Other Township Records

Party Exhibit

Date
Date unknown
Type
Document
Year
2024
File
PDF · 346 KB

Download original Open in browser

Document text

Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,521 words

EXHIBIT
Dorndnoe
PennDOT District 5
Assistant District Executive for Design
1002 Hamilton Street
Allentown, PA 18101
March 8, 2012
Dear Sir,
The purpose of this letter is to make you aware of the concerns of the Maidencreek
Township Board of Supervisors in regards to the installation of a roundabout at the intersection
of Route 222 and Tamarack Blvd. After careful review, the Board feels that a roundabout is not
the solution to the congestion problem on Route 222 and installation of one will add to existing
congestion, storm water and safety concerns.
Congestion:
Roundabouts can increase delays at intersections where high volume roads and low
volume roads meet (Federal Highway Administration Publication FHW A-RD-00-067 June 2000,
section 2.1.3). Traffic on the busier road would normally not have to stop if the junction were
signalized, because the traffic signals would provide a green signal to the busier road the
majority of the time. Introduce that same traffic volume to a roundabout and now each vehicle
on the busier roadway must stop and yield to the traffic in the roundabout increasing congestion
and slowing traffic on Route 222. We are concerned that people are going to become confused
when approaching the roundabout causing traffic to slow or they will do something unexpected
which will in turn cause an accident that causes delays. We understand that vehicle accidents are
statistically less severe with roundabouts, but an accident will still snarl traffic. Additional
concern is warranted considering the high volume of truck traffic using Route 222. Truck
movement through the roundabout with other merging vehicles when the truck can or can not
stay in a single lane is a formula for disaster.
It is a genuine concern of the Board of Supervisors that this plan to install a roundabout
will hurt the businesses already established along Route 222 and hinder future commercial

development in the corridor. Any additional congestion or a lack of gaps in the traffic flow
caused by the roundabout will make it difficult to enter and exit the existing driveways between
Route 73 and Tamarack Blvd. It is imperative that a plan for future improvements to the
intersections of Route 222 at Schaeffer Road, Evansville Road and Pleasant Hill Road be
developed in conjunction with the improvements being proposed now for Route 222 and
Tamarack Blvd. We can not accept a “we will deal with that later" attitude. The land
surrounding both the Schaeffer Road and Evansville Road intersections is zoned for commercial
development. A traffic signal permit application was submitted in 2005 for the intersection of
Route 222 and Evansville Road but has not been approved. Sketch plans for two properties near
the intersections have been developed that include big box stores, banks, restaurants and gas
stations. Such uses will make signalization a necessity. It benefits everyone for Penn DOT to
take a proactive approach and plan for the inevitable commercial development in this area.
Documentation by the Northern Berks Regional Police and numerous residents' complaints
received by the Board of Supervisors of vehicles using the center lane excessively and at a high
rate of speed is an issue that will be exacerbated when transitioning from five lanes to three
lanes.
Storm Water:
There is an existing storm water problem in this area which has not been corrected by
PennDOT. The pipe beneath Route 222 is clogged and does not allow storm water to flow where
it was intended to go. North of the intersection near Evansville Road, there has been flooding of
the road during severe storms. While the current storm water conditions still need to be
corrected, will the existing storm water detention basins at CvS be removed to construct the
roundabout? How will Penn DOT control the storm water in a system that is already
overburdened and not functioning properly?
Safety:
Because Maidencreek Township and Richmond Township are home to an active
Mennonite Community in addition to many cyclists who participate in local cycling clubs, there
is a significant amount of bicycle traffic in the Township. Of concern is the higher rate of cyclist
crashes at roundabouts. A New Zealand study of reported crashes between 1996 and 2000 shows
that cyclists were involved in 26% of the reported injury crashes at roundabouts, compared to 6%
at traffic signals. The most common roundabout crash type for cyclists, according to the New
Zealand study, involves a motor vehicle entering the roundabout and colliding with a cyclist who
already is travelling around the roundabout. The next most common crash type involves
motorists leaving the roundabout, colliding with cyclists who are continuing further around the
perimeter of the roundabout.
As Penn DOT moves forward with their process, the Board of Supervisors asks that they
consider improving Route 222 to five lanes from the Bypass exit ramp and widen the intersection

of Route 222 and Route 73 to five lanes with turning arrows. The Township believes that
construction of a roundabout at Tamarack Boulevard should be eliminated or at the very least
postponed until further study and planning in conjunction with the Township can occur to
develop a plan that addresses the safety of our residents and the economic development along
Route 222. Thank you for your time and consideration of our position.
Sincerely,
Joseph Rudderow III, Chairman
Maidencreek Township
Claude Beaver, Supervisor
Maidencreek Township
David Franke, Supervisor
Maidencreek Township

Donohoe Exhibit --
Part#2
RESOLUTION322012
A RESOLUTION OF THE TOWNSHIP OF MAIDENCREEK, BERKS COUNTY,
PENNSYLVANIA EXPRESSING CONCERNS THAT THE PENNSYLVANIA
CONSIDER FUTURE DEVELOPMENT IN ITS PLANNING OF THE PROPOSED
DRIVE WHICH WILL ADVERSELY AFFECT THE CITIZENS AND BUSINESSES
OF THE TOWNSHIP
WHEREAS, Maidencreek Township has spent considerable time and resources over the past
thirty-five years to develop Zoning and Land Use Regulations in the Township; and
WHEREAS, Maidencreek Township, Richmond Township and Fleetwood Borough have entered
into a Joint Comprehensive Plan at the urging of the Berks County Planning Commission and County of
Berks which have defined the goals of the municipalities, provided for all land uses as required in the
Municipalities Planning Code and planned for the future development of the municipalities; and
WHEREAS, the Route 222 corridor is designated in the Joint Comprehensive Plan and in past
Comprehensive Plans and Zoning Ordinances as the single largest area of future regional commercial
growth in Maidencreek Township; and
WHEREAS, the roundabout proposed by Penn DOT District 5 and supported by the Berks
County Commissioners and the members of the Reading Area Transportation Study has not taken the
impact of future development on traffic into consideration; and
WHEREAS installation of the proposed roundabout will severely impede commercial
development of the Route 222 Corridor in Maidencreek Township; and
WHEREAS existing businesses will suffer from restricted ingress and egress and thereby impair
their ongoing viability; and
WHEREAS, failure to account for future development in the Route 222 North Corridor will result
in wasting tax payer money for construction of a road system that will fail to achieve its goals to control

congestion, as well as compromise the safety of motorist, bicycles, horse and buggies and pedestrians:
and
WHEREAS, the property owners and business owners along the Route 222 corridor have the
right to the use and enjoyment of their property and benefit from that use and have petitioned the
Maidencreek Township Board of Supervisors to stop the roundabout or lose such valuable businesses as
CVS, Super Duper Seafood and the proposed 600,000 square foot Maidencreek Crossing Commercial
Center ; and
WHEREAS, these property owners did due diligence in locating their businesses along Route 222
to assure their businesses were compatible with the community's demographics, zoning and future plans
for the region; and, despite their conscientious care and planning, these same property owners are likely to
be harmed in the use, value and enjoyment of their property by changes to Route 222 that are not clearly
likely to accomplish the goals of those changes.
WHEREAS, commercial development is vital to the economic well being of the residents and
property owners of the Township of Maidencreek in the form of employment, providing of goods and
services; and
WHEREAS, commercial development benefits the Municipality, School District and County by
providing revenue through a stronger tax base and has a much lower ratio for the cost of providing
services than a residential development.
NOW, THEREFORE, in consideration of the above recitals, which are incorporated herein
by reference, the Board of Supervisors of the Township of Maidencreek, Berks County,
Pennsylvania, resolves that
1. the Township of Maidencreek, County of Berks, opposes any round about on Route 222 in
Maidencreek Township until such time as future growth and specific impact to existing and proposed
commercial establishments are adequately addressed and planned for; and
2. that Penn DOT undertake a study that takes into consideration the zoning of the land along the Route
222 North corridor and develop a long term traffic plan that addresses the current and future growth
and congestion in the corridor.
RESOLVED and ADOPTED by the Board of Supervisors of the Township of

Maidencreek in lawful session duly assembled, this 11th day of October, 2012 A.D.
Board of Supervisors
MaidencreekTownship
BerksCounty,Pennsylvania
JosephRudderawI
Attest:
Claude Beaver
Diane Hollenbach
David Franke

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.