately. It shall be reviewed as the need
arises by either or both parties, and may be amended by mutual consent of both parties. This Memorandum of
Understanding may be terminated at any time, by either party, following a thirty (30) day written notice to the other
party.
DATE
date.
Attest:
FOR THE
RKSCOUNTYCONSERVATIONDISTRICT
3/29/7
CHAIR
DATE
ILSbs2kYAsharedVADMIN\MOUs.Agreements.Contracts\MOU'sIMOUs forMunicipalitiesIMEMORANDUMOFUNDERSTANDING 9-7-16.docx

APPENDIX J
MCM #4 - CONSTRUCTION SITE STORMWATER RUNOFF CONTROL
BERKS COUNTY CONSERVATION DISTRICT CORRESPONDENCE AND RELATED
DOCUMENTATION

See MCM #5, Appendix M

APPENDIX K
MCM #4 - CONSTRUCTION SITE STORMWATER RUNOFF CONTROL
# O # 

See MCM #3, Appendix H

5.0
Post-Construction Stormwater Management (PcsM) in New and Redevelopment
Areas Program
5.1
Description
MCM #5 requires the MS4 municipality to:
5.1.1
Enact, implement, and enforce an ordinance or other regulatory mechanism
to address post-construction stormwater runoff from new development and
redevelopment projects, as well as sanctions and penalties associated with
non-compliance.
5.1.2
Develop and implement measures to encourage and expand the use of Low
Impact Development (LiD) in new development and redevelopment.
5.1.3
stormwater management BMPs installed at all development or
redevelopment projects that disturb greater than or equal to one acre.
5.2
Ordinance Adoption
Maidencreek Township adopted its Stormwater Management Ordinance, Ordinance Number
214, on June 12, 2008. The ordinance requires contains technical standards that must be met
for post-construction stormwater runoff and included penalties for non-compliance.
Maidencreek Township's Stormwater Management Ordinance contains guidance and
requirements relative to Low Impact Development (LiD). The ordinance also contains
requirements for BMP inspections.
5.3
Memorandum of Understanding
Maidencreek Township has entered into an agreement with Berks County Conservation
District, via the Memorandum of Understanding (MOU) in Appendix J, which addresses items
1 and 3, above.
5.4
PCSM BMP Inventory
The Township is required to maintain an inventory of all PCSM BMPs installed since March
10, 2003. There are currently no BMPs to account for during this period. The following
information must be tracked at such time that PCSM BMPs are installed:
15

All PCSM BMPs that were installed to meet requirements in NPDES Permits for
Stormwater Discharges Associated with Construction Activities approved since March
10, 2003.
The exact location of the PCSM BMP (e.g., latitude and longitude, with street
address).
Information (e.g., name, address, phone number(s)) for BMP owners and entities
responsible for BMP O&M, if different from BMP owners.
The type of BMP and the year it was installed.
Maintenance required for the BMP type according to the Pennsylvania Stormwater
BMP Manual or other manuals and resources.
The actual inspection/maintenance activities conducted for each BMP.
An assessment by the permittee if proper O&M has occurred during the year and if
not, what actions the permittee has taken, or shall take, to address compliance with
O&M requirements.
5.5
RecordsRetention
The Township will retain all correspondence from BCCD as part of this SWMP. Copies of all
permits, inspections, complaints and any relevant stormwater information will also be
retained as part of this SWMP. Permit-year copies of this correspondence appears in
Appendix M.
5.6
PlanMaintenance
Maidencreek Township will review and revise this Plan annually, as MoU provisions may
change, ordinances are updated periodically, and new PCsM BMPs may be constructed.
16

APPENDIX L
MCM #5 -- POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW
DEVELOPMENT AND REDEVELOPMENT
BERKS COUNTY CONSERVATION DISTRICT/MAIDENCREEK TOWNSHIP
MEMORANDUM OF UNDERSTANDING

MEMORANDUM OFUNDERSTANDING
Received
Between the
FEB 2 7 2017
BERKSCOUNTYCONSERVATIONDISTRICT
Berks County
Conservation District
and
Maidencreeh Township
This Memorandum has been prepared jointly and agreed upon by each party for the following purposes:
To serve as a joint commitment by the signatory parties to control accelerated erosion and to prevent sediment
pollution to the Waters of the Commonwealth which may result from the conduct of earth disturbance activities in
maidencreek Tewnsh.p
("Municipality").
1.
changes in the plan review fee schedule.
2.
Receive and review all Erosion and Sedimentation Control Plans ("E&S Plan" or "Plan") for earth
disturbance activities 5,ooo square feet or greater, which are required to be written in accordance with
Chapter 102.4 of the PA Code.
3.
Within ten (10) working days of completion of review, notify the consultant, the applicant, the
Municipality, and the municipal engineer of all E&s Plan/NPDES Permit approvals, deficiencies, and all
determinations including all project inspection reports and valid complaint inspection reports. Providing
required to satisfy Minimum Control Measure #4 related to services provided under this Memorandum.
4.
Notify the consultant, the applicant, and the Municipality that a Plan submission has been returned
based on either the lack of response within the specified time period or the lack of the development of a
complete Plan in compliance with PA Department of Environmental Protection (PA DEP) Chapter 102
Erosion and Sediment Control Rules and Regulations.
5.
Upon request, provide all applicants with the PA DEP Erosion and Sediment Pollution Control Program
Manual and related forms, worksheets, checklists, etc., necessary to successfully prepare a Plan.
6.
Upon the filing of a complaint by the Municipality and/or a third party, the following will occur:
a. The District will inspect the complaint within (10) ten calendar days of its receipt.
b. If warranted, the District wi provide documentation of the associated findings. The source of the complaint
shall remain anonymous in accordance with PA DEP policy.
Serve as the repository for all Plans, complaints, Earth Disturbance Inspection Reports, correspondence,
etc., within the limitations stated by PA DEP, that involve earth disturbance activities within the said
Municipality. All such information, except the complaint forms, shall be contained in a filing system
which shall be available for inspection by Municipal officials upon receipt of a formal written request.
8.
When requested by the landowner, provide technical assistance in the deveiopment of needed
Agricultural E&s Plans and Manure Management Plans. 09/7/2016
ISbs2k11IsharedVADMINAMOUs.Agreements. ContractsIMOU's\ MOUs for MunlclpalitiesIMEMORANDUM OF UNDERSTANDING 9-7-16.docX

In carrying out the intent of this Memorandum, the Municipality shall:
1.
Retain a sufficient quantity of the District's project application packets and provide such packets to all
parties for projects that require a review. The Municipality shall provide instructions to have the Plans
(residential, commercial, industrial, timber harvest, agricuitural expansion construction, etc.) for earth
disturbance activities greater than or equal to 5,oo0 square feet, which are required to be written in
accordance with Chapter 102.4 of the PA Code, submitted to the District for review per Chapter 102 of
the PA Code.
2.
Notify the District within (5) five days of receipt of an application for a project disturbing greater than or
equal to (1) one acre, pursuant to Chapter 102.42.
3.
Pursuant to Chapter 102.43, the Municipality shall not issue building or other permit or approval to
those proposing or conducting earth disturbance activities requiring a PA DEP permit until the PA DEP or
District has issued the E&S or individual NPDES Permit or approved coverage under the general NPDES
Permit for Stormwater Discharges Associated with Construction Activities under Chapter 1o2.5.
4.
Forward all questions pertaining to the preparation of Plans and applications to the District.
5.
Forward all third party complaints about ongoing earth disturbance activities to the District for its
inspection.
6.
Not issue final close-out, or grant final release of improvement/E& escrow until the applicant has
submitted a Notice of Termination for alt NPDEs Permitted activates and received Permit termination
correspondence from the District.
7.
Forward to the District, any third party agricultural complaint relating to: nutrient pollution and sediment
pollution.
8.
The District highly recommends that the Municipality necessitate the development of written
Agricuitural E&s Plans, which are required under Chapter 102.4 for agricultural plowing or tiling
activities and animal heawy use areas disturbing 5,o00 square feet or greater of land, as well as
necessitate the development of Manure Management Plans, before building permits for agricuitural
operations are approved. Manure Management Plans are required under 25 PA. Code Section 91.36 (b)
for all farming operations that land apply manure or agricultural process wastewater, whether they
generate the manure or import it from another operation. All farming operations that include an Animal
Concentration Area (ACA) or pasture must also have a written Manure Management Plan. In addition,
construct a liquid or semi-solid waste storage facility unless they have a design that has been approved
and stamped by a professional engineer.
This Memorandum of Understanding shall become effective immediately. It shall be reviewed as the need
arises by either or both parties, and may be amended by mutual consent of both parties. This Memorandum of
party.
Ll-b-
DATE
Pipcr
ate
Attest:
FOR THE
CRKS COUNP CONSERVAJION DISTRICT
3/29/7
CHAIR
DATE
ISbs2kyIsharedVADMIN\MOUs.Agreements.Contracts/MOU'sIMOUsforMunlcipalitiesAMEMORANDUMOEUNDERSTANDING9-7-16.docx

APPENDIX M
MCM #5 - POST-CONSTRUCTION STORMWATER MANAGEMENT IN NEW
BERKS COUNTY CONSERVATION DISTRICT CORRESPONDENCE AND RELATED
DOCUMENTATION

Insert any BccD correspondence and documents or state there wasn't any.
"None This Reporting Period"

6.0
Pollution Prevention/Good Housekeeping for Municipal Operations Program
6.1
Description
MCM #6 requires the MS4 to identify and document all operations that are owned or
operated by the municipality and have the potential for generating stormwater runoff to the
regulated Ms4. Also required is the development and implementation of a written
Operations and Maintenance (O&M) Program for all operations that could contributed to the
discharge of pollutants to the MS4. Finally, MCM #6 requires the municipality to develop
and implement an employee training program that addresses topics that further the goal of
preventing or reducing the discharge of pollutants from operations to the regulated Ms4.
This municipal O&M and employee training program is designed to teach municipal staff
about potential sources of stormwater contamination and ways to minimize the water
quality impact of municipal activities, such as park and open space maintenance, fleet and
building maintenance, construction and land disturbances, and storm drain system
maintenance. The training program includes a general stormwater awareness
message, pollution prevention/good housekeeping measures, spill response and prevention,
information about the operation and maintenance of structural best management practices
(BMPs), and recognizing, tracking, and reporting illicit discharges.
6.2
Applicability
Municipal employees who are directly involved in potentially polluting activities should
receive both general stormwater and targeted BMP training tailored to their activities. This
will increase the likelihood that receiving waters and the storm drain system will be
protected from inadvertent discharges and spills. It is important to train all municipal staff,
however, regardless of field responsibilities, about general stormwater awareness and the
detection of illicit discharges. Very often, municipal staff are residents as well, and improving
the awareness of municipal employees may reduce residential impacts and increase
reporting of illicit discharges, dumping, and spills. Also, because municipalities expect
residents and business owners to practice pollution prevention and good housekeeping,
municipal employees should set an example for the rest of the community to follow.
6.3
General StormwaterAwareness
Municipal employees need to understand the difference between stormwater and sewage,
and that not all drains go to the same places. This basic fact is often taken for granted, as
municipal staff is usually well-versed in the aspects of their infrastructure, but it does not
hurt to drive the point home.
17

Stormwater is rain or snowmelt runoff and it is usually collected by gutters, swales, ditches,
pipes and catch basins and conveyed by gravity to waterways. Therefore, any pollutants
placed in those conveyances will invariably end up in a waterway. Pollutants include
sediment (dirt, gravel, etc.), nutrients (fertilizers, pet wastes, etc.), bacteria (animal wastes,
etc.), debris (trash, cigarette butts, etc.), and hazardous wastes (oils, solvents, cleansers,
etc.). Waterways are protected against pollution by state and federal laws. Employees
should be made aware that there is a municipal ordinance that prohibits certain types of
discharges to the storm sewer system, and provides penalties for violators.
6.4
Pollution Prevention/Good Housekeeping
General municipal operations include activities such as street sweeping, trash collection,
snow plowing/deicing, fleet maintenance, infrastructure upkeep and the like. Each of these
activities has the potential to create pollution in waterways. Staff needs to be aware of the
proper means to operate equipment, dispose of debris, and conduct other routine activities,
as it relates to prevention of pollution. For example, street sweeping debris needs to be
properly disposed of at a location designated and approved to receive such debris.
Similarly, fleet maintenance needs to be conducted such that fuels, oils and greases are not
spilled onto the ground where rain water can wash the materials into stormwater collection
facilities. See Appendix N for the Township's Operation and Maintenance (O&M) Plan.
6.5
BMP Operation and Maintenance
The municipality may be responsible for maintenance of stormwater facilities and staff need
to be aware of proper measures and frequencies to conduct such maintenance. For example,
stormwater detention basins need to be inspected periodically to ensure erosion is not
present and that outlet structures are functional. Ditches and swales need to be stable and
not contributing to sedimentation through erosion. Catch basin grates need to be cleared.
See Appendix N for the Township's Operation and Maintenance (O&M) Plan.
6.6
Illicit Discharge Tracking and Reporting
Municipal staff need to be trained to recognize illicit discharges within the storm sewer
systems throughout the municipality. Outfall screenings are conducted annually, but illicit
discharges can occur at any time. Activities such as dumping of motor oil into a storm drain,
provides enforcement actions against violators.
18

6.7
Training Resources
A number of workshops are generally available for staff to attend throughout a given year.
The Berks County MS4 Steering Committee provides information on training sessions
available for municipal staff. Berks County Public Works Association periodically provides
training specifically relating to stormwater. In-house training is also provided. Stormwater
awareness is promoted via on the job reinforcement, display materials and new-employee
training. Posting reminders, such as markers above drains prohibiting discharges of vehicle
fluids and wastes, or signs above faucets reminding employees not to use water to clean up
spills will remind employees of proper procedures. Stickers that list important information
and contact numbers for reporting illicit discharges, dumping, or spills can be adhered to ail
municipal vehicles. Stenciling or marking all storm drains at municipal facilities will prompt
employees to be conscious of discharges. Managers should monitor status of employees'
participation in training and work performance.
6.8
Training Checklist
Training should be provided annually for all municipal staff members. Clerical and
administrative staff should be proficient with all MCMs. Zoning, regulatory and public works
staff should be well-versed in MCM #3 (IDD&E) and MCM #6 (Housekeeping), with general
familiarity of MCMs #4 and #5, as they relate to BMP inspections. The following checklist can
be used by municipal managers and/or staff leaders to ensure compliance with the municipal
training requirement of the NPDES permit:
6.8.1 Stormwater Awareness - The employee understands that:
Stormwater is rain or snowmelt runoff.
Stormwater facilities have the potential to transmit pollutants directly into
waterways.
6.8.2 Pollution Prevention/Good Housekeeping - The employee will:
Ensure that street sweeping debris and materials cleaned from catch basins,
gutters, etc. are disposed of only at facilities approved to receive that material.
Monitor applications of road salt and/or anti-skid materials to ensure waterways
are protected to the extent possible.
Conduct maintenance of municipal vehicles in a manner that minimizes the
potential for pollution incidents.
19

 Conduct infrastructure repairs (e.g., pipe replacements, stream cleaning, etc.) in
accordance with permits and/or policies in place by state and federal regulatory
agencies.
Ensure that trash haulers comply with prevailing regulations relative to collection
and disposal of waste.
6.8.3 BMP Operation and Maintenance - The employee will:
Conduct maintenance activities on stormwater facilities on a regular basis,
including mowing, cleaning and inspections.
6.8.4 Illicit Discharge Tracking and Reporting - The emplovee will:
Understand that the municipal ordinance includes provisions for enforcement of
illicit discharges.
Be aware of and/or participate in the conduct of annual screenings of outfalls as
per the IDD&E plan for the municipality.
Contact superiors immediately upon discovery or suspicion of an illicit discharge,
evident via visual (color, consistency, etc.), odor (solvents, paints, oils, etc.), or
other observation.
6.8.5Event Tracking - The municipality will:
Document all training, as well as routine and non-routine activities in writing; for
example, keep track of the following by date, location and/or written description:
 street sweeping, disposal locations
mowing
salt/anti-skid spreading
vehicle maintenance conducted on municipal grounds
facility maintenance (gutters, ditches, swales, catch basins)
pollution incidents
outfall screenings
any other activities that have the ability to impact stormwater runoff
20

6.9
Additional Resources/References
The municipality should make the following list available to staff for additional information
on the MS4 program:
http://water.epa.gov/polwaste/npdes/swbmp/Municipal-Employee-Training-and-
Education.cfm
http://water.epa.gov/polwaste/npdes/swbmp/Pollution-Prevention-Good-
Housekeeping-for-Municipal-Operatators.cfm
http://www.ecy.wa.gov/programs/wg/stormwater/municipal/MUNldocs/CWPmanu
alGdHskpg.pdf
http://files.dep.state.pa.us/Water/BPNPSM/StormwaterManagement/MunicipalStor
mwater/MuniSWResources/SampleOMPlan.docx
21

APPENDIX N
MCM #6 --- POLLUTION PREVENTION / GOOD HOUSKEEPING
BMP'S #1 & #2 FACILITIES INVENTORY AND OPERATIONS AND MAINTENANCE
PLAN

Construction and Land Disturbance Pollution Prevention/Good
Housekeeping Practices
IMPACTS: Sediment runoff such as silt and debris can affect fish reproduction and habitat.
Removal of shade trees from stream banks can increase water temperature which can result in
reduced dissolved oxygen content in streams.
GOOD HOUSE KEEPING PRACTICES:
1. Plan the construction and/or land clearing activities so that soil is not exposed for long
periods of time.
2. Install sediment control devices before disturbing soil.
3. Stabilize site to protect against sediment runoff. Protect against sediment flowing into
storm drains. Install sediment barriers on slopes or divert storm water.
4.  Maintain native vegetation - this is especially important near waterways.
INSPECTION PROCEDURES: Schedule regular inspections of sediment control devices.
Inspect during and after storms. Make all necessary'repairs to devices.
Reviewed09/27/2022

Hazardous Materials Storage
IMPACTS: Failure to properly store hazardous materials increases the chance that they will end
up in local waterways. Typical hazardous materials such as oil, paints, thinners, antifreeze, and
fuels are toxic to aquatic plants and wildlife.
GOOD HOUSE KEEPING PRACTICES:
1. Train employees in spill prevention and proper disposal methods.
2. Ensure all materials are stored in closed labeled containers. Inside storage shall be away
from floor drains. Outside storage, drums shall be placed on pallets and away from storm
drains and swales. Store materials away from high traffic areas.
3. Never leave a vehicle unattended when fueling.
4. Use the least toxic material to perform the job. If possible, replace toxic materials with
environmentally friendly, water based products
5.1
 All containers must be labeled.
6.
Maintain MSDS sheets and inventory hazardous materials.
7. 1
 Perform preventive maintenance on fuel tanks.
8. Properly dispose of waste.
INSPECTION PROCEDURES: Inspection of material storage areas in addition to inspection of
storm water discharge areas and floor drains shall be scheduled on a regular basis by the Road
Master. Leaking or defectiye containers shall be replaced and labels shall be replaced as needed.
Check for external corrosion and structural failure of fuel tanks.
SPILL PREVENTION AND CONTROL PLAN:
Reviewed 09/27/2022

Municipal Vehicle/Equipment Maintenance and Washing
IMPACTS: Trace amounts of metals, hydrocarbons and other pollutants from fuel, antifreeze,
batteries, motor oils, grease and parts cleaning solvents are typically found in maintenance
operations.
GOOD HOUSE KEEPING PRACTICES:
1. Train employees in spill prevention and proper disposal methods.
2. Conduct maintenance work indoors. If work is conducted outdoors, guard against spills
that could discharge to a storm drain. Dedicate one bay with a floor drain for vehicle
washing.
3. Maintain a clean work area.
4.
Rinse grass from lawn care equipment in grass areas.
5.
 Perform equipment washing with pressurized cold water, with biodegradable soap.
6.
Store cracked batteries in a leak-proof secondary container.
7. 
Seal floor drains that discharge directly to the environment if possible. In the event of a
spill cover drains with drain mats.
8. (
Clean up spills immediately using a "dry" method.
9. Keep all liquid cleaning at a centralized station to keep solvents in one area and locate
drip pans to direct solvents back into a holding tank for reuse.
10. Identify recycling/disposal options for wastes.
INSPECTION PROCEDURES: Inspect floor drains and monitor parked vehicles/equipment for
leaks.
Reviewed09/27/2022

Road Salt Storage
IMPACTS: Salt is soluble in water and in high concentrations have a negative impact on aquatic
life.
GOOD HOUSE KEEPING PRACTICES:
1. Salt storage facilities shall be covered.
2. 
Salt spreaders shall be calibrated for proper application.
3. 
Salt shall be unloaded in the shed or if not possible, moved inside immediately
4.
Service trucks and calibrate spreaders regularly.
5.
Educate and train operators on the hazards of over salting to roads and the environment.
INSPECTION PROCEDURES: The salt shed should be inspected for leaks and structural
problems. Inspect the salt for lumps or contaminants. Inspect the surface areas for evidence of
alt runoff near and around the salt shed.
Deicing Alternates:
Calcium Chloride - not harmful to vegetation. Lowest practical temperature 5 degrees
Fahrenheit.
Urea -- Will not harm vegetation. Will work below O degrees Fahrenheit.
Calcium Magnesium Acetate - Low toxicity and biodegradable.
Reviewed09/27/2022

Roadway, Bridge, Storm Drain and Catch Basin Maintenance
IMPACTS: Road salt, particulate and debris from roads and bridges can impact aquatic life.
Grit and debris captured in catch basins can discharge during rain and snow melt events. Swales
if stripped of vegetation can deposit silt in receiving waters.
GOOD HOUSE KEEPING PRACTICES:
1. Stage road operations and maintenance (patching potholes for example) to reduce
spillage. Cover catchbasins and storm drains during this activity.
2. Pave in dry weather only.
3.
Clean up fluid spills immediately.
4.
Sweep and vacuum roads and shoulders to remove debris.
5.
Regularly pick up litter along roadsides.
6.
Maintain roadside vegetation and vegetation in swales by mowing.
7. 6
Clean bridges routinely and keep them free of debris.
8. 1
Direct runoff from bridges to vegetated areas.
9. 
Clean storm drains and catch basins when the depths of deposits are greater than 1/3 the
depth from the bottom of the basin to the invert of the lowest pipe opening. Drains must
be checked in the spring to remove debris from winter maintenance and in fall to remove
leaves.
10. Repair drains and catch basins.
11. Properly dispose of debris.
drains and swales spring and fall and after major storm events. MS4 required inspections to be
performed in addition to routine inspections.
Reviewed09/27/2022

APPENDIX O
MCM #6 - POLLUTION PREVENTION / GOOD HOUSKEEPING
BMP #3 EMPLOYEE TRAINING DOCUMENTATION

None this reporting period

APPENDIX P
MCM #6 - POLLUTION PREVENTION / GOOD HOUSKEEPING
PA DEP STREET SWEEPING MATERIAL REUSE POLICY

pennsylvania
Rev.8/19/2015
DEPARTMENT OF ENVIRONMENTAL
PROTECTION
Bureau of Waste Management
Disposal/Reuse of Street-Sweeping Debris and Antiskid
Street sweepings consist of antiskid (cinders, coal (bottom) ash, rock, and sand), salt, leaves, plastic,
broken glass, small pieces of metal, litter and debris. Sweepings are removed from streets, parking lots
and sidewalks to improve the appearance and safety of public roadways and prevent pollution of local
waterways.
Municipalities are able to reuse antiskid provided that it is screened to separate all non-reusable debris,
such as silt, trash, litter, leaves, etc., from the reusable antiskid material and visually checked for
contaminants, staining or odors. if the visual examination shows no staining, odors or other evidence of
contaminants, the antiskid may be managed as clean fil and used in an unrestricted manner, inctuding
the following:
Reuse as antiskid.
Remixed with new salt mixture for winter application to roads.
As the sub-grade beneath a paved municipal road or parking lot.
For filling potholes.
of-way.
Other fill.
f the visual examination shows staining, odors or other evidence of contaminants, the antiskid materia!
must be tested to determine if it quatifies as clean fill. Testing must be performed in accordance with
Appendix A of the Management of Fill policy (Document No.258-2182-7731. If testing reveals that the
antiskid material contains regulated substances at concentrations that exceed the limits in Tables Fp-1a
material obtains authorization under Waste Management General Permit WMGRo96. Otherwise,the
material must be disposed of at a permitted landfill.
All non-reusable debris that has been removed from the antiskid, as well as catch-basin material, must
be disposed of at a landfill. For additional information, please contact the Bureau of Waste
Management, Division of Municipal and Residual Waste, at 717-787-7381.

APPENDIX Q
MCM #6 - POLLUTION PREVENTION / GOOD HOUSKEEPING
POLLUTANT REDUCTION PLAN (PRP)

Maidencreek Township, Berks County
POLLUTANT REDUCTION PLAN (PRP)
Willow Creek MS4
Prepared for
MAIDENCREEK TOWNSHIP
BOARD OF SUPERVISORS
1 Quarry Road
Blandon, PA 19510
Maidencreek Township, Berks County, PA
June 29, 2017
Updated December 10, 2018
Updated April 3, 2019
Project 19-0019-0191
SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net

Maidencreek Township, Berks County
POLLUTANT REDUCTION PLAN (PRP)
Willow Creek
1.0
Introduction
This MS4 Pollutant Reduction Plan (PRP) has been prepared by Systems Design Engineering, Inc. (SDE),
for Maidencreek Township, Berks County, Pennsylvania (the Township), as part of the Township's
obligations under its NPDES PAG-13 MS4 permit (Permit Number PAG-13-3521). Maidencreek Township
has been operating under a permit since 2003.
The pollutant of concern in this PRP is "nutrients." A portion of the Township's MS4 discharges to a
segment of Willow Creek that is impaired for nutrients, reportedly originating from an "industrial point
source."
This plan will discuss implementation of best management practice (BMP) pollutant control measures
within the storm sewersheds tributary to the impaired stream, with the intention of demonstrating a
reduction in applicable pollutant loads as calculated using accepted methodologies.
2.0
Watershed/MS4 Characteristics
The MS4 area within Maidencreek Township is defined by the "Reading" Urbanized Area (UA) from the
2010 U.S. Census (see Figure 1). The UA is comprised mainly of residential developments, with some
Maidencreek Township has two (2) impaired surface waters that need special plans, as they relate to
regulated stormwater discharges: Lake Ontelaunee, which has a TMDL for nutrients and suspended
Pennsylvania Integrated Water Quality Monitoring and Assessment Report [303(d) List]. There are other
reaches of Willow Creek and its unnamed tributaries that have various impairments according to the
Integrated Report, but they do not currently pertain to regulated stormwater discharges.
Figure 2 depicts Maidencreek Township and its UA, as well as the impaired surface waters pertaining to
regulated stormwater discharges (red segments of Willow Creek needing a PRP and yellow Lake
by the MS4, because the UA does not include the upper tributary to Willow Creek. The downstream
segment is approximately 0.5 mile in length.
Maidencreek Township's MS4 has 56 regulated outfalls and seven (7) observation points. Three (3)
outfalls discharge to Lake Ontelaunee and the remainder to Willow Creek and its unnamed tributaries.
-1-

Richmond Twp
Maldenceek
Bisrdon
Figure 1. Maidencreek Township Urbanized Area (from PA DEP's eMapPA online tool at
http://www.depgis.state.pa.us/emappa/)
2.1
303(d) Nutrient Listing Discussion
The 2014 Pennsylvania Integrated Water Quality Monitoring and Assessment Report lists the specific
impairment to the portion of Willow Creek in question is listed as “Industrial Point Source -- Nutrients."
The Assessment ID is 2327. The only nearby potential nutrient-yielding industrial point source a private
corporation's wastewater treatment facility that discharges to the Willow Creek, over one-half mile
downstream of the stream segment identified as having the industria! point source. It is unclear to what
source the "industrial point source" is attributed for the stream segment identified, as the vast majority
of the storm sewersheds tributary to the segment are comprised primarily of residential properties.
3.0
PRP Calculations
phosphorus. However, for non-Chesapeake Bay PRPs, "nutrients" refers to total phosphorus (TP). The
goal of this PRP is therefore to reduce TP by five percent (5%) through BMP implementation. It can be
presumed that a sediment reduction of at least 10 percent will accomplish the 5% TP reduction.

TMDLLakes(1of3)
TMDLGENID:554
TMDLName: Lake Ontelaunee TMDL
ReachCode:02040203001811
Status Finat: Y
NonAttainingStreamsAssessments (2of4)
Cause; Nutrients ; Suspended Solids
TMDL Begin Date: Null
AssessmentUnitID:2391
THDL End Date: Null
GNIS Name:
Meeting Date: Null
GNIS ID:
Draft_Date: Null
Assessed Use: Aquatic Life
Finat_Date: B/9/2004
Attain Use: Impaired
TMDLURLTitle: Lake Ontelaunee TMDL
Source Cause: Agriculture - Nutrients ; Agriculture - Siltation ; Road
TMDLURL File:EPA
Runoff-Siltation
Info Sheet URL Title: Information Sheet for Lake Ontelaunee
Attained: N
TMDL
ReadhCode:02040203001036
Info Sheet URL File: EPA TMDLhtm
COMID:25973026
Public Notice URL Title: Public Notice for Lake Ontelaunee TMDt.
Length Miles: 3.716668
Public Notice URL File: EPA TMPLhtn
HUC:02040203
Zoom.to
Map Symbology:
Date Created: 7/9/2001
NonAltainingStreams Acsessments (2df5)
As5essment Unit ID: 2327
GNiS Name:Willow Creek
GNIS ID: 01191498
Assessed Use: Aquatic Lfe
Attain Use: Impaired
Source Cause: Industrial Point Source -Nutrients ; Industrial Point
Source -Flow Aiterations
Attained: N
ReachCode: 02040203000520
COM1O;133228670
Length Miles: 0.000076
HUC: 02040203
Map Symbology:
Date Created: 7/2/2001
Zoomto
Figure 2. Maidencreek Township Impaired Surface Waters Pertaining to Stormwater Discharges (from
PA DEP's eMapPA online tool at http://www.depgis.state.pa.us/emappa/)
3.1
Methodology
This PRP will establish existing pollutant loadings for TP. DEP's simplified method has been selected for
the majority of the computations. According to Attachment B PA DEP's Pollutant Reduction Plan (PRP)
Instructions (3800-PM-BCW0100k, rev. 3/20/17) in Appendix B, Berks County's loading rates for TP are
2.26 Ibs/acre/yr and 0.98 Ibs/acre/yr for impervious developed and pervious developed areas,
respectively. For undeveloped areas outside of the UA, a loading rate of 0.33 Ibs/acre/yr is to be used
for TP. Loading rates derived from the Lake Ontelaunee TMDL document are used for two (2) specific
storm sewersheds (O-015 and Willow Creek Riparian Buffer Area), where pervious areas needed to be
evaluated for the actual existing and proposed covers (i.e., a more detailed analysis is needed than just a
“"pervious" classification, as is done in the simplified method).
ln order to apply the existing pollutant loading rates throughout the Ms4, storm sewersheds were
delineated for the 56 outfalls and seven (7) observation points tributary to Willow Creek. Each storm
sewershed was then divided into portions that are developed impervious and developed pervious, as
well as undeveloped areas outside the UA. This data was entered into a spreadsheet which calculates
total loading for each storm sewershed, as well as total gross loading overall. Again, storm sewersheds
-3-

O-O15 and Willow Creek Riparian Buffer Area are the exceptions wherein actual agricultural,
pasture/meadow and forest loading rates were used for existing and proposed conditions evaluations.
Several of the storm sewersheds also have existing BMPs (for example, dry extended detention basins,
vegetated swales, forest buffers). Areas tributary to these BMPs are further evaluated for pollutant
reductions and the cumulative result of these reductions is applied to the gross loading to determine a
net loading that is used as the baseline for the required reduction. Refer to Appendix A for the
spreadsheet tables utilized to compute existing and proposed loading.
3.2
Gross TP Loading
Gross TP loading is computed for each of the storm sewersheds using the methodology discussed above
Loading rates for each outfall's individual storm sewershed are then summed to arrive at the total gross
loading. Gross loading does not take into account any existing BMPs within the storm sewersheds.
Total gross TP loading for the storm sewersheds tributary to Willow Creek's nutrient-impaired segment
is 1,872 pounds per year. Refer to Table 1 in Appendix A.
3.3
Net TP Loading
Net Tp loading is computed by taking the gross TP loading values for each outfal's storm sewershed and
applying reductions as appropriate for existing BMPs with the storm sewersheds. Not all storm
sewersheds have existing BMPs, and some of the existing BMPs are ineligible to be counted for
reductions to loading. Existing BMPs eligible for use in this PRP include Dry Extended Detention Basins,
Forest Buffers, and Vegetated Open Channels. Each of these have specific effectiveness values, as
Storm sewersheds are subdivided into areas that are tributary to the particular BMp for reduction, and
areas that by-pass the BMP. Reductions, if available, are summed for each storm sewershed and are
subtracted from gross TP loadings, to arrive at net TP loading for each storm sewershed. Individual net
storm sewershed loadings are then summed to arrive at total net TP loading. Total net TP loading for
the storm sewersheds tributary to Willow Creek's nutrient-impaired segment is 1,644 pounds per year.
This is the baseline value to which the required five percent (5%) TP reduction is applied.
3.4
TP Reductions and BMP Effectiveness
With a net TP loading of 1,644 pounds per year, the required TP reduction at five percent (5%) is about
82 pounds. Proposed BMPs must be implemented over the five-year permit duration to achieve this
minimum reduction. Proposed BMPs are described below (refer also to Tables 3 and 4 in Appendix A).
3.4.1
"CONVERT" - Ag Field Retirement/Conversion to Meadow
Storm sewershed O-015 contains a farm field that has been purchased by Maidencreek Township for
development of a community well. This farm field will be retired and left to return to meadow, with no
chemical applications, due to wellhead protection requirements.
This BMP reduces sediment and nutrient pollution generically from “pervious" areas within the O-015
storm sewershed, but DEP's simplified method does not break down pervious areas into the specific
cropland and meadow rates that need to be evaluated for BMP effectiveness in this case. Therefore,

loading rates for this storm sewershed were computed using representative source data from the Lake
Ontelaunee TMDL document, because those sources are nearby and include cropland (which is the
existing use for the farm field in O-015) and hay/pasture (which is the proposed use of the farm field, as
converted).
Table ES-2 from the TMDL document is reproduced in the Table 4 data in Appendix A. Sources that are
common between the Lake Ontelaunee watershed and the O-015 storm sewershed are listed in Table
4.a. Data from Table Es-2 are used in Table 4.a. to develop loading rates (lb/yr/ac) for each source. In
Table 4.b., the actual areal extents of the common sources within the O-015 storm sewershed are
multiplied by the loading rates computed in Table 4.a., to arrive at loadings in pounds per year for each
O-015 source, in the existing (agricultural cropland) condition. The sum of the individual sources'
loading masses (lb/yr) is used in Table 1 (Appendix A - TP gross overall), for O-015.
In Table 2, there are no existing BMPs in O-015 being used to reduce TP; therefore, net TP is the same as
gross TP. The loading value is transferred to Table 3.
Table 3 depicts the effect of the proposed conversion of a portion of the O-015 storm sewershed from
Cropland to hay/pasture (i.e., the "CONVERT" BMP). The TP after reduction listed in Table 3 is based on
computations in Table 4.c.
Table 4.c. is a variation of Table 4.b., wherein the "Cropland" source is reduced to an area of "zero," and
the area formerly cropland is added to the hay/pasture source. This simulates the conversion BMP. As
in Table 4.b., individual sources' loading masses (lb/yr) are totaled to arrive at a proposed load. This
value is entered in Table 3 for O-O15, as the "TP After BMP Reduction."
3.4.2
"CONVERT" - Riparian Buffer Area/Conversion from Meadow to Forest
The Willow Creek Riparian Buffer Area consists of approximately 34 Maidencreek Township-owned,
contiguous acres between Schaeffer Road and PA Route 73, along the Willow Creek. Prior to its
conversion to a forested riparian buffer, the land was primarily pasture and meadow. See BMP 3.4.3
below for a complete description of the buffer's origin and value.
The conversion of the 34 acres of this formerly pasture and meadow area to deciduous forest is a BMp
that has nutrient-reducing capability. However, as in the "Cropland" conversion BMP, DEP's simplified
method is insufficient to adequately quantify nutrient loading. Therefore, as above, loading rates for
this storm sewershed were computed using representative source data from the Lake Ontelaunee TMDL
document, because those sources are nearby and include hay/pasture (which is the pre-existing use for
the riparian buffer area) and deciduous forest (which is the proposed use of the buffer area, as
converted).
Table ES-2 from the TMDL document is reproduced in the Table 4 data in Appendix A. Sources that are
common between the Lake Ontelaunee watershed and the Willow Creek Riparian Buffer Area are listed
in Table 4.a. Data from Table ES-2 are used in Table 4.a. to develop loading rates (lb/yr/ac) for each
source. In Table 4.d., the actual areat extents of the common sources within the Willow Creek Riparian
Buffer Area are multiplied by the loading rates computed in Table 4.a., to arrive at loadings in pounds
per year for each buffer area, in the existing (hay/pasture) condition. The sum of the individual sources'
loading masses (lb/yr) is used in Table 1 (Appendix A -- TP gross overall), for Willow Creek Riparian Area.
-5-

In Table 2, there are no existing BMPs in Willow Creek Riparian Area being used to reduce TP; therefore,
net TP is the same as gross TP. The loading value is transferred to Table 3.
Table 3 depicts the effect of the proposed conversion of the Willow Creek Riparian Area from
hay/pasture to deciduous forest. The TP after reduction listed in Table 3 is based on computations in
Table 4.e.
Table 4.e. is a variation of Table 4.d., wherein the "Hay/Pasture" source is reduced to an area of "zero,"
and the area formerly hay/pasture is added to the deciduous forest source. This simulates the
conversion BMP. As in Table 4.d., individual sources' loading masses (lb/yr) are totaled to arrive at a
proposed load. This value is entered in Table 3 for Willow Creek Riparian Area, as the "TP After BMP
Reduction."
3.4.3
"FOREST BUFFER"-Riparian Forest Buffer Along Willow Creek
Maidencreek Township, with nearly a dozen partners, is revegetating the approximately 34-acre riparian
buffer along Willow Creek, between Schaeffer Road and PA Route 73. Since 2011, 1,735 trees have
been planted throughout the buffer, in an effort to convert open meadow areas to a forest buffer. In-
stream fish habitat enhancements, stream bank stabilization, educational signage and invasive species
removal have also been implemented.
This is an ongoing, "living" BMP project that is a flagship example of community involvement and public
education for a riparian improvement within an Ms4. See Appendix C for a full report on the project.
It is acknowledged that DEP's PRP instructions restrict the use of previously installed BMPs as credit
toward the proposed percentage reductions required for the particular pollutant of concern. However,
this riparian buffer project is not a static BMP. it is an ongoing, constantly evolving managed "forest
buffer" BMP, the benefits of which will continue to improve over the coming five (5) year permit period
and beyond. Therefore, it is believed that the use of a "forest buffer" for a "proposed" BMP is justified.
The project began in 2011, however, no credit is sought for the buffer as an existing BMP. This is
evident in Table 2. As a proposed Forest Buffer BMP, a 50 percent effectiveness value for TP reduction
is used in Table 3.
Recent Chesapeake Bay guidelines place limitations upon the amount of area claimed for credit in
times the area of the riparian buffer. The Willow Creek Riparian Buffer Area is 34 acres; therefore,
pollutant loading from 68 acres of tributary storm sewershed area can be credited with the 50 percent
reductions for storm sewersheds 0-007, 0-008, 0-010, 0-012, 0-016, O-023 and 0-024 (these
sewersheds total is 68 acres). Remaining sewersheds tributary to the riparian buffer receive no
reduction credit in Table 3 (denoted as "Fp1" in Table 3).
-6-

4.0
Pollutant Loading Reductions
As indicated above, the pollutant of concern in this PRP is Total Phosphorus (TP), based on nutrients
from an "industrial point source." The preceding calculations depict the use of DEP's simplified method
to compute existing loading, with existing BMP effectiveness netted out of the baseline. The
calculations also demonstrate the effectiveness of the proposed BMPs on reducing TP loading.
Results of the analyses are tabulated below:
Existing Gross Loading
Existing Net Loading
Proposed Loading
Ib/yr (Table 1)
Ib/yr (Table 2)
Ib/yr
Reduction in Loading
1,871.72
1,644.15
1,554.14
5.47%
5.0
Plan Implementation
Maidencreek Township and/or its designee(s) will implement the PRP in the following manner:
Ag Field Conversion
Over the five-year permit term, allow natural meadow to return to cover former agricultural
field. Do not apply chemicals, fertilizers, pesticides or herbicides. Maintain field in natural state.
Mowing is acceptable as needed.
Forest Buffer
Over the five-year permit term, maintain established vegetation within the Willow Creek
corridor. Maintain educational signage as needed. Refer to Appendix D for a full maintenance
schedule.
6.0
Funding Mechanisms
Funding for the Ag Field Conversion and Forest Buffer BMPs will be as follows:
Ag Field Conversion
Funding for current and proposed operation and maintenance of the converted field is via the
Township's General Fund. Given the passive, low-maintenance nature of this BMP, funding
needs are expected to be minimal.
Forest Buffer
Funding for the Forest Buffer is as specified in Appendix C, which is the Project Description for
the riparian project. Current and proposed funding for operation and maintenance of the BMPs
is via the Township's General Fund.

7.0
Operation and Maintenance
Maidencreek Township owns each property upon which BMPs are proposed under this PRP.
Accordingly, the Township will operate and maintain the BMPs.
Ag Field Conversion
Limited maintenance will include occasional mowing as needed. Removal of invasive species
will be done case-by-case. Ground cover is to remain vegetated or otherwise stabilized to
prevent soil erosion. There is to be no application of any material that is contrary to regulations
supporting public drinking water wellhead protection, including but not limited to herbicides,
pesticides or fertilizers.
Forest Buffer
Refer to Appendix D for the Management Plan.
-8-

APPENDIX A
POLLUTANT LOADING CALCULATION SPREADSHEETS

TP GROSS
OVERALL
64.38
317.80
29.40
15.56
19.84
4.48
48.13
18.09
25.37
14.53
1.81
85.66
11.11
136.92
103.93
21.70
2.41
6.29
6.34
152.55
4.35
5.07
0.50
UNDEVELOPEDAREA(OUTSIDEMS4)
TP UNDEV
(/sg)
00'0
000
23.05
1.69
0.00
00:0
0.00
0.00
000
0.00
3.95
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.70
5.56
00:0
0.00
00:0
0.00
 I:ICad ProjectsIMaidencreekTownshipIMS4 & Act 167 Mappingldocs12018 PRP UpdatelApr 2019 UpdatelMT - MS4 Watershed Areas Apr-2019.xls
UNDEV
0.00
(AC)
0.00
69.85
5.13
0.00
0.00
0.00
0.00
0.00
00°0
11.97
0.00
0.00
0.00
0.00
0.00
00'
0.00
16.84
0.00
0.00
00:0
0.00
% UNDEV
25%
%0
%0
%66
%0
%0
40%
See Table 4.b.for computation of existing gross loading.
20%
%0
TP PERV
DEV (Ibshy)
PERVIOUS DEVELOPED AREA
25.37
136.90
16.67
0.85
11.48
0.00
6.87
1.53
14.66
4.40
0.84
65.50
3.06
4.38
2.48
41.27
1.14
1.33
60.12
WILLOW CREEK PRP -MAIDENCREEK TOWNSHIP
0.15
PERVIOUS
DEVELOPED
25.89
139.69
0.87
11.71
1.56
(AC)
14.96
4.49
0.86
3.12
4.47
8.73
66.84
42.11
1.16
61.35
0.15
APRIL 2019
TABLE 1.
% PERV-
IOUS DEV
%09
35%
50%
95%
95%
55%
%08
80%
50%
%0
50%
45%
%09
%09
%09
60%
%09
40%
65%
50%
45%
45%
%09
50%
TP IMPERV
DEV (lbs/yr)
IMPERVIOUS DEVELOPED AREA
39.01
157.85
12.97
0.12
31.46
6.62
0.88
6.76
10.14
2.37
6.73
4.71
13.15
92.43
0.35
69.
DEVELOPED
IMPERV
17.26
69.85
0.05
1.61
0.75
(AC)
0.39
2.99
4.49
1.05
2.08
2.98
1.70
1.66
40.90
0.15
IMPERV
40%
%99
DEV
25%
45%
45%
20%
5%
5%
20%
10%
50%
55%
40%
40%
40%
40%
40%
%09
30%
30%
55%
55%
40%
50%
SEWERSHED
AREA (AC)
 STORM
43.15
279.38
28.16
30.93
14.64
29.92
63.46
1.95
102.83
268
7.45
1.91
102.24
0.31
84.
SEWERSHED
AREA (SF)
1,879,646
107,786
12,169,849
225,522
1,226,799
649,428
555,388
1,347,374
637,572
1,303,450
83,105
84,764
390,789
226,750
2,764,452
324,495
183,712
185,123
633,685
4.479,194
188,630
3,668,549
112,530
STORM
131,152
4,453,721
13,421
OUTFALLOR
OBSERVATION
 POINT
0-002
600-0
0-004
0-001
S00-0
900-0
Z00-0
800-0
600-0
0-010
0-011
0-012
0-013
0-014
0-015
0-016
0-017
0-018
0-019
0-020
0-021
0-022
0-023
0-024
0-025
0-026

TP GROSS
OVERALL.
25.97
23.87
8.24
6.12
16.30
3.82
1.24
46.99
.04
3.18
9.33
156.87
25.32
10.70
20.75
UNDEVELOPEDAREA(OUTSIDEMS4)
TP UNDEV
(/sgi)
0.00
0.00
0.00
0.00
0.00
00'0
0.00
0.00
0.00
000
0.00
00°0
00:0
5.32
0.00
0.00
0.88
000
0.00
6.55
1.74
4.76
0.78
0.00
0.00
0.00
0.00
UNDEV
(ov)
0.00
00:0
0.00
9.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
% UNDEV
%0
%0
85%
%06
%99
15%
%0
%0
%0
30%
5%
40%
%0
50%
%0
TP PERV
PERVIOUS DEVELOPED AREA
006
5.86
1.32
2.12
9.04
3.67
12.01
2.28
0.19
6.42
1.86
2.02
45.54
0.00
6.95
7.31
13.10
10.25
6.05
18.51
PERVIOUS
DEVELOPED
9.23
1.35
(AC)
1.90
46.47
0.19
2.06
21.06
0.00
10.46
6.17
18.88
 PERV-
IOUS DEV
55%
55%
%99
70%
60%
55%
50%
10%
80%
85%
75%
%09
25%
%0
60%
95%
TP IMPERV
DEV (lbs/yr)
IMPERVIOUSDEVELOPEDAREA
4.56
1.00
1.33
11.87
286
4.29
2.14
0.44
1.16
3.25
2.46
10.13
DEVELOPED
IMPERV
1.05
1.77
0.44
5.25
(AC)
1.11
1.90
4.37
0.19
0.52
15.49
32.15
4.46
1.09
4.48
66'0
IMPERV
45%
45%
15%
45%
DEV
45%
45%
45%
45%
35%
30%
40%
45%
%09
20%
15%
10%
25%
40%
10%
25%
15%
15%
15%
5%
SEWERSHED
AREA (AC)
 STORM
1.31
.13
.73
29.89
4.35
19.88
48.
30
47.
160.
SEWERSHED
727,003
730,642
306,197
107,060
762,441
42,901
251,100
1,221
475,826
183,879
16,819
210,681
56,981
826,746
112, 177
417,913
129,651
2,698,750
AREA (SF)
541,264
1,329,921
1,528,761
2,095,147
2,053,190
7,001,386
776,505
189,443
358,489
1,301,975
STORM
865,824
171
OUTFALLOR
OBSERVATION
POINT
0-027
0-028
0-029
0-030
0-032
0-033
0-031
0-034
0-037
850-0
0-040
0-042
0-041
0-043
OP-001
0-044
0-045
0-046
0-047
0-048
0-052
0-053
0-055
OP-002
90-0
0-0

TP GROSS
OVERALL
(ysqi)
1871.72
26.06
20.82
14.79
5.99
8.40
13.25
UNDEVELOPEDAREA(OUTSIDEMS4)
TP UNDEV
0.00
0.00
0.00
0.00
82.13
0.00
UNDEV
(AC)
0.00
0.00
0.00
0.00
0.00
% UNDEV
See Table 4.d. for computation of existinggross loading.
TP PERV
DEV (lbs/yr)
PERVIOUSDEVELOPEDAREA
11.78
16.53
16.57
3.38
4.75
830.42
PERVIOUS
DEVELOPED
16.87
16.91
3.45
4.85
(AC)
12.02
% PERV-
IOUS DEV
80%
75%
%06
75%
%06
Outfalls O-049, O-050 and O-051 are outside of the PRP planning area.
TP IMPERV
DEV (lbs/yr)
IMPERVIOUSDEVELOPEDAREA
9.53
4.25
2.60
3.65
3.02
860.3
DEVELOPED
IMPERV
2.26 1bs/acre/yr
0.98 lbs/acre/yr
4.22
1.15
0.33Ibs/acrelyr
1.88
1.62
(AC)
1.34
% IMPERV
20%
25%
25%
10%
DEV
10%
SEWERSHED
ImperviousDevelopedArea:
AREA (AC)
1574.42
Pervious Developed Area:
STORM
13.35
18.79
21.09
4.60
6.46
34.07
Observation Point ID
Undeveloped Area:
SEWERSHED
200,545
818,595
281,500
581,625
918,501
AREA (SF)
1,484,094
STORM
TOTALS:
Outfall ID
OBSERVATION
Willow Creek
OUTFALL OR
Riparian Area
OP-003
LOADING
OP-004
OP-005
OP-006
OP-007
RATES:
xxx-0
POINT

TABLE 2.
WILLOWCREEKPRP-MAIDENCREEKTOWNSHIP
MS4 OUTFALL STORM SEWERSHEDS - EXISTING POLLUTANT LOADING (NET AFTER EXISTING BMPS)
APRIL 2019
BMP
TP AFTER
TP GROSS
% STORM
EFFECTIVE
BMP
TP NOT TO
TP NET
OVERALL
SEWERSHED
TPGROSSTO
TREATMENT
TREATMENT
ANY BMP
OVERALL
OUTFALL
(lbs/yr)
TO BMP
EXBMPTYPE
BMP (tbs/yr)
(Ibs/yr)
(1K/sq)
(bs/yr)
0-001
64.38
VOC-B
95.0%
61.16
45%
33.64
3.22
36.86
0-002
4.48
n/a
0.0%
0.00
0%
0.00
4.48
4.48
317.80
DED
0-003
65.0%
206.57
20%
165.25
111.23
276.48
0-004
1.81
VOC-B
50.0%
0.90
45%
0.50
0.90
1.40
0-005
29.40
n/a
0.0%
0.00
0%
0.00
29.40
29.40
0-006
15.56
n/a
0.0%
0.00
0%
0.00
15.56
15.56
0-007
19.84
n/a
0.0%
0.00
0%
0.00
19.84
19.84
0-008
48.13
n/a
0.0%
0.00
0%
0.00
48.13
48.13
0-009
n/a
18.09
0.0%
0.00
0%
0.00
18.09
18.09
0-010
2.41
n/a
0.0%
0.00
0%
0.00
2.41
2.41
0-011
n/a
25.37
0.0%
0.00
0%
0.00
25.37
25.37
0-012
14.53
n/a
0.0%
0.00
0%
0.00
14.53
14.53
0-013
3.21
DED
90.0%
2.89
20%
2.31
0.32
2.63
0-014
7.77
n/a
0.0%
0.00
0%
0.00
7.77
7.77
0-015
85.66
n/a
0.0%
0.00
0%
0.00
85.66
85.66
0-016
11.11
n/a
0.0%
0.00
0%
0.00
11.11
11.11
0-017
6.29
n/a
0.0%
0.00
0%
0.00
6.29
6.29
0-018
6.34
n/a
0.0%
0.00
0.00
6.34
6.34
0-019
21.70
n/a
0.0%
0.00
0%
0.00
21.70
21.70
0-020
7.57
FB
100.0%
7.57
50%
3.78
0.00
3.78
0-021
136.92
DED
100.0%
136.92
20%
109.53
0.00
109.53
0-022
103.93
n/a
0.0%
0.00
0%
0.00
103.93
103.93
0-023
4.35
n/a
0.0%
0.00
0%
0.00
4.35
4.35
0-024
5.07
n/a
0.0%
0.00
0%
0.00
5.07
5.07
0-025
152.55
DED
90.0%
137.29
20%
109.83
15.25
125.09
0-026
0.50
n/a
0.0%
0.00
0%
0.00
0.50
0.50
0-027
25.97
FB
100.0%
25.97
50%
12.98
0.00
12.98
0-028
26.10
FB
100.0%
26.10
50%
13.05
0.00
13.05
0-029
8.24
FB
100.0%
8.24
50%
4.12
0.00
4.12
0-030
3.82
FB
100.0%
3.82
50%
1.91
0.00
1.91
0-031
6.12
FB
100.0%
6.12
50%
3.06
0.00
3.06
0-032
1.53
FB
100.0%
1.53
50%
0.77
0.00
0.77
I:1Cad ProjectsiMaidencreekTownshipIMS4 & Act 167 Mappingldocsl2018 PRP UpdateApr 2019 UpdatelMT - MS4 Watershed Areas Apr-
2019.xls

BMP
TP AFTER
TP GROSS
% STORM
EFFECTIVE
BMP
TP NOT TO
TP NET
OVERALL
SEWERSHED
TP GROSS TO
TREATMENT
TREATMENT
ANY BMP
OVERALL
OUTFALL
(abs/yr)
EX BMP TYPE
TO BMP
BMP (Ibs/yr)
(/sql)
(usqi)
(lbs/yr)
0-033
7.53
FB
100.0%
7.53
50%
3.76
0.00
3.76
0-034
2.04
FB
100.0%
2.04
50%
1.02
0.00
1.02
0-035
8.23
FB
100.0%
8.23
50%
4.12
0.00
4.12
0-036
23.87
DED
15.0%
3.58
20%
2.86
20.29
23.16
0-037
16.30
DED
100.0%
16.30
20%
13.04
0.00
13.04
0-038
6.57
n/a
0.0%
0.00
0%
0.00
6.57
6.57
0-039
0.63
n/a
0.0%
0.00
0%
0.00
0.63
0.63
0-040
9.33
n/a
0.0%
0.00
0%
0.00
9.33
9.33
0-041
3.18
DED
100.0%
3.18
20%
2.55
0.00
2.55
0-042
11.24
n/a
0.0%
0.00
0%
0.00
11.24
11.24
0-043
1.56
n/a
0.0%
0.00
0%
0.00
1.56
1.56
0-044
80.54
DED
64.43
80.0%
20%
51.55
16.11
67.65
0-045
18.54
n/a
0.0%
0.00
0%
0.00
18.54
18.54
0-046
20.93
DED
75.0%
15.70
20%
12.56
5.23
17.79
0-047
42.20
VOC-B
100.0%
42.20
45%
23.21
0.00
23.21
0-048
46.99
n/a
0.0%
0.00
0%
0.00
46.99
46.99
0-052
53.71
DED
75.0%
40.28
20%
32.23
13.43
45.65
0-053
156.87
n/a
0.0%
0.00
%0
0.00
156.87
156.87
0-054
23.17
n/a
0.0%
0.00
0%
0.00
23.17
23.17
0-055
5.65
n/a
0.0%
0.00
0%
0.00
5.65
5.65
0-056
10.70
n/a
0.0%
0.00
0%
0.00
10.70
10.70
OP-001
25.32
n/a
0.0%
0.00
0%
0.00
25.32
25.32
OP-002
20.75
n/a
0.0%
0.00
0%
0.00
20.75
20.75
OP-003
26.06
n/a
0.0%
0.00
0%
0.00
26.06
26.06
OP-004
5.99
n/a
0.0%
0.00
0%
0.00
5.99
5.99
OP-005
20.82
n/a
0.0%
0.00
0%
0.00
20.82
20.82
OP-006
8.40
n/a
0.0%
0.00
0%
0.00
8.40
8.40
OP-007
14.79
VOC-B
100.0%
14.79
45%
8.14
0.00
8.14
Wiliow Creek
Riparian Area
13.25
n/a
0.0%
0.00
0%
0.00
13.25
13.25
1871.72
NET TP (Ibs/yr) =
1644.15
ABBREV.:
DED .
DryExtendedDetentionBasin
FB -
Forest Buffer
VOC-B -
Vegetated Open Channel - B Soils
I:ICad ProjectsIMaidencreekTownshipiMS4 & Act 167 Mappingldocs12018 PRP UpdatelApr 2019 UpdateMT - MS4 Watershed Areas Apr-
2019.xls

TABLE 3.
WILLOWCREEKPRP-MAIDENCREEKTOWNSHIP
PROPOSED POLLUTANT LOADING (WITH PROPOSED BMPS)
APRIL 2019
PROPOSED
TP AFTER
STORM
TP NET
BMP
BMP
SEWERSHED
OVERALL
PROPOSED
EFFECTIVE-
REDUCTION
OUTFALL
AREA (AC)
(ak/sqi)
BMP TYPE
NESS
(Ibs/yr)
0-001
43.15
36.86
0%
36.86
0-002
2.47
4.48
0%
4.48
0-003
279.38
276.48
0%
276.48
0-004
5.18
1.40
FB1
0%
1.40
0-005
28.16
29.40
FB1
0%
29.40
0-006
14.91
15.56
FB1
0%
15.56
0-007
12.75
19.84
FB
50%
9.92
0-008
30.93
48.13
FB
50%
24.06
0-009
14.64
18.09
FB1
0%
18.09
0-010
1.95
2.41
FB
50%
1.20
0-011
29.92
25.37
FB1
0%
25.37
0-012
8.97
14.53
FB
50%
7.27
0-013
1.91
2.63
2.63
0-014
5.21
7.77
FB1
7.77
0-015
63.46
85.66
CONVERT1 (see Table 4.c.)
58.82
0-016
7.45
11.11
FB
50%
5.56
0-017
4.22
6.29
FB1
0%
6.29
0-018
4.25
6.34
FB1
0%
6.34
0-019
14.55
21.70
FB1
0%
21.70
0-020
4.33
3.78
0%
3.78
0-021
102.83
109.53
0%
109.53
0-022
84.22
103.93
FB1
%0
103.93
0-023
2.58
4.35
fB
50%
2.18
0-024
3.01
5.07
50%
2.54
0-025
102.24
125.09
0%
125.09
0-026
0.31
0.50
0%
0.50
0-027
16.69
12.98
0%
12.98
0-028
16.77
13.05
0%
13.05
0-029
7.03
4.12
0%
4.12
0-030
2.46
1.91
0%
1.91
0-031
3.93
3.06
0%
3.06
0-032
0.98
0.77
0%
0.77
0-033
4.84
3.76
0%
3.76
0-034
1.31
1.02
0%
I:ICad ProjectstivtatderrcreekTowrishiptviS4 &Act 167 Mappingtdocst2018 PRP'UpdateVApr 2d19 UpdatelMT - MS4 Watershed
1.02
Areas Apr-2019.xls

0-035
5.76
4.12
0%
4.12
0-036
17.50
23.16
0%
23.16
0-037
10.92
13.04
0%
13.04
0-038
4.22
6.57
0%
6.57
0-039
0.39
0.63
0%
0.63
0-040
18.98
9.33
0%
9.33
0-041
2.58
2.55
0%
2.55
0-042
9.59
11.24
0%
11.24
0-043
2.98
1.56
0%
1.56
0-044
61.95
67.65
0%
67.65
0-045
12.43
18.54
0%
18.54
0-046
30.53
17.79
0%
17.79
0-047
35.10
23.21
0%
23.21
0-048
48.10
46.99
0%
46.99
0-052
47.13
45.65
0%
45.65
0-053
160.73
156.87
0%
156.87
0-054
17.83
23.17
0%
23.17
0-055
4.35
5.65
0%
5.65
0-056
8.23
10.70
0%
10.70
OP-001
29.89
25.32
0%
25.32
OP-002
19.88
20.75
0%
20.75
OP-003
21.09
26.06
0%
26.06
OP-004
4.60
5.99
0%
5.99
OP-005
18.79
20.82
0%
20.82
OP-006
6.46
8.40
0%
8.40
OP-007
13.35
8.14
0%
8.14
WillowCreek
Riparian Area
34.07
13.25
CONVERT? (see Table 4.e.)
2.81
1644.15
1554.14
Table Summary.
Net Overall TP:
1644.15 Ibs/yr
TPReductionRequired (5%):
82.21 Ibs/yr
TP After BMP Reduction:
1554.14 Ibs/yr
Tp Reduction Actual:
90.00 lbs/yr
%TP Reduction Actual:
5.47%
Notes/Abbreviations:
CONVERT1
Ag Field Retirement/Conversion from Ag to Meadow (See Tables 4.a., 4.d., and 4.e.)
CONVERT?
Riparian Forest Buffer/Conversion from Meadow to Forest (See Tables 4.a., 4.d., and 4.e.)
FB
Forest Buffer - sewersheds counted for 50% reduction (approx. 68 acres - see note below)
FB1
Forest Buffer - sewershed is tributary to FB but no reduction applied (see note below)
Note:
Chesapeake Bay guidelines limit the credited area tributary to a riparian forest buffer to two times the
buffer area when considering phosphorus reductions. Proposed riparian buffer area is 34 acres;
1:1CadProjectsIMaidencreekTownshiplMS4&Act 167Mappingldocs12018PRPUpdatelApr2019UpdatelMT-MS4Watershed
Areas Apr-2019.xls

TABLE 4.
WILLOWCREEKPRPMAIDENCREEKTOWNSHIP
DECEMBER2018
Table 4.a. Use Lake Ontelaunee TMDL Source Allocation to Estimate TP Loading Rate
TP
TMDL
TMDL Area
Ex. TP Load
Load Rate
Load Rate
Source
ha
tyr
t/yr/ha
Ib/yr/ac
Hay/Pasture
9.061
3.95
0.00044
0.39
Cropland
19,994
46.93
0.00235
2.09
Deciduous
Forest
14,481
1.34
0.00009
0.08
High Intensity
242
0.35
0.00145
1.29
Low Intensity
646
0.07
0.00011
0.10
MS4
54
0.13
0.00241
2.15
Notes:
1.
Sources taken fram the Lake Ontelaunee TMDL, Table ES-2. and are those that are in common with sources in O-015 and the
WillowCreekRiparianBuffer (seebelow).
2.
Loading Rates are computed to apply to specific O-015 sources in Table 4.b.
3.
Loading Rates are computed to apply to specific Willow Creek Riparian Buffer sources in Table 4.d.
4.
"t" is metric ton.
Table 4.b. Apply Loading Rate from Table 4.a. to Areas of Actual Existing Sources in O-015
TP
0-015
0-015
0-015
Load Rate
Area
Area
Ex. TP Load
Source
Ib/vr/ac
sf
ac
1b/yr
HayiPasture
0.39
288932
663
2.58
Cropland
2.09
685,697
15.74
32.96
1.29
High Intensity
1,100,000
25.25
32.58
LowIntensity
0.10
350,000
8.03
0.78
MS4
2.15
339,823
7.80
16.76
Totals
2,764,452
63.46
85.66S
See this value in Tables 1& 2
Table 4.c. Compute Proposed Loading with All Cropland as Hay/Pasture in O-015
TP
0-015
0-015
0-015
Load Rate
Area
Area
Prop. TP Load
Source
tb/yr/ac
sf
ac
1b/yr
0.39
974 629
Ha/Pasture
22.37
8.70
Cropland
2.09
0.00
High Intensity
1.29
1,100,000
25.25
32.58
LowIntensity
0.10
350,000
8.03
0.78
MS4
2.15
339,823
7.80
16.76
Totals
2,764,452
63.46
58.82
See this value in Table 3
Notes:
1.
Riparian
Riparian
Rip. Buffer
Load Rate
Buffer Area
Buffer Area
Ex. TP Load
Source
Ib/yr/ac
sf
ac
1b/yr
Hay/Pasture
0.39
1,484,094
34.07
13.25
Deciduous
Forest
0.08
0.00
Totals
1,484,094
34.07
13.25
See this value in Tables 1& 2
Table 4.e. Compute Proposed Loading with All Deciduous Forest in the Willow Creek Riparian Buffer
TP
Riparian
Riparian
Rip. Buffer
Load Rate
Buffer Area
Buffer Area
Ex. TP Load
Source
ib/yr/ac
sf
ac
Ib/yr
Hay/Pasture
0.39
0.00
Deciduous
Forest
0.08
1,484,094
34.07
2.81
Totals
1,484,094
34.07
2.81 See this value in Table 3
Notes:
1.
Hay/Pasture area is "zeroed out" and added to Deciduous Forest to simulate Hay/Pasture conversion to the riparian buffer.
I:1Cad PrajectsIMaidencreekTownshiplMS4 & Act 167 Mappingldocs12018 PRP UpdatelApr 2019 UpdateMT - MS4 Watershed Areas Apr-2019.xls

Table ES-1. Lake Ontelaunee Phosphorus TMDL Table (metric tons per year) (from EPA TMDL Lake Ontelaunee, Berks and Lehigh Counties, PA)
% of Total
Existing
% of Total
Allocated
Existing
Area
Allocated
Percent
Source
Existing
Aliocated
Ual
Load (tlyr)
(ha)
Load
reduction
(tlyr)
Load
(tyr*ha)
Load
(t/yr*ha)
(%)
Hay/Pasture
9.061
3.95
4.8
1.00
0.00044
66
0.00011
75
Cropland
19.994
46.93
57.0
0.00235
2.35
23.2
0.00012
96
Coniferous
1135
0.02
0.0
0.00002
0.02
0.2
0.00002
Mixed Forest
948
600
0.1
60'0
0.00009
60
0.00010
DeciduousForest
14.481
1.34
1.6
0.00009
1.34
13.2
0.00009
Unpaved Roads
44
0.37
0.4
0.00841
0.02
0.2
0.00042
196
Quarry
16
0.06
0.1
0.00375
0.00
0.0
0.00022
86
Transitional
1.490
16.27
19.8
0.01092
0.81
8.0
0.00054
56
Low Intensity
646
0.07
0.1
0.00011
0.07
0.7
0.00011
242
0.35
High Intensity
0.4
0.00145
0.05
0.5
0.00022
98
MS4
54
0.13
0.2
0.00232
0.01
0.1
0.00015
Point Source
3.65
4.4
2.76
27.2
24
Groundwater
6.06
7.4
1.52
15.0
75
Septic Systems
3.03
0.09
0.9
97
Total!
48,111
82.31
100.0
0.00171
10.13
100.0
0.00021
88
I:1Cad ProjectsIMaidencreekTownshipIMS4 & Act 167 Mappingldocs(2017 MS4 Renewal AppIPRP DocsIDec 2018 UpdatelMT - MS4 Watershed
Areas Dec-2018.xls

TABLE 5.
WILLOWCREEKPRP-MAIDENCREEKTOWNSHIP
EXISTINGBMPDATA
DECEMBER2018
OUTFALL
DATE
O&MREQUIREMENTS(T=TWP;
SHED AREA
EX BMP TYPE
LAT
LONG
PERMIT #
INSTALLED
P=PR/VATE)
0-001
VOC-B
40-26-53.91
-75-51-41.11
None
1991
Mow, clean, repair as needed (T)
0-003
DED(1)
40-26-45.76
-75-52-10.68
PA-R-10-C449
2007
Maintainamended soils; managevegetation (P)
0-003
DED(2)
40-26-38.01
-75-52-06.43
PA-R-10-C449
2007
Mow, clean, repair as needed (P)
0-003
DED(3)
40-26-30.93
-75-52-01.68
None
1985
0-003
DED(4)
40-26-42.21
-75-51-47.41
None
1992
Clean, repair as needed, manage vegetation (P)
0-004
VOC-B
40-27-07.72
-75-52-43.62
PA-S-10-C051
2003
Mow, clean, repair as needed (P)
0-013
DED
40-26-54.07
-75-53-55.23
None
2000
0-015
DED
40-26-35.27
-75-53-25.64
None
1991
0-020
FB
40-26-51.99
-75-53-05.43
None
1990
Manage woodland (T)
0-021
DED
40-27-08.39
-75-52-37.79
PA-S-10-C051
2003
Mow, clean, repair as needed (P)
0-025
DED(1)
40-26-49.10
-75-52-40.29
None
2000
Mow, clean, repair as needed (T)
0-025
DED(2)
40-27-01.35
-75-52-38.48
None
1998
Mow, clean, repair as needed (P)
0-025
DED(3)
40-26-41.63
-75-52-23.66
PAG2000607022
2004
Maintainamended soils; managevegetation (P)
0-027
FB
40-26-48.90
75-53-03.74
None
1995
Manage woodland (T)
0-028
FB
40-26-39.28
-75-52-55.40
None
1995
0-029
FB
40-26-48.08
-75-53-04.85
None
1995
0-030
FB
40-26-47.30
-75-53-03.31
None
1995
0-031
FB
40-26-45.08
-75-53-02.19
None
1995
0-032
FB
40-26-43.05
-75-53-00.76
None
1995
0-033
FB
-75-52-58.40
40-26-40.10
None
1995
0-034
FB
40-26-37.95
-75-52-57.18
None
1995
0-035
FB
40-26-35.02
-75-52-55.71
None
1995
0-036
DED
40-26-31.68
-75-52-38.19
None
1990
Mow, clean, repair as needed (P)
0-037
DED
40-26-30.19
None
-75-53-01.24
1988
0-041
DED
40-26-22.61
-75-52-43.47
None
1992
0-044
DED
40-26-17.06
-75-52-24.66
None
1994
Clean,repairas needed,managevegetation(P)
0-046
DED(1)
40-26-45.28
-75-51-12.62
None
1999
Mow,clean,repair as needed (P)
0-046
DED(2)
40-26-45.77
-75-51-06.46
None
1995
0-047
VOC-B
40-27-01.49
-75-52-22.28
None
1990
Clean, repair as needed, manage vegetation (P)
0-052
DED
40-26-24.62
-75-51-41.26
PA-R-10-C309R
2003
Mow, clean, repair as needed (P)
OP-007
VOC-B
40-26-50.49
-75-51-38.50
None
2007
Mow, clean, repair as needed (T)
ABBREV.:
DED -
Dry Extended Detention Basin
FB -
Forest Buffer
VOC-B -
Vegetated Open Channel - B Soils
NOTE:
All BMPs used for existing credit are functioning as designed.
I:1Cad ProjectsiMaidencreekTownshipiMS4 &Act 167 Mappingldocs/2017MS4 Renewal AppiPRP DocsIDec 2018 Update\MT - MS4
Watershed Areas Dec-2018.xls

APPENDIX B
DEP DOCUMENTATION

Cause Unknown (5), Other Habitat Alterations,
Revised 5/9/2017
Other Cause(s) of Impairment
Oher Habitat Alterations (4c)
Other Habitat Alterations (4c)
Other Habitat Aterations (4c)
Thermal Mofications (5)
Water/Flow Variability (4c)
Water/Flow Variabity (4c)
Other Habitat Ateratlons (4c)
Other Habitat Aterations Lci
Flonw Aherations (4c)
(en) sal
Appendix B-Pathogens (5j, Appendix E-Nutrients, Organic
Appendix B-Pathogens (5), Appendix E-Sitation (5)
Appendx B-Pathogens (5), Appendix E-Sitation (5)
Appendix B-Pathogens (5), Appendix E-Sitation (5)
AppendixE-OrganicEnichmentLowD.O. (4a)
μrpendix B-Pathogens (5. Appendix E-Nutrients (5)
TMDL Plen-Nutrients, Suspended Sof s (4a]
AppendixENutrients, Sitaion (5)
ApndixENutrients, Sitain (4)
ApndixENutrients, Sitation (5)
ndixENutiSitain ()
Appendix B-Pathogens (5)
AppendixE-Sitation (5)
EnrichmentLow D.0. (5)
Appendix E-Sitation [5)
Appendix B-Patrogers (5j
Appendix A-Metals (4a)
Appendix E-Nutrients (5)
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Acpendix B-Patroger3 (51
Appendix C-PCB (4a)
Appendix C-PCB (4a)
Requirement(s)
Asrendix C-PcB i4at
Impaired Downstream Waters or
Unnamed Tbutaries to Schuyikil River
Applicable TMDL Name
Unnamed Tritbutaries to Schuylk l Rive?
Unnamed Tributaries fo Life Lehigh
Schurylkit River PCB TMDL
Schuyikil RiverPCB TMDL
SchuvlklRiver PCB TMDL
Green Lane Reservoitr
Schuyikil River PCB TMOL
Bemhart Creek TMDL
Lite Lehigh Creek
Lile Cacoosing Creek
Perkiomen Creek
Litle Lehigh Creek
-ake Ontelaunee TVDL
Tulpehocken Creek
Schuykil River
Blue Marsh Lake
Swabia Creek
Schuylkil River
Schuylkil River
Antietam Creek
Schuykil River
Swabia Creek
Cacoosing Creek
Schuylkl River
Manor Creek
Maiden Creek
Laurel Rut
Willow Creek
Schuyikll River
Creek
Reason
IM'sS
Individual Permit
Required?
NPDESID
PAG133515
PAG133518
PAG133527
PA/133512
PAG133519
PAG133520
02:3133521
LOWER HEIDELBERG TWP
LAURELDALE BORO
KENHORST BORO
LONGSWAMP TWP
HEREFORD TWP
LEESPORT BORO
LOWERALSACE TWP
MAIDENCREEK TWP
Berks County
Page 28 of 160

3800-PM-BCW0100k
3/2017
PRP Instructions
ATTACHMENT B
DEVELOPED LAND LOADING RATES FOR PA COUNTIES1,2,3
TN
TP
TsS (Sediment)
County
Category
Acres
lbstacrelyr
lbs/acrelyr
lbs/acrelyr
impervious developed
10,373.2
33.43
2.1
Adams
1,398.77
pervious developed
44.028.6
22.99
0.8
207.67
impervious developed
9.815.2
19.42
1.9
Bedford
2.034.34
19,425
pervious deveioped
17.97
0.68
301.22
irmpervious devetoped
1.292.4
36.81
2.26
Berks
1 925.79
5.178.8
pervious developed
34.02
0.98
264.29
impervious developed
3.587.9
20.88
1.73
Blair
1.813.55
pervious developed
9.177.5
18.9
0.62
267.34
inpervious developed
10.423
14.82
2.37
Bradford
1,880.87
pervious developed
23,709.7
13.05
0.85
272.25
For land area outside of the urbanized area, undeveloped land loading rates may be used where appropriate. When using
the simplified method, DEP recommends the following loading rates (for any county) for undeveloped land:
TN -10 lbsiacre/yr
TP - 0.33 lbs/acre/yr
TSs (Sediment)-234.6Ibsiacre/yr
These values were derived by using the existing loads for each poliutant, according to the 2014 Chesapeake Bay Progress
Run, and dividing by the number of acres for the unregulated stormwater subsector.

A water impoundment structure that intercepts stormwater runoff then releases it to
These structures retain a
recently, these practices were designed specifically to meet water quantity, not
water quafity objectives. There is litle or no vegetation living within the pooled area
construction that temporarily store runoff and release it slowly via surface flow or
groundwater infitration following storms. Hydrodynamic Structures are devices
that are designed to remove sediments, nutrients, metals, organic chemicals, or oil
nor are outfalls directed through vegetated areas prior to open water release.
Dry extended detention (ED) basins are depressions created by excavation or
ar groundwater infiltration following storms. Dry ED basins are designed to dry out
Until
permanently. As such, they are similar in canstruction and function to dry detention
basins, except that the duration of detention of stormwater is designed to be
panet reports, other technical resources may be consulted for BMP effectiveness values. Note - TN = Total Nitrogen and TP = Total Phosphorus.
longer, theoretically improving treatment effectiveness.
BMP Description
improve quality
DEPARTMENT OF ENVIRONMENTAL PROTECTION
STORMWATER DISCHARGES FROM
and grease from urban runoff.
COMMONWEALTH OF PENNSYLVANIA
BMP EFFECTIVENESS VALUES
BUREAU OF CLEAN WATER
designed to i
Sediment
60%
10%
BMP Effectiveness Values
60%
45%
10%
20%
20%
5%
20%
Wet Ponds and Wetlands
Dry Detention Basins and
3800-PM-BCW0100m5/2016
Hydrodynamic Structures
Dry Extended Detention
BMP Effectiveness Values
 pennsytvanla
BMP Name
Basins

the longer term, jurisdictions must conduct yearly inspections to determine if the
A depression to form an infitration basin where sediment is trapped and water
infiltrates the soil. No underdrains are associated with infitration basins and
trenches, because by definition these systems provide complete infitration. Design
specifications require infiltration basins and trenches to be built in good soil, they
above ground, below ground, perimeter, etc. An organic media filter uses another
medium besides sand to enhance pollutant removal for many compounds due to
land. Runoff entering the fiter strip must be in the form of sheet-flow and must
Engineers are
To receive credit over
enter at a non-erosive rate for the site-specific soil conditions. A f.4 design ratio of
 enter at a non-erosive rate for the site-specific soil conditions. A 0.2 design ratio of
An excavated pit backfilied with engineered media, topsoil, mulch, and vegetation.
and through biologicai and biochemical reactions within the soil matrix and around
An excavated pit backfilled with engineered media, topsoi, mulch, and vegetation.
These are planting areas installed in shallow basins in which the storm Water runoff
stormwater
is temporarily ponded and then treated by filtering through the bed components.
is temporarily ponded and then treated by filtering through the bed components,
the root zones of the plants. This BMP has an underdrain and is in A or B soil.
flow length is recommended for 
are not constructed on poor sois. such as C and D soil types.
BMP Description
basin or trench is stil infiltrating runoff.
treatment urban filter strips.
urban filter strips.
reduction credit.
Sediment
95%
80%
56%
22%
55%
BMP Etfectiveness Values
80%
85%
%09
54%
45%
%0
75%
85%
40%
20%
25%
70%
Filter Strip Runoff Reduction
Bioretention - Raingarden
(C/D sois w/ underdrain)
Bioretention / Raingarden
Infitration Practices wi
Filter Strip Stormwater
(AB soils wi underdrain)
BMP Effectiveness Values
Filtering Practices
BMP Name
Sand. Veg.
Treatment

Open channels are practices that convey stomwater runoff and provide treatment
These are planting areas installed in shallow basins in which the storm water runoff
vegetation in the channel, subsoil matrix, and/or is infiltrated into the underlying
Open channels are practices that convey stormwater runoff and provice treatment
vegetation in the channel, subsoil matrix, and/or is infiltrated into the underlying
there is now treatment through the soil. A bioswale is designed to function as a
An excavated pit backfilled with engineered media, topsoil, mulch, and vegetation.
Runoff passes through either
Runoff passes through either
Pavement or pavers that reduce runoff valume and treat water quality through both
Water filters through open voids in the
With a bioswale, the load is reduced because, unlike other open channel designs.
slowiy infiltrated into the underlying soils or exits via an underdrain. This BMP has
Pavement or pavers that reduce runoff volume and treat water quality through both
This BMP has
is temporarily ponded and then treated by fitering through the bed components.
pavement surface to a washed gravel subsurface storage reservoir, where it is then
Water filters through open voids in the
pavement surface to a washed gravel subsurface storage reservoir, where it is then
Pavement or pavers that reduce runoff volume and treat water quality through both
Water filters through open voids in the
pavement surface to a washed gravel subsurface storage reservoir, where it is then
slowly infitrated into the underlying soils or exits via an underdrain. This BMP has
Pavement or pavers that reduce runoff valume and treat water quality through both
pavement surface to a washed gravel subsurface storage reservoir, where it is then
slowly infitrated into the underiying soils or exits via an underdrain. This BMp has
the root zones of the plants. This BMP has no underdrain and is in A or B soil.
siowiy infiltrated into the underlying soils or exits via an underdrain.
an underdrain, has sand and/or vegetation and is in A or B soil.
an underdrain, no sand or vegetation and is in C or D soil.
an underdrain, no sand or vegetation and is in A or B soil.
no underdrain, no sand or vegetation and is in A or B soil.
soils. This BMP has no underdrain and is in C or D soil.
BMP Description
includes bioswales.
as the water is conveyed, includes bioswales.
infitration and filtration mechanisms.
infiltration and filtration mechanisms.
infiltration and filtration mechanisms.
as the water is conveyed.
bioretention area.
Sediment
%06
70%
55%
50%
80%
70%
85%
BMP Effectlveness Values
70%
85%
10%
45%
75%
20%
50%
80%
50%
80%
10%
45%
70%
10%
45%
75%
50%
Vegetated Open Channels
Bioretention / Raingarden
(A/B soils Wio underdrain)
Vegetated Open Channels
Perneable Pavement wlo
Permeable Pavement wio
Permeable Pavement wio
(C/D Sois wi underdrain)
(AB Soils W/ underdrain)
(AB Soils wlo underdrain)
Permeable Pavement w!
3800-PM-BCW0100m 5/2016
(A/B Soils w! underdrain)
BMP Effectiveness Values
Sand or Veg.
Sand or Veg.
Sand or Veg.
BMP Name
Sand or Veg.
(C/D Soils)
(AB Soils)
Bioswale

siowiy infiltrated into the underlying soils or exits via an underdrain. This BmP has
Pavement or pavers that reduce runoff volume and treat water quality through both
pavement surface to a washed gravel subsurface storage reservoir, where it is then
Water filters through open voids in the
This BMP has
delivered downstream from an actively enlarging or incising urban stream. Applies
to 0 to 3rd order streams that are not tidaly infiuenced. if one of the protocols is
accompanied by trees, shrubs and other vegetation that is adjacent to a body of
values represent pollutant load reductions from stomwater draining through
(Note - the
estimates that 100 fully mature trees of mixed species (both deciduous and non-
usually
The riparian area is managed to maintain the integrity of stream channels
and shorelines, to reduce the impacts of upland sources of pollution by trapping,
DEP
To determine the amount of paliutant load reduction
Street sweeping must be conducted 25 times annually. Only count those streets
pollutant reductions consistent with the given BMP effectiveness values.
slowly infiltrated into the underiying soils or exits via an tunderdrain. 
no underdrain, has sand andior vegetation and is in A or B soil.
an underdrain, has sand andior vegetation and is in C or D soil.
BMP Description
infitration and filtration mechanisms.
infitration and fitration mechanisms.
increase as the trees mature.
buffers).
water.
Sediment
44.88
/sq!
85%
55%
50%
BMP Effectiveness Values
20%
%6
lbsift'yr
80%
20%
0.068
50%
15%
3%
Ibs/ftiyr
%08
20%
0.075
25%
10%
3%
(A/B Soils w/o underdrain)
Permeable Pavement wi
Permeable Pavement w!
3800-PM-BCW0100m 5/2016
(C/D Soils w/ underdrain)
BMP Efectiveness Values
Stream Restoration
Sand or Veg.
Sand or Veg.
Forest Buffers
Street Sweeping
BMP Name
Tree Planting

pollutant removal credits must demonstrate that they have developed and are
capture and proper disposal of solid material within the storm system to prevent
observed (ie., inspectian and removal of solids as recommended by the system
The entity using this BMP for
Examples include catch basins, stormwater inlet
weight of material collected for an annual period. Note - do not include
site-specific measurements (i.e., dry a sample of the wet material to find its
weight) or by using default factors of 0.7 (material that is predominantly wet
 Sum the total
, the material may be
 The default concentrations are shown in the
pollutant
For planning
refuse, debris and floatables in the determination of total mass collected.
site-specific
Attenatively, 
determine
BMP Description
BMp Effectiveness Values columns.
(ene
pollutant concentration factors.
assumed, but no higher than 80%.
discharge to surface waters.
least
from the sewer system.
(at
cancentrations.
throuigh this BMP.
sampled
litter).
1 - TN and TP
concentrations
Sediment
BMP Effectiveness Values
0.0006 for
sediment.
0.0012 for
organic
matter
0.0027 for
sediment,
0.0111 for
organic
matter
Storm Sewer System Solids
3800-PM-BC1W0100m 5/2016
BMP Efectiveness Values
BMP Name
Removal

APPENDIX C
RIPARIAN BUFFER - HABITAT RESTORATION REPORT

WILLOW CREEK HABITAT RESTORATION PROJECT
Sponsor: Fish & Wilflife Service Office: Northeast Fisheries Center
Project Partners: Pennsylvania Fish & Boat Commission, Eastern Brook Trout
Joint Venture, Berks Conservancy, Fleetwood High School Outdoor Club, Fleetwood
Middle School, Maidencreek Township Parks and Recreation Board, Maidencreek
Watershed Association, Reading Area Community College, Reading Area Water
Authority, Schuylkill River National and State Heritage Area, Trout Unlimited
(Tulpehocken Chapter), Maidencreek Township Authority, Boy Scouts of America
Troop 183
Project Costs:
Total Cost - $121,800 - projected $161,246.36 - actual
Non Federal Amount - $71,800 - projected
$74,031.70 -- in kind service and actual paid by Twp.
$37,214.66 -- additional expenses covered by other grants
Federal Amount - s0
Funding Sources:
Partner
Activity
Cash Match
In Kind
Totals
PA Fish Commission
Materials for
7,214.66
32,500.95
39,715.61
fish habitat,
project
(CHIP
oversight &
Grant)
design
Maidencreek
Materials,
16,919.38
12,703.17
29,622.55
Township
labor,
equipment
Schuylkill River
Equipment
30,000.00
30,000.00
Heritage
Rental,
riparian
(SRGA
planting,
Grant)
materials
PA EBTJV
Equipment
50,000.00
50,000.00
Rental,
riparian
planting,
materials,
signs
Berks County
Riparian
982.56
982.56
Conservancy
Planting

design &
oversight,
trees and
shrubs
Maidencreek
Volunteer
427.20
427.20
Watershed
hours for
Association/Kutztown
buffer
University
planting
Trout Unlimited
Volunteer
1,110.72
1,110.72
hours for
buffer
planting
Fleetwood High
Volunteer
4,902.12
4,902.12
School/Outdoor Club
hours for
buffer
planting
Fleetwood Middle
Volunteer
2,221.44
2,221.44
School
hours for
buffer
planting
Reading Area
Volunteer
875.76
875.76
Community College
hours for
buffer
planting
Reading Area Water
Volunteer
1,388.40
1,388.40
Authority
hours for
invasive
species
removal
104,134.04
57,112.32
161,246.36
Action Strategy Implemented In the Project:
Improve fish habitat and stabilize stream bank to narrow and deepen the channel
which will encourage macroinvertebrate habitation and reproduction.
Plant a riparian buffer to provide shade so temperatures stay at trout suitable
levels all year. Promote diversity and overall abundance of flora and fauna.
Educate and inform the public of the project
Provide angling opportunities.
Priority Score of the Sub-Watershed: Gray

State Wildlife Action Plan Listed Habitat Conservation Goal Supported by the
Project: The restoration actions will help restore the Willow Creek, a high priority
lotic and riparian habitat and improve water quality in the Schuylkill River
Watershed.
Methods Used: Used volunteers and Maidencreek Township Road Crew to re-
vegetate the riparian buffer and install fish habitats. PA Fish Commission
provided project oversite for the habitat installation and Berks Conservancy
provided project oversite for the riparian buffer design and installation. Educated
the public through mailings, newspaper articles and informational kiosks in the
project area.
Project Outcomes: Fish habitat and stream bank stabilization were addressed by
Maidencreek Township Road Crew and the PA Fish Commission installing l6 mud
sills, 100 random boulders and 65 deflectors along 1.2 miles of the Willow Creek.
These devices will help narrow and deepen the channel which will encourage
macroinvertebrate habitation and reproduction.
A riparian buffer (native trees and shrubs) was planted in six acres by Maidencreek
Township Road Crew, the Berks Conservancy and volunteers. Vegetation was
allowed to grow without cutting and invasive species were removed from plantings
by volunteers.  Once mature, the trees will provide shade so temperatures stay at
trout suitable levels all year. Grass was cut to provide a twelve foot wide trail for
access to the stream for fishing.
Pamphlets were distributed to everyone along the stream corridor via mail and
several articles were published in the Township newsletters as well as local
newspapers. This spurred additional interest in the project and two members of Boy
Scout Troop 183 installed three bat boxes and fifteen birdhouses within the project
area.
Informational signs were installed throughout the project area to commemorate the
effort and educate trail users on the project.
PA Fish Commission will continue to monitor the site after completion. An Open
Space Management Plan was created and adopted so future generations have a
manual to follow.
Brook Trout Population Response to the Project Outcome: Sampling was taken in
July 2014 and there has been no significant increase in trout population to date.
However, stream bank erosion has stabilized and the riparian buffer is growing at a
steady pace.
Number of Stream Miles: 1.2 miles

2010-2014
Ow Creek Resiora.ion Pro,ec:
Listof Accomplishments
> Larry Lloyd of the Berks Conservancy treated noxious weeds on June 10,
September 12, 13, and 14, 2011 between Schaeffer Road to 150ft further
downstream from the tributary at the playground on the South side of the
creek. Weeds treated included poison hemlock, Canada thistle, crown
vetch, mile a minute, teasel, bindweed, tree of heaven and Japanese
knotweed. The Township Road Crew mowed along areas of the stream to
prevent thistle from going to seed in untreated areas.
> A pamphlet was created by John Buzzar of PA Fish and Boat. The pamphlet
titled, "Willow Creek Habitat Restoration Project -- Improving Your Water
Resources" and mailed by the Township staff to the ninety property owners
along the stream corridor on June 22, 2011. It has also been posted on the
Township website and put at the municipal building for residents and
visitors to take.
> Fish habitats and stream bank stabilization were installed in the area from
Schaeffer Road to the Cornerstone Drive Playground by PA Fish and Boat
and Township Road Crew June 20 to June 29, 2011.
> John Buzzar of PA Fish and Boat attended the July 14, 2011 Maidencreek
Township Board of Supervisors meeting to answer questions from the
public.
 A riparian buffer was designed by Larry Lloyd of the Berks Conservancy.
The Township ordered 450 trees and shrubs for the riparian buffer. The
Township Road Crew dug holes and volunteers installed the plants on
October 15, 2011 on the Cornerstone Drive side of the stream from
Schaeffer Road to the Cornerstone Playground. Volunteer hours totaled
253.5 hours. Volunteers from the Fleetwood High School and Middle School
(185.5 hours), Kutztown University (20 hours), and Trout Unlimited (48
hours) participated and were overseen by the Berks Conservancy and PA
Fish and Boat.
> May 25, 2012 a walking trail was marked out by Keith Shuman of the
Maidencreek Township Road Crew and Larry Lloyd and was mowed by the
Township Road Crew.

2010-2014
W1 ow Cree<Restcra: on 3ro,ec!
> Larry Lloyd of the Berks Conservancy treated noxious weeds on June 8, and
September 11-13, 2012. The June treatment was to remove vegetation that
was growing around the plantings between Schaeffer Road to 15oft further
downstream from the tributary at the playground on the South side of the
creek, some of which was done chemically and some pulling by hand. The
September treatment occurred between the playground at Cornerstone
Drive and Route 73. Weeds treated included poison hemlock, Canada
thistle, crown vetch, mile a minute, teasel, bindweed, tree of heaven and
Japanese knotweed. This treatment was in preparation for fall planting of
600 trees and shrubs.
> The pamphlet created by John Buzzar of PA Fish and Boat titled, "Willow
Creek Habitat Restoration Project - Improving Your Water Resources" is
posted on the Township website and put at the municipal building for
residents and visitors to take. All new homeowners receive this information
upon moving into the Township and pamphlets were also distributed at
Community Day.
> June 26 to 29, 2012 the Township Road Crew mowed the meadow along
the stream.
> July 1 to 6, 2012 the Township Road Crew staged all materials in meadow
for the fish habitat structures.
> Fish habitats and stream bank stabilization were installed in the area from
the Cornerstone Drive Playground to Route 73 by PA Fish and Boat and
Township Road Crew between July 9 and July 12, 2012.
> July 11 and 12, 2012 the stream bank was planted with a 50/50 mix of
annual rye grass and stream bank rye grass under the direction of Larry
Lloyd.
> The Township Road Crew dug the holes on October 1 to 4, 2012 and
volunteers installed 600 trees and plants on October 13 and 20, 2012 on
the Cornerstone Drive side of the stream from Cornerstone Drive
Playground to Route 73.
> The Township Road Crew set boulders in the stream in February 2013. This
completed the installation of all trout habitat structures.
> This project has drawn the attention of local Boy Scout Troops and in
March, one leader, Geoffrey Price, constructed and installed three bat
boxes in the project limits. The Township paid for all materials.

2010-2014
> From March 21, 2013 through April 13, 2013, the Township purchased and
planted another 600 trees in the riparian buffer area with the help of
volunteers from Reading Area Community College.
> The Road Crew mowed and maintained the grass trail through the project
in May, June and August of 2013.
> In June and September of 2013 Larry Lloyd of Berks Conservancy pulled
invasive species from along the Willow Creek.
> The Township purchased 29 trees, each 12 feet in height, in September
2013 and were planted by the Township Road Crew in October 2013 along
the stream.
> A local Boy Scout, Brandon Beshore, proposed an Eagle Scout Project to
build 15 bird houses along the Willow Creek from Cornerstone Drive to
Schaeffer Road. The Township Park and Recreation Board approved the
project and Brandon Beshore completed the project in October 2013, with
all materials purchased by the Township.
in May, June and August of 2014.
> In June and September of 2014 Larry Lloyd of Berks Conservancy, along
with interns from Albright College and volunteers from the Reading Area
Water Authority pulled invasive species from along the Willow Creek.
> September 15 and 16, 2014 Township Road Crew installed informative signs
along the walking trail of the Willow Creek.
 Larry Lloyd of the Berks Conservancy will complete the riparian planting of
56 native trees in October 2014 to replace those lost to animal activity

OPINION
as a riparian buffer from sur.
rounding residences.
The Berks Conservancy
helped the Fish and Boat Com-
mission and the towmship
develop a plan to manage Maid-
encreek's milelong, 44 acre
riparian buffer along the creek.
Between fall 2011 and spring
2013, more than l,900 5-foot-
tall native trees were planted.
Participating in the tree
planting were the Fish and
Boat Commission; Maiden-
creek Township supervisors
and management staff; the
towmship Parks and Recreation
Board; Conservancy staff and
members; the Maiden Creek
Watershed Association; stu-
dents from Kutztown Univer-
sity, Albright College, Reading
Area Community College and
Exeter High School; Tulpe-
hocken Trout Unlimited; and
Plantsand treesalongWilliowCreekinMaidencreek Township
students from the Fleetwood
helpprotectthewaterwayfromsedimentandotherpollutants
School District's elementary
school, middle school and high
COURTESYOF BERKS COUNTY CONSERVANCY
school, who participated in all
four plantings from start to
It takes a community
The Willow Creek runs
finish.
through Ruscombmanor
This extraordinary participa-
Township, Fleetwood, and
tion proved contagious and was
Maidencreek and Ontelaunee
the impetus for other positive
to clean a stream
townships on its way to join the
actions for water quality to be
Maiden Creek near its confiu-
undertaken inthe watershed.
ence with the Schuylkill River.
An upstream dairy farmer :
The Willow Creek has stream
installed agricultural best
segments that support breed.
management practices to keep
BY LARRY LLOYD
ing native brook trout. Native,
animal manures from mixing
as opposed to stocked, trout
with storm water runoff and
T is puzzling how water, our most precious
are bio-indicators of good wa-
entering the stream, reducing
and essential natural resource, is at the same
ter quality. Their presence in
the nutrient load in the stream.
time our most taken-for-granted gift. With
a stream means the process of
Downstream, the Maiden.
the human body composed of greater than 95
cleaning water is functioning
creek Township Authority and
percent water and with all aspects of heaith
The Willow Creek, like many
its staff planted more than 85
and life on planet Earth dependent on water, it
streams, is an impaired water-
native trees, averaging 12 feet
would stand to reason that clean, sustainable
way, primarily because of storm
tall, creating a riparian buffer
drinking water would be a top priority. Do you
Larry oyd is a
runoff from residential, com-
on their portion of the creek. In
know where your drinking water comes from
mercial, industrial and agricul-
senior ecologist with
addition, Giorgio Foods plans
the Berks County
and how it got there?
tural impervious surfaces.
to plant native trees in the fall
Today, there are many stressors to water gual-
Conservancy.
Instead of feeling daunted by
along its portion of the creek.
ity, and our lack of attention and lack of action to
these many challenges, Maid-
Congratulations to all the
protect our water quality is negatively impacting the availability
encreek officials and the state
partners for participation
of clean water.
Fish and Boat Commission
in this Willow Creek water
Water is a community value, because it takes respect and action
procured grant funding to help
quality project and for dem-
by all members of our communities to ensure quality drinking
improve the water quality of
onstrating the importance of
water. What we drink is the result of positive and negative human
the Willow Creek by installing
talking individual and collec-
behaviors on the land, and everyone is downstream from someone.
aguatic habitat structures to
tive responsibility for the water
There are some local communities in Berks County that are
reduce erosion and the accu-
quality in their watershed.
taking their link in the chain of protecting our water seriously.
mulation of sediment, and by
Everyone can play a part in and
Anong those forward-thinking communities using best manage-
planting native trees along the
add value to the sustainability
ment practices to enhance drinking water quality, Maidencreek
stream to shade and cool the
of elean drinking water. Catch
Township is a shining and instructive example.
water, stabilize soil and serve
the wave. C
We welcome letters and commentary, Letters should be brief (about 2oo words) and should respond to a news
item published in Berks Country or address a specific topic of interest to the rural community. For verification purposes, include
your full name, the municipality in which you reside, and phone number (day and evening). Online: Go to berkscountry.readinge.
agle.com, chick on the "Submit News" tah. welprt "T attore tn tha aitar" mmnsa, n

APPENDIX D
WILLOW CREEK PROJECT MANAGEMENT PLAN

MAIDENCREEKTOWNSHIP OWNED PROPERTIES
WILLOW CREEK PROJECT MANAGEMENT PLAN
1.
Background, overview
A. Project and Property Summary - open space in multiple residential subdivisions-
Blandon Meadows, Willow Gardens, Creekside Manor, Maiden Creek Estates,
Georgetown Village
B. Donor wishes - open space in Maidencreek Township
Property Description
A.
Location - Road Map
B. 
Size - 44.19 acres with ~ 5,250 linear feet of the main stem Willow Creek and ~
2,500 linear feet of an unnamed tributary of the Willow Creek. ; see also, aerial
map , tax parcel map , topo map, approved Subdivision Plan map
C. Watershed - Primary watershed -- Schuylkill River; Secondary watershed -
Maiden Creek ; Local watershed - Willow Creek, a Cold Water Fishery ( CWF ) ;
see also the Maiden Creek Watershed map with the Willow Creek Project
location
D. Historic Land use - Farm pasture
E.
Current Land Use - open space in residential subdivisions
F. $
Species of concern - breeding brook trout
G. 
Site Specific Studies - Pennsylvania Fish and Boat Commission as basis for grant
award to Maidencreek Township for Expanding Brook Trout within Willow Creek
as per the NFHAP and PA ABTJV State Conservation Strategy
Management Goals and Objectives
A. Real Estate Aspects
1. Agreements - 20 year Operations and Maintenance Agreement within grant
award which is applicable to the main stem of the Willow Creek; see also
the grant award agreement
2.
Easements - Buckeye Pipeline and UGl; see also the Subdivision Plan map
Storm water outfalls - see MS4 Stormwater Management Plan
4.
Liability/Structures - playground and court and floodplain
Neighbor Relations- No Homeowners Association. This Management Plan is
being developed in part to present to all Township residents the Township's
intended uses for this Township owned property
6. School District - Fleetwood

7. Property Taxes -N/A
Municipality- Maidencreek Township
9.
Municipal Zoning- High Density Residential
10. Title Report - clear
11. Environmental Assessment, Phase I- not required
12. Insurance- Township coverage ( PIRMA for Liability and EMC for Property)
B. Ecological Aspects
Zone 1 - Riparian area/buffer of unnamed tributary of the Willow Creek ,
between Cornerstone Drive and Park Rd. ; 6.91 acres
1. Resource Management objectives - manage as wooded riparian buffer
with no public access
2. Resource Management considerations --
a. Encroachment by neighboring residences; e.g. dumping of yard waste
and failure to respect property boundaries
b. Stormwater runoff from neighboring residences
3. Resource Management actions-
a. Identify and mark property line boundaries
b. Contact neighboring residences by mail to inform neighbors of the
Township's desires for the Township property and include educational
materials - " Caring for your streamside property" and " When it rains , it
drains"
Zone 2 - playground and court area , north of Cornerstone Drive; 1.2 acres
1. Resource Management objectives- manage for playground activities and
active recreation
2. Resource Management considerations - provide a safe environment with
vegetation management suited to playground activities
3. 
Resource Management actions-
a.
Perform regular maintenance
b.
Marking of property boundaries
c.
Posting of Regulations
Zone 3 - ~ 10 foot wide mowed access trail; 3.34 acres
1. Resource Management objectives -- manage as public access corridor/trail in
vicinity of the property line boundary; in addition, establish a few trail spurs
from the main corridor/trail to the stream to provide stream access

2. Resource Management considerations - encroachment by neighboring
residences ; e.g. dumping of yard waste and failure to respect property
boundaries
3. Resource Management actions
a. Identify and mark property line boundaries
b. Contact neighboring residences by mail to inform neighbors of
Township's desires for the Township property and include educational
materials - " Caring for your streamside property", " When it rains , it
drains", “"Willow Creek Habitat Restoration Project"
c. Identify and mark mowing limits
Zone 4 - Riparian area/buffer of Willow Creek, mainstem between Schaeffer Rd
and Main St.; 32.74 acres
1. Resource Management objectives - manage as riparian buffer, as per 20
year O&M Agreement through grant award. Provide a few trail spurs from
the main public access corridor/trail to the stream to provide for stream
access
2. Resource Management considerations
a.
In cooperation with Pa. Fish and Boat Commission, monitoring and
maintenance of installed practices as part of Grant Agreement
b. Establishment of riparian buffer with special attention to installed trees
and shrubs and also invasive species which may negatively effect riparian
bufferfunction
c. Provide access to stream
3. Resource Management actions -
Identify and mark mowing limits for trail spurs
b.
Monitor and maintain installed stream and streambank practices
c.
Monitor and maintain riparian buffer; develop program for dealing with
alien invasive species and Pa. Noxious weeds.
d. Monitor effects of increased usage and develop program for dealing with
emerging issues. E.g. increased trash ; durability of trail surfaces
Zone 5 - Parking locations for access to project area ( note , to date, no parking
areas have been chosen ; TBD )
1.
 Resource Management objectives- manage for parking to provide public
access
2. Resource Management considerations - floodplain proximity and
stormwater runoff from impervious surfaces

3. Resource management actions - identify possible locations and analyze
relative to floodplain ; consider pervious surfaces and stormwater retention
for any parking lot
C. Programmatic Aspects
1. Public access - open to all residents in Zones 2,3,4,5
2. Permitted uses - fishing with valid Pa, Fish and Boat fishing license in Zone 4;
no hunting and trapping throughout
3. Authorized users - pipeline maintenance
4. $
Signage - to be determined; make a note on sketch plan and with photo
and photo map entry
5. Rules posting and site maps - playground regulations and Willow Creek
riparian buffer regulations( to be determined ) , make note on Sketch map
and with photo and photo map entry
6. Education - participation in Willow Creek Project by the Fleetwood School
District; project area could be made available for field trips by Fleetwood
School District
7. Research - ongoing by Pa. Fish and Boat Commission
8. Surveillance /Security - none currently; any future installation should be
noted on Sketch Map and with photo and photo map entry
IV
Operations and Maintenance
1.
Work Plan, 3-5 year
2.
Management Fund and/or Annual Stipend- Park and Rec Board has annual
budget
Work Plan Project budgets
4. Staff and Board(s) responsibilities
V.
Reporting
1. internal annual report form - playground form
a. photo stations with photos annually; see also Photo stations map
2. owned property reports files

APPENDIX E
PRP MAPS - EXISTING & PROPOSED CONDITIONS

1//8 aivn
PRP MAP - EXISTING CONDITIONS
MAIDENCREEK TOWNSHIP
BERKS CO., PA.
(5) SUUBUW-3 MA (COH-1 MGHY
MS4 REQUIREMENTS TABLE
REQUIRDVENTS
EXISTING DRY EXTENDED DETENTION BASIN
STORM SEWERSHED (OUTFALL)
"READING"URBANIZED AREA
STORM SEWERSHEDID
MUNICIPAL BOUNDARY
FOREST BUFFER
EXISTING STORMWATER COLLECTION SYSTEM
GSTORM PIPE AND FLOW DIRECTION
LEGEND
EXISTING STREAM (IMPAIRED-PATHOGENS)
GCHANNEL
TOWNSHIP ROAD
#物脚STATE ROAD
EXISTING
EXISTING
EXISTING
MAIDENCREEK TOWNSHIP
SYSTEMS DESIGN
ENGINEERING

PRP MAP - PROPOSED CONDITIONS
MAIDENCREEK TOWNSHIP
BERKS CO., PA.
MS4 REQUIREMENTS TABLE
REQUAREMENTS
DR
AGRICULTURAL CONVERSION BMP
STORM SEWERSHED (OUTFALL)
STORM SEWERSHED ID
MUNICIPAL BOUNDARY
FOREST BUFFER
AGC
EXISTING STORMWATER COLLECTION SYSTEM
LEGEND
(IMPAIRED-PATHOGENS)
EXISTING CHANNEL
EXISTING STREAM
TOWNSHIP ROAD
##STATEROAD
EXISTING
WELOW CPEEK MATERSHED
MAIDENCREEK TOWNSHIP
SYSTEMS DESIGN
Loke Ontelaunet
ENGINE :RING.
URBANIZED AREA

APPENDIX R
MCM #6 - POLLUTION PREVENTION / GOOD HOUSKEEPING
MS4 TMDL PLAN

Maidencreek Township, Berks County
MS4 TMDL Plan
Lake Ontelaunee TMDL
Prepared for
MAIDENCREEK TOWNSHIP
BOARD OF SUPERVISORS
1 Quarry Road
Blandon, PA 19510
Maidencreek Township, Berks County, PA
June 29, 2017
Project 17-0019-0191
SYSTEMSDESIGN
SDE
"A Passion for Engineering Excellence"
ENGINEERING,INC
sdei.net

Maidencreek Township, Berks County
MS4 TMDL Plan
Lake Ontelaunee Watershed
1.0
Introduction
This MS4 TMDL Plan has been prepared by Systems Design Engineering, Inc. (SDE), for Maidencreek
Township, Berks County, Pennsylvania (the Township), as part of the Township's obligations under its
NPDES PAG-13 MS4 permit (Permit Number PAG-13-3521). Maidencreek Township has been operating
under a permit since 2003 and the Notice of Intent (N0l) for the 2018 permit is due in September 2017.
This TMDL Plan is a component of Maidencreek Township's NOl, and is required due to a small portion
of the Township's MS4 system being located within the watershed of Lake Ontelaunee, which has a
TMDL specified for nutrients and suspended solids. The MS4 contributing to Lake Ontelaunee in
Maidencreek Township consists of three (3) outfalls.
This plan will provide background wasteloads and propose a strategy for implementation of best
management practice (BMP) control measures, with the intention of demonstrating a reduction in
applicable pollutant loads as specified in the Lake Ontelaunee TMDL document.
2.0
TMDL Summary
A Total Maximum Daily Load (TMDL) report was prepared by Tetra Tech, Inc., for the U.S. Environmental
Protection Agency (EPA) for the Lake Ontelaunee watershed, Berks and Lehigh Counties, Pennsylvania,
on August 9, 2004. The report, referred herein as "TMDL report" is entitled "Total Maximum Daily Load
For Nutrients and Suspended Sediment Lake Ontelaunee, Berks and Lehigh County, Pennsylvania".
The TMDL report indicates that the lake is impaired due to nutrients and suspended solids. Contributing
to the impairment are agriculture, municipal point sources, on-site wastewater treatment systems, and
urban runoff. Table 1-1 is reprinted from the TMDL report:
Table 1-1. 303(d) Listing for Lake Ontelaunee
Assessment ID
Causes
Listing
TMDL
Size
Use
Date
Date
Assessed
Lake Ontelaunee
Agriculture/Nutrients
1996
2005
1080 acres
Aquatic Life
19910001-0004-LAK
Agriculture/Suspended Solids
Municipal Point Source/Nutrients
Municipal Point Source/Suspended
Solids
On site Wastewater/Nutrients
On siteWastewater/Suspended Solids
Urban Runoff/Storm Sewers/Nutrients
Urban Runoff/Storm Sewers/Suspended
Solids

2.1
Nutrient Impairments
Nutrient impairments in water bodies tend to lead to excessive algal biomass which in turn reduces
content of dissolved oxygen, potentially causing death of aquatic organisms. The TMDL report indicates
that phosphorus is the limiting nutrient for algae control. The two largest nonpoint sources of the
phosphorus nutrient are croplands and transitional areas, with point sources accounting for around 4.5
percent of Total Phosphorus. Nitrate is another nutrient that is often present with phosphorus
contamination, and is of particular concern in this case, since Lake Ontelaunee is a public water supply.
However, the report indicates that water quality data do not indicate nitrate concentrations in excess of
EPA established maximum contaminant levels, leading to a determination that a nitrate TMDL was not
necessary.
2.2
Sediment Loading
Sediment loading is a concern as it reduces storage capacity in the lake and impairs fish food sources
and spawning areas. Excess sediment in drinking water supplies can lead to odor and taste issues, and
can interfere with proper water treatment facilities. The TMDL report indicates that, as with nutrients,
are also significant sediment contributors. Point sources are responsible for less than one percent of the
sediment load.
2.3
Affected Municipalities
Table 2 lists municipalities and counties subject to the TMDL within the same Hydrologic Unit Code
(HUC) 02040203.
Table 1. Municipalities Subject to the Lake Ontelaunee TMDL for HUC 02040203
Municipality
County
Municipality
County
Albany Township
Berks
Maxatawny Township
Berks
Greenwich Township
Berks
Perry Township
Berks
Kutztown Borough
Berks
Richmond Township
Berks
Lenhartsville Borough
Berks
Rockland Township
Berks
Lynn Township
Lehigh
Windsor Township
Berks
Lyons Borough
Berks
Weisenberg Township
Lehigh
Maidencreek Township
Berks
3.0
Watershed Characteristics
According to the TMDL report, the Lake Ontelaunee watershed consists of approximately 123,104 acres
of land in Berks and Lehigh Counties. The lake itself has a surface area of approximately 1,100 acres.
to the lake from the Maidencreek Township MS4 are from within this HuC area. Figure 1 is a graphical
depiction of the watershed, from the TMDL report.

SCHUYLKILL
COUNTY
LEHIGH
Ontelaunee Creek
COUNTY
 Pine Creek
Stony Run.
Malden Creek
* Lenhartsville
Maiden Creek
BERKS
COUNTY
Sacony Creek
* Kutztown
Bailey Creek
uordol
Moselem Creek
Lyons *
* Laureldale
* Alsace
Townships
/ 303(d) Listed Segments
* Reading
LakeOntelaunee
Streams
County Boundaries
10 Miles
Lake OntelauneeWatershed
Figure 1. Lake Ontelaunee Watershed (from USEPA Total Maximum Daily Load For Nutrients and
Suspended Sediment Lake Ontelaunee Berks and Lehigh County, Pennsylvania, 8/9/04)

Lake Ontelaunee supplies drinking water for the City of Reading and several surrounding municipalities.
Fishing and hunting are primary recreational uses on and around the lake. The majority of the
watershed is rural, dominated by agriculture.
The Maidencreek Township MS4 storm sewersheds within the Lake Ontelaunee watershed are depicted
in Figure 2. Of the 123,104-acre watershed to the lake, a total of approximately 98 acres, or 0.08
percent, contribute from the storm sewersheds, and only about 57 acres (0.05 percent) contribute from
the Urbanized Area within Maidencreek Township. Figure 3 depicts the areal breakdown to the three
outfalls, and areas to the outfalls are tabulated in Table 2.
Table 2. Storm Sewersheds Tributary to Lake Ontelaunee from Maidencreek Township UA
Stormshed/Outfal!
Area, Ac.
0-049
11.1
0-059
62.9
0-051
23.6
Total
97.6
Figure 4 superimposes Figure 2 onto Figure 1, to depict a relative comparison of drainage area size. The
lake's watershed.

Ontslaunee
O-051
O-050
0049
STORMSHED
TO CUARRY
LEGEND
MS4 OUTFALL & ID 普
EXISTING STREAM
STORMSHED ID 鲁
STORMSHED BOUNDARY
G-1
EXISTING STORMWATER COLLECTION SYSTEM
"READING" URBANIZED AREA
EXISTING STORM PIPE AND FLOW DIRECTION
LAKE ONTELAUNEE WATERSHED
WITHIN URBANIZED AREA
EXISTING DRAINAGE DITCH
Figure 2. Maidencreek Township MS4 Area within Lake Ontelaunee Watershed

LAKE ONTELAUNEE
STORMSHEDTOOUTFALLO51
APPROX. 23.6 ACRES
LAN
O-051
SR 1005
YELLOWHIGHLIGHT IS
AREAUNDER CONTROL
AGRICULTURE
OF MAIDENCREEK
TOWNSHIP(TOWNSHIP
STATE
ROAD RIGHT-OF-WAYY
0-051
GRICUA
APPROX. 3.8 ACRES)
STATE RIGHT-OFWA Y (S.R. 0073)
ROUTE
GRICULTURE
0-050
IMPERMOUS
STORMSHED TOOUTFALLO50
APPROX. 62.9ACRES
LAWN
-3004
O-050
LAN
JARRY
TOWNSHIP LINE
MAIDENCREEK
0-049
TOWNSHIP
QUARRY
AGRICULTURE
URBANIZED AREA
LAMN
6563
MPERMOUS
ONTELAUNEE
RESIDENTIAL
STORMSHED TO QUARRY
RIVATE
TOWNSHIP
LAMN
STORMSHEDTOOUTFALLQ49
150
300
300
APPROX11.1ACRES
REv. 6/21/17
STORMSHED AREAS
SYSTEMS DESIGN
LEGEND
SDE
MS4 OUTFALL & ID 种
STORMSHED BOUNDARY
MAIDENCREEK TOWNSHIP
TO LAKE ONTELAUNEE
ENGINEERING,INC
STREET RIGHT-OF-WAY
AAAF5DEFFSPCRTA1O533
STORMSHED ID *
"READING" URBANIZED AREA
MAIDENCREEKTWP.,BERKSCO.,PA
F4ONE.6*O 916.8500 FAX.6'0 914.B50!
SCHLYU3IHA9ENO.PA57O38SS54O
Figure 3. Maidencreek Township MS4 Area Portion of Lake Ontelaunee Watershed

SCHUYLKILL
COUNTY
LEHIGH
Ontelaunese Crcek
COUNTY
Creek
Kistler
Pine Creek
Stony Run
Maiden Creal
* Lenhartsville
Maiden Creek
BERKS
COUNTY
Sacony Creek
* Kutztown
 Sacony
Bailey Creek
Topton
Moselem Creek
Lyons *
Approx,RelativeSizeof
MaidencreekTownship
MS4 Drainage Area
Figure 4. Maidencreek Township MS4 Area Relative to Lake Ontelaunee Watershed

4.0
Waste Load Allocations
The following tables are reprinted from the Lake Ontelaunee TMDL report, and depict various load and
waste load allocations by pollutant. Recall that phosphorus was determined as the controlling nutrient
in the nutrient loading component of the TMDL - nitrates were determined to be within acceptable
levels.
Table ES-1. Lake Ontelaunee Phosphorus TMDL Table (metric tons per year)
TMDL (t/yr)
LA (t/yr)
WLA (t/yr)
Mos (t/yr)
10.65
7.36
2.77
0.52
Table ES-2. Lake Ontelaunee Phosphorus TMDL, Source Allocation Summary (metric tons/year)
% of Total
Existing
Area
% of Total
Existing
Allocated
Allocated
Percent
Source
Existing
UaL
Allocated
Ual
(ha)
Load (t/yr)
Load (tyr)
reduction
Load
(t/yr*ha)
Load
(tlyr*ha)
(%)
Hay/Pasture
9,061
3.95
4.8
0.00044
1.00
66
0.00011
75
Cropland
19,994
46.93
57.0
0.00235
2.35
23.2
0.00012
Coniferous
1.135
0.02
0.0
0.00002
0.02
0.2
0.00002
Mixed Forest
0.09
0.1
0.00009
60'0
6'0
0.00010
Deciduous Forest
14,481
1.34
1.6
600000
1.34
13.2
600000
Unpaved Roads
44
0.37
0.4
0.00841
0.02
0.2
0.00042
Quarry
16
0.06
0.1
0.00375
0.00
0.0
0.00022
86
Transitional
1,490
16.27
19.8
0.01092
0.81
8.0
0.00054
Low Intensity
646
0.07
0.1
0.00011
0.07
0.7
0.00011
High Intensity
242
0.35
0.4
0.00145
0.05
0.5
0.00022
MS4
54
0.13
0.2
0.00232
0.01
0.1
0.00015
Point Source
3.65
4.4
2.76
27.2
24
Groundwater
6.06
7.4
1.52
15.0
75
Septic Systems
3.03
3.7
60'0
6'0
26
Tota!
48,111
82.31
100.0
0.00171
10.13
100.0
0.00021
88
Table ES-3. WLAforTotal Phosphorus, MS4s
Township
Permit ID
WLA, TP
% Reduction
kg/yr
Maiden Creek
PAG133521
5.98
94
Ontelaunee
PAG133512
1.96
93

Table ES-6. Lake Ontelaunee Sediment Loading Characteristics, Existing and TMDL Conditions
Existing Conditions
ITMDL Conditions
Years until 30 percent full
43
92
Sedimentation Rate (cm/yr)
0.91
0.44
Annual Load (kg/m3)
10,772
5,149
Table ES-7. Lake Ontelaunee Sediment TMDL Table (metric tons)
TMDL
LA
WLA
tons/yr
tons/yr
tons/yr
19.587
19,444
143
Table ES-8. Lake Ontelaunee Sediment TMDL, Source Allocation Summary
Source
Area
Existing
Existing
% of
Altocated
Reduced
% of
% Reduction
(ha)
Load (t/yr)
UAL
Existing
Load (t/yr)
UAL (t/yr-
Allocated
(tha-yr)
Load
ha)
Load
Hay/Pasture
9,061
2.146.8
0.24
3.13
0.18
1,629.7
8.32
24
Cropland
19,994
44,973.1
2.25
65.53
11,243.3
0.56
57.40
75
Coniferous
1,135
24.2
0.02
0.04
24.2
0.02
0.12
Mixed Forest
948
104.6
0.11
0.15
104.6
O.11
0.53
Deciduous Forest
14,481
1,467.3
0.10
2.14
1,467.3
0.10
7.49
Unpaved Roads
44
416.7
9.47
0.61
104.2
2.37
0.53
75
Quarry
16
56.7
3.55
0.08
22.6
1.41
0.12
60
Transitional
1,490
19,244.2
12.92
28.04
4,811.0
3.23
24.56
75
Low Intensity Developed
646
19.8
0.03
0.03
19.8
0.03
0.10
High Intensity Develaped
242
17.1
0.07
0.02
17.1
0.07
60°0
MS4
54
127.8632
2.37
0.19
33.494118
0.62
0.17
74
Point Sources
36.0
0.05
109.6
0.56
Total ExistingLoad (tyr)68.634
Total Allocated Load (tyr)19.587
Total %Reduction71
Existing Channel Deposition (t/yr)53.071
Reduced Channel Deposition(t/yr)/12.782
Table ES-9. WLA for TSS, MS4s (metric tons)
Township
Permit ID
WLA, TSS t/yr
% Reduction
Maiden Creek
PAG133521
26.6
74
Ontelaunee
PAG133512
6.9
73
10

5.0
MS4 TMDL StrategY
5.1
MS4 Drainage Area
Lake Ontelaunee's watershed area is approximately 123,104 acres. Maidencreek Township's MS4 storm
sewershed area to the lake is about 98 acres, or 0.08 percent. The 98 acres drain to a three outfalls (#s
The MS4 watershed consists predominantly of agricultural lands. The next largest land user is the Rajah
Temple property, which consists of large areas of open grass (athletic fields and parking areas), as well
as some significant paved areas for parking and access. Much of this area is tributary to a quarry on the
Rajah property, which does not have an overland outlet, but is included in the contributing storm
sewershed area nonetheless. Several detached residential homesites and roadways occupy the
remaining portion of the watershed.
Figure 3 also depicts the extent of Township-owned land within the MS4 drainage area to the lake;
approximately 3.8 acres, comprised solely of streets and adjoining rights-of-way - strips of land less than
50 feet wide. This severely limits the type and number of BMPs that can be implemented and directly
controlled by the Township.
5.2
Prior TMDL Plans for Maidencreek Township's MS4
SDE, Inc. developed an initial TMDL Plan for the Maidencreek Township MS4 tributary to Lake
Ontelaunee in September 2012. The strategy employed in that plan relied heavily on street sweeping as
a means to reduce nutrient and sediment loading to the lake, because this was the only reasonable
physical BMP that the Township had at its disposal on the limited areas of the MS4 under their
ownership.
DEP subsequently deemed the street sweeping approach to be insufficient, and in December 2015,
Great Valley Consultants (GvC) developed a supplement to the original plan. The supplement relies
more on public education and outreach than on physical BMPs, and seeks voluntary cooperation with
the implementation of conservation practices from private property owners, to achieve nutrient and
sediment reductions. The GvC strategy is paraphrased in the following sections.
5.3
Waste Load Allocations and Sources
The Lake Ontelaunee TMDL waste load allocation (WLA) for sediment is 26.6 metric tons/year (58,643
pounds per year) and the WLA for phosphorous is 5.98 kg/year (13.19 pounds/year). The TMDL requires
reductions in sediment and phosphorus loading of 74% and 94%, respectively. These reductions are
applied MS4-wide; however, it should be abundantly clear that the 3.8 acres of Township-owned streets
and rights-of-way are incapable of generating any significant quantities of sediment and nutrients.
Principal land uses within the MS4 storm sewersheds tributary to the lake include privately-owned
agricultural facilities and lawn areas. These uses are significantly more likely to contribute to the waste
loads identified in the TMDL report. See Table 3 for an approximate distribution of land uses throughout
the Ms4 storm sewersheds tributary to Lake Ontelaunee, from Maidencreek Township.
11

Table 3. Contributing Land Uses to Lake Ontelaunee from Maidencreek Township MS4 Storm
Sewersheds
Approx.
% of Total
Land Use Type
Area, ac
Area
Agriculture
57.2
58.6
14.7
Maintained Lawn
15.1
Woods/Quarry
8.5
8.7
Street ROW (State)
5.2
5.3
Impervious (Private)
4.3
4.4
Residential
3.9
4.0
Street ROW (Municipal)
3.8
3.9
Total
97.6
100.0
5.4
TMDL Strategy
It has been established that political subdivision of Maidencreek Township has little, if any, impact to
the wasteloads attributable to the Township in the Lake Ontelaunee TMDL. In addition, the Township
has extremely limited ownership of property within the MS4 tributary to the lake, limited solely to the
narrow strips of street rights-of-way depicted in Figure 3.
In consideration of these limitations, Maidencreek Township proposes public education and outreach as
its principal BMP in the effort to reduce wasteloads to the lake. This approach will involve education of
private landowners within the MS4 area about the effects of nutrient and sediment pollution on the
lake, and encouragement of those landowners to voluntarily implement BMPs to reduce quantities of
phosphorus and sediment in stormwater runoff from lands they control.
For agricultural lands, practices including contour cropping, no-till farming and fertilizer reductions
contribute greatly to sediment and nutrient reductions. In residential and commercial areas,
landscaping practices can be altered to reduce the amounts of fertilizers and pesticides applied to
"green" areas, and better housekeeping techniques can be implemented, such as refraining from
disposal of grass clippings in or near waterways and dry cleanup of oils and debris from paved surfaces.
Education and outreach can be accomplished through the assistance of conservation agencies that
These agencies often offer or have connections to agencies that offer funding opportunities and support
for these efforts. Additional avenues for outreach are available to the Township via its membership in
the Berks County Ms4 Steering Committee, which provides continuous updates and opportunities for
public education throughout Berks County.
5.4.1
 Plan Implementation
Maidencreek Township and/or its designee(s) will implement the TMDL Plan in the following manner
("Year x" designations refer to the end of the particular "Permit Year" by which foregoing activities will
be completed):
12

effectiveness of applying several conservation measures to the agricultural lands. Results will help in
the future discussions with the landowner(s).
The model was set up to cover the agricultural portion of the Maidencreek Township UA, an area of
approximately 57.6 acres (233,277 sq. meters). Of this area, the model database characterized 9.9 acres
appears low, but the goal of the model runs are to gauge percentage loading reductions; therefore, the
relative comparisons should be reflective of actual area.
The following scenarios were evaluated:
1.
Current Condition
2.
Add Cover Crop Only
3.
Add Conservation Tillage Only
4.
Add Nutrient Management Only
5.
Add Cover Crop, Conservation Tillage and Nutrient Management ("All 3")
6.
Add Cover Crop and Conservation Tillage
7.
Add Cover Crop and Nutrient Management
8.
Add Conservation Tillage and Nutrient Management
As would be expected, number 5 ("All 3" scenarios) achieved the highest wasteload reductions of 65%
for sediment and 84% for phosphorus, which would meet the short term (permit term) reduction
stipulated in the TMDL (74% for sediment and 94% for phosphorus). It is important to note that this
evaluation assumes that none of the conservation measures are currently being used.
Table 4 summarizes the results of the model run for the different scenarios, and Appendix A contains
the WikiWatershed screenshots with supporting documentation.
5.4.2
Plan Implementation
Maidencreek Township and/or its designee(s) will implement the TMDL Plan in the following manner
("Year x" designations refer to the end of the particular "Permit Year" by which foregoing activities will
be completed):
Year 1 Collect and compile data regarding ownership and uses of properties within the storm
sewersheds leading to Outfalls O-049, O-050 and 0-051. Rank target audiences as to their
pollutant potential, based on geographic locations within the sewersheds, and relative to public
or private storm sewer systems.
Year 2 Model the agricultural portion of the planning area to gauge effectiveness of load reductions in
response to various scenarios of conservation management measures and focus efforts on
outreach accordingly. Contact local agricultural landowners to determine types and extents of
conservation measures actually being utilized, as well as areal extent of application, and
compare to model results. Contact local agencies including Berks County Conservation District
and Berks Nature, and attend the quarterly meetings of the Berks County MS4 Steering
Committee to gauge interest and ability for the agencies to reach out to and/or meet with
13

property owners, in conjunction with Maidencreek Township, in an order of timeliness based on
severity of ranking in the Year 1 effort.
and private stormwater conveyance and management facilities will be performed, to refine the
voluntary cooperation with BMP implementation. BMP modeling will also be refined based on
contact with landowners and evaluations of actual existing land use and/or conservation
measures. Types of BMPs will be dictated by the type of property(ies) cooperating. Properties
whose owners agree to participate in the plan will be mapped and a scheme will be devised to
concentrate efforts based on topography and contributions of potential wasteloads to the
outfalls. A baseline wasteload can then be computed for areas on and around the subject
property(ies), to be used as a gauge to measure BMP effectiveness over time. The end of Year 3
will be the conclusion of efforts to solicit voluntary cooperation from private landowners.
Year 4 Properties whose owners do not wish to implement BMPs voluntarily will be mapped and any
resulting "gaps" in potential BMP coverage will be evaluated. At this point, the Township will
seek alternatives as needed for compliance with TMDL wasteload allocations. The Township will
assess the "untreated" land uses and evaluate particular types of BMPs that could be effective
in the given areas. Due to the need to establish an inventory of non-participating properties and
a wasteload baseline in the preceding years, it will not be until this stage that the Township can
begin the assessment of what actual BMPs will be effective in achieving the short term
reductions of 1o% sediment and 5% phosphorus, as well as the long term TMDL requirements of
74% reduction in sediment and a 94% reduction in phosphorous.
Year 5 By the end of Year 5, it is hoped that the Township will have succeeded in obtaining enough
cooperation from private landowners that BMP implementation will have a positive effect on
reducing sediment and phosphorus loadings to the short term goals of 10% and 5%,
respectively. As needed and as available, the Township will also have established a BMp
program to supplement reductions achieved by the private properties.
Long Term Beyond the permit term, the Township will continue to focus on any remaining pollutant
sources and means to encourage private property cooperation to meet the TMDL waste load
allocations.
5.4.3
Facilities Inventory
Several sources of data to refine the storm sewershed mapping are already available and include record
plans for development of one of the larger private facilities. In addition, it is hoped that Agricultural
Erosion and Sediment Control Plans and/or Conservation Plans are available at the Berks County
Conservation District for the farms located within the sewersheds. Township and consultant staffs are
also available for more detailed field investigations that will occur throughout the permit cycle.
5.4.4Other MS4-Related Activities
The Township will also continue in its Ms4 permit obligations, public education, outreach and
participation, outfall inspections (IDD&E), erosion and sediment control and post-construction
stormwater management inspections, and good housekeeping at all of its properties. Street-sweeping
14

of the two (2) Township roads within the delineated storm sewersheds will also be incorporated into the
Township's sweeping program.
5.4.5
Ongoing Projects
A dredging project completed in 2017 removed approximately 50,000 cubic yards of sediment from Lake
Ontelaunee. This equates to over 50,o00 tons of dry sediment. Much of the sediment has been
attributed to upstream farmland. This may have an impact on any future updates to the TMDL
document.
5.4.6
Funding
Funding sources will be dependent upon the type and number of BMPs that will voluntarily be placed by
private landowners on private property. Township-related efforts will be reimbursed via the general
fund, unless any necessary alternative BMPs can be covered by grants.
6.0
Summary and Conclusions
The 2010 Census Urbanized Area (UA) within Maidencreek Township encompasses a small portion of
the Lake Ontelaunee watershed; about 57 acres. The UA is part of three (3) MS4 storm sewersheds that
include both UA and non-UA, totaling about 98 acres. The total Lake Ontelaunee watershed is
approximately 123,104 acres, so it can be seen that Maidencreek Township's wasteload contribution is
exceptionally slight. Couple this with the fact that the actual land owned by Maidencreek Township
within the UA is less than 4 acres and it is evident that Maidencreek Township has very little opportunity
to make an impact on wasteloads to the lake through traditional structural BMPs.
A strategy has been devised to adapt to this limitation and it involves public education and outreach to
the approximately 96 percent of the tributary storm sewersheds that consist of private property. This
audience will be targeted in hopes of obtaining voluntary cooperation and implementation of BMPs
within their properties. Based on the results of the loading analyses, concentration will be focused on
the agricultural landowners within the planning area. Short of succeeding in gaining cooperation and/or
in conjunction with those properties who will participate, the Township will continue to investigate
BMPs that it can implement, types and locations of which will be determined once it is know where and
how many of the private landowners will participate.
In the interim, Maidencreek Township intends to continue to meet its Minimum Control Measure
obligations under its current and anticipated renewed NPDES PAG-13 permit.
15

PERCENT
REDUCTION
65.0%
84.1%
ADDALL(3)SCENARIOS
10,194.2
LOAD (Ib)
12.1
ANNUAL
4,624.0
LOAD (kg)
5.5
ANNUAL
REDUCTION
REDUCTION
Bold values indicate percent reductions meeting the short term (permit term) sediment and phosphorus reductions of 10% and 5%, respectively.
PERCENT
ADD CONSERVATION TILLAGE &
ADDNUTRIENTMANAGEMENT
PERCENT
44.1%
30.0%
0.0%
56.2%
NUTRIENT MGMT.
29,094.4
42.8
20,371.4
LOAD (lb)
33.5
ANNUAL
ANNUAL
LOAD (lb)
LAKE ONTELAUNEE TMDL STRATEGY- MAIDENCREEK TOWNSHIP
13,197.0
19.4
9,240.3
LOAD (kg)
LOAD (kg)
15.2
ANNUAL
ANNUAL
REDUCTION
PERCENT
REDUCTION
CROPLAND LOADING SCENARIOS
ADDCONSERVATIONTILLAGE
PERCENT
30.0%
21.9%
65.0%
72.0%
CONSERVATION TILLAGE
ADD COVER CROP &
DECEMBER 2018
20,371.4
59.7
10,194.2
LOAD (Ib)
21.4
TABLE 4.
ANNUAL
ANNUAL
LOAD (Ib)
9,240.3
27.1
4,624.0
LOAD (kg)
LOAD (kg)
9.7
ANNUAL
ANNUAL
Appendix A includes WikiWatershed screenshots supporting above data.
REDUCTION
PERCENT
REDUCTION
ADD COVER CROP & NUTRIENT
PERCENT
35.0%
49.9%
35.0%
72.0%
ADDCOVER CROP
18,917.4
38.4
18,917.4
21.4
LOAD (lb)
 ANNUAL
MGMT.
ANNUAL
LOAD (b)
8,580.8
17.4
8,580.8
LOAD (kg)
LOAD (kg)
9.7
ANNUAL
ANNUAL
CURRENT CROPLAND
29,094.4
76.5
CURRENT CROPLAND
29,094.4
LOAD (Ib)
76.5
ANNUAL
ANNUAL
LOAD (1b)
13,197.0
34.7
13,197.0
LOAD (kg)
LOAD (kg)
34.7
ANNUAL
ANNUAL
PHOSPHORUS
PHOSPHORUS
POLLUTANT
SEDIMENT
POLLUTANT
SEDIMENT
Notes:

Sources
"Pennsylvania Stormwater Best Management Practices Manual", Pennsylvania Department of
"Total Maximum Daily Load For Nutrients and Suspended Sediment Lake Ontelaunee, Berks and Lehigh
"Model My Watershed," Version 1.23.1, WikiWatershed, by Stroud Water Research Center,
https://wikiwatershed.org/modell

Appendix A
WikiWatershed Model My Watershed Documentation

Ontelaunce
O-051
0-050
O-049
LEGEND
G-1
EXISTING STORMWATER COLLECTION SYSTEM
9-001
MS4 OUTFALL & ID 量
EXISTING STORM PIPE AND FLOW DIRECTION
"READING' URBANIZED AREA
WKIWATERSHED MODELING AREA
Figure A.1.  WkiWaterahed Modeling Area within Maldencreek Township's MS4 to Lake Ontelaunea

Figure A.2. WikiWatershed Model Area
WkiWetershed
Maidencreek Twp Portio..
DDetails
Current Conditions - + New scenario
OConservation Practice
+Cover Crops
Aeacfiowcron5ha
Area of interest (Edit)
Selected Area
Model (Edit)
Watershed Multi-Year
Layers
Model o

Figure A.3. WikiWatershed Model Scenario Screenshots
Wis Watershed
Wiki Whrtershed
Maidencreek Twp Portio...
D Details
Maidencreek Twp Portio...
D Details
Current Conditions
+ New stenanis
Add Cover Crop
+ New scenario
Hydrology Water Quaity
Hydrology Water Quality
Average annual loads from 30-years of daily fluxes
Average annual loads from 30-years of daily fluxes
Total
Total
Sediment
Sediment
Sources
Sources
Nitrogen
Phosphorus
Nitrogen
Phosphorus
Total Loads (kg)
49.3
14.838.0
3143
Total Loads (kg)
10,2218
301.6
32.0
Loading Rates tkgfha)
634.10
2.11
13.43
Loading Rates (kg/ha)
436.83
12.89
137
Mean Annuat Concerration
3.97
187.60
0.62
Mean Annual Concentraton
129.24
3.81
(mg/0)
(mgi)
0.40
Mean Low-Flow
2,338.77
10.81
6.61
Mean Low-Flow
2,338.77
10.81
Concentration (ng.i)
Concentration (mg/)
5.61
MeanFlow:79,092 (m/year)and0(m/s)
Mean Flow: 79,092 (m3/year) and0 (m3/s)
L Downioad this data
sDowntoad this data
Total
Tota!
Sediment
Total
Sources
Nitrogen
Sediment
Phosphorus
Sources
Nirogen
(kg)
(kg)
Phosphorus
(kg)
(kg)
(kg)
(kg)
7.0
HayiPasture
5.7
1,494.7
HayrPasture
1,094.7
7.0
5.7
Cropiand
自1970
Cropfand
05800
0.0
Wooded Areas
0.0
00
Wooded Areas
0.0
0.0
0.0
Wetiands
0.0
0.0
0.0
Wetiands
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
0.0
Barren Areas
0.0
0.0
Barren Areas
0.0
0.0
D.0
tow-Density
Low-Density
101.5
2.4
0.3
101.5
2.8
Mixed
Mixed
0.3
Medium-
Medium.
25.8
0.4
0.0
25.8
0.4
Density Mixed
Density Mixed
0.0
High-Denstty
High-Denstty
0.0
0.0
0.0
0.0
0.0
Mixed
Mixed
0.0
Other Upland
0.0
Qther Upland
0.0
0.0
0.0
0.0
Areas
Areas
0.0
Farm Animals
0.0
25.5
6.3
Fam Animals
0.0
25.5
6.3
Stream Bank
19.0
0.0
Stream Bank
0.0
19.0
0.0
Erosion
0.0
Erosion

Wiki Wetershed
Wiki Wetershed
Maidencreek Twp Portio...
 Details
Maidencreek Twp Portio...
BDetails
Add Conservation Tillage
+ New scenario
Add Nutrient Mgmt
+ New scenarlio
Hydroiogy Water Quality
Hydrofogy Water Quality
Average annual foads from 30-years of daily fluxes
Average annual loads from 30-years of daily fluxes
SimuiatedbtheGF-EMspehedmcae,O
Total
Total
Total
Sources
Sediment
Sediment
Sources
Nitrogen
Phosphorus
Nitrogern
Phosphorus
Total toads (kg)
10,881.3
310.8
41.7
Total Loads (kg)
14.8380
301.6
toading Rates (kg/ha)
465.01
13.28
1.78
Loading Rates (kg/ha)
634.10
12.89
1.45
Mean Annual Concentration
137 58
3.93
0.53
Mean Annuel Concentration
187.60
3.81
(mg)
(mg/)
0.43
MeanLow-Flow
2.338.77
10.81
Mean Low-Fiow
6.61
2,338.77
10.81
Concentration (mg/l)
Concentration (mg/l)
6.61
Mean Flow: 79,092 (m/year) and 0 (m-/s)
Mean Flow: 79,092 (m/year) and 0 (m/s)
 Downioad this data
Download this data
Total
Total
Total
Sediment
Total
Sources
Nitrogen
Phosphorus
Sediment
Sources
Nitrogen
(kg)
(kg)
Phosphorus
(kg)
(kg)
(kg)
(kg)
Hay/Pasture
1.494 7
70
5.7
Hay/Pasture
1,494.7
7.0
5.7
Cropiand
92403
40.3
Crogland
131976
Wooded Areas
0.0
0.0
0.0
Wooded Areas
0.0
0.0
0.0
Wetlands
0.0
0.0
0.0
Wetlands
0.0
0.0
0.0
Open Land
00
0.0
0.0
Open Land
0.0
0.0
0.0
Barren Areas
0.0
0.0
0.0
Barren Areas
0.0
0.0
0.0
Low-Density
101.5
2.8
Low-Density
0.3
101.5
2.8
Mixed
Mixed
0.3
Medium-
25.8
04
0.0
Medium-
25.8
Density Mixed
Density Mixed
0.0
High-Density
0.0
00
High-Density
0.0
0.0
0.0
Mixed
Mixed
0.0
other Upland
00
Other Upiand
0.0
0.0
0.0
0.0
Areas
Areas
0.0
Farm Animals
0.0
25.5
6.3
Farm Animats
0.0
25.5
6.3
Strean Bank
19.0
0.0
0.0
Stream Ban!
19.0
0.0
Erosion
Erosion
0.0

Wi Wetershed
Wki Wtershed
Maidencreek Twp Portio...
ODetails
Maidencreek Twp Portio...
CDetails
Add Cover Crop: Nutrient Mgt.: Conserv. Tillage
Add Cover Crop & Nutrient Mgmt.
+ New scenario
Hydrofogy Water Quatiy
Hydrology Water Quality
Average annual loads from 30-years af daily fluxes
Average annual loads from 30-years of daily fluxes
Total
Total
Sediment
Sources
Sources
Sediment
Nitrogen
Phosphorus
Nitrogen
Phosphorus
Total toeds (kg)
6.265.0
19.9
Total Loads (kg)
290.1
10.221.8
292.6
24.2
toading Rates (kgtha)
267.34
12.40
0.85
Loading Rates (kg/ha)
436.83
12.50
1.03
Mean Annual Concentraton
79.21
Mean Annual Cancentiaticn
3.67
0.25
129.24
3.70
(mg/l)
(mgyh)
0.31
Mean Low-Flow
2,338.77
10.81
6.61
Mean Low-Floy
2,338.77
Concentration fmg/l)
Concentration (mgilj
6.61
Mean Flow: 79,092 (m/year) and 0 (m3/s)
Mean Flow: 79,092 (m3/year) and 0 (m3/s)
 Download this data
Download this data
Tota!
Total
Sediment
Total
Sources
Nitrogen
Sediment
Sources
Nitrogen
(kg)
(kg)
Phosphorus
(kg)
(kg)
(kg)
(kg)
HayiPasture
1,494.7
7.0
5.7
Hay/Pasture
1 494.7
7.0
5.7
Cropend
Cnap/and
85008
Wooded Areas
0.0
0.0
Wooded Areas
0.0
0.0
0.0
Wetlands
0.0
0.0
0.0
Wetlands
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
Balfen Areas
0.0
0.0
0.0
Barren Areas
0.0
0.0
0.0
Low-Density
Low·Density
101.5
2.8
0.3
101.5
2.8
Mixed
Mixed
0.3
Medum.
25.8
0.4
0.0
Medium.
25.8
0.4
Density Mixed
Density Mixed
0.0
High-Density
High-Density
0.0
0.0
0.0
0.0
0.0
Mixed
Mixed
0.0
Other Upland
Other Upland
0.0
0.0
0.0
0.0
0.0
Areas
Areas
0.0
Farm Animals
0.0
25.5
6.3
Farm Animals
0.0
25.5
6.3
Stream Bank
19n
Stream Bank
19.0
0.0
Erosion
0.0

Wii htershed
Wkiatershed
Maidencreek Twp Portio...
ODetails
Maidencreek Twp Portio...
D Details
Add Cover Crop & Conserv Tillage
+New scenarid
Add Conservation Tillage & Nutrient Mgmt.
+ New$
Hydrology Water Quality
Hydrology Water Quainy
Average annual loads from 30-years of daily fluxes
Average annual loads from 30-years of daily fuxes
Total
Total
Sources
Sediment
Sediment
Tota!
Nitrogen
Phosphorus
Sources
Nitrogen
Phospharus
Totat toads (kg)
6,265.0
298.1
24.4
Total Loads (kg)
10.881.3
299.1
29.6
Loading Rates (kgrha)
267.74
12.74
1.04
toading Rates (kg/ha)
465.01
12.78
1.27
Mean Annual concentration
79.21
3.7?
0.31
Mean Annual Concentraton
137.58
(mgrl)
3.78
(mg)
0.37
Mean Low-fion
2.338.77
6.61
10.81
Mean Low-Flow
Concentiation fmgvtj
2,338.77
10.81
Concentraxion (mg/t)
6.61
Mean Flow: 79,092 (m3/year) and 0 (m°/s)
Mean Flow: 79,092 (m*/yeatr) and 0 (m3/s)
& Dovnload this data
ta Donnload this data
Total
Tota!
Sediment
Sediment
Sources
Nitrogen
Phosphorus
Sources
Nitrogen
(kg)
(kg)
Phosphorus
(kg)
(kg)
(kg)
(kg)
Hay/Pasture
1.,494.7
7.0
5.7
Hay/Pasture
1,494.7
7.0
5.7
Cropfand
6240
Croptand
12403
286
132
Wooded Areas
0.0
0.0
0.0
Wooded Areas
0.0
0.0
0.0
Wetiands
0.0
0.0
0.0
Wetiands
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
Open Land
0.0
0.0
0.0
Barren Areas
0.0
0.0
0.0
Barren Areas
0.0
0.0
0.0
Low-Densty
101.S
2.8
0.3
Low-Density
1015
2.8
Mixed
Mixed
03
Medium-
25.容
0.4
0.0
Medum.
25.8
0.4
Density Mixed
Density Mixed
0.0
High-Density
0.0
0.0
0.0
High-Density
0.0
0.0
Mixed
Mixed
0.0
Other Upiand
0.0
0.0
0.0
Other Upland
0.0
0.0
Areas
Areas
0.0
Farm Animais
0.0
25.5
6.3
Farm Animals
0.0
25.5
6.3
Stream Bank
19.0
0.0
0.0
Stream Bank
19.0
0.0
Erosion
Erosion
0.0

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.