MAIDENCREEK TOWNSHIP BERKS COUNTY, PENNSYLVANIA ORDINANCE NO. _______ AN ORDINANCE OF MAIDENCREEK TOWNSHIP, BERKS COUNTY, PENNSYLVANIA AMENDING THE MAIDENCREEK TOWNSHIP CODE OF ORDINANCES, AS AMENDED TO: DEFINE DATA CENTER AND RELATED DEFINITIONS UNDER ARTICLE II; CORRECT CODE REFERENCE IN SECTION 220-48.C; ALLOW DATA CENTERS, AND RELATED USES BY CONDITIONAL USE IN THE INDUSTRIAL ZONING DISTRICTS; PROVIDE REGULATIONS FOR SUCH USES IN ARTICLE XVI RELATED TO DIMENSIONAL REQUIREMENTS, AESTHETICS, LANDSCAPE BUFFERS AND BERMS, EQUIPMENT SCREENING, EMERGENCY MANAGEMENT AND ACCESS, NOISE CONTROL, NOISE STUDY, ONSITE GENERATION AND BACKUP POWER, OTHER PERFORMANCE STANDARDS, AIR/GROUND/WATER POLLUTION CONTROLS, DECOMMISSIONING, PARKING, ELECTRONIC WASTE STANDARDS, AND PUBLIC ENGAGEMENT WHEREAS, Maidencreek Township, Berks County, Pennsylvania (“Township”) is a township of the second class operating pursuant to the Second-Class Township Code, 53 P.S. §§ 65101, et seq., and the Municipalities Planning Code (“MPC”), 53 P.S. §§ 10101, et seq.; WHEREAS, the Township enacted The Maidencreek Township Zoning Ordinance of 2017, as amended (“Zoning Ordinance”); WHEREAS, Data Centers and those related uses are not regulated by the Zoning Ordinance, although developers now seek to develop the same in many places throughout the Commonwealth of Pennsylvania in support of artificial intelligence and other computer-based activities; WHEREAS, the development and operation of Data Centers and those related uses potentially pose some hazards to public health, safety, and welfare, including but not limited to excessive noise and vibrations, strain upon finite natural resources and the electrical grid, increased emissions and fire risks, and disrupting the aesthetics of the community; and WHEREAS, the Board of Supervisors of the Township, therefore, desires to regulate the development and operation of Data Centers and those related uses to protect public health, safety, and welfare. NOW THEREFORE, BE IT ENACTED AND ORDAINED by the Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania as follows: Section 1. Purpose of Zoning Ordinance Amendments. The Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania hereby recognizes that Data Centers and those related uses may be important for economic development in the twenty-first century within 1 the Township, the County of Berks, the Commonwealth of Pennsylvania, and the United States of America. The Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania, therefore, declares that the purpose of this Ordinance is not to directly or effectively prohibit the development and operation of Data Centers and those related uses. Rather, the Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania enacts this amendment to the Zoning Ordinance for the purpose of regulating and, thereby, minimizing or preventing issues that may arise from the development and operation of Data Centers and those related uses, including but not limited to noise, vibrations, strain upon finite natural resources and the electrical grid, increased emissions and fire risks, and disruption to the aesthetics of the rural community, which threaten public health, safety, and welfare. Section 2. Definitions. Section 220-11, Definitions, of Article II of the Zoning Ordinance is hereby amended and supplemented to add the following terms and associated definitions (to be inserted in alphabetical order), as follows: Data Center A facility primarily used to house, operate, or co-locate computers, computer communications, or computer storage equipment and to process, organize, handle, store, or back up computer data necessary, all of which are necessary for the operation of artificial intelligence, web or cloud-based computing, computing services, or storage, or another similar business, organizational entity, or the like. A ‘Data Center’ includes Data Center Equipment (DCE) and Data Center Accessory Uses when located on the same parcel as the Data Center or an assemblage of adjacent parcels to the Data Center if developed as one unied development. This use shall also include cryptocurrency mining, blockchain transaction processing and server farms. This use does not include computers or telecommunications-related equipment that is secondary and incidental to an otherwise permitted use on a property such as a server associated with an office building. Data Center Campuses A large plot of land containing multiple, interconnected high-tech facilities dedicated to housing computing infrastructure, servers and massive data storage systems. Data Center Equipment (DCE) and Data Center Accessory Uses The utilities, utility lines, electrical substations, pump stations, water and cooling towers, mechanical equipment, environmental controls (air conditioning or cooling towers, re suppression, etc.), redundant/backup power sources, storage, and supplies, redundant data communications connections, and high security necessary for a Data Center. Sensitive Receptor Any of the following existing or under construction at the time of the submission of any zoning relief application for a Data Center: a school, preschool, day-care center, in-home daycare, health or healthcare facility, such as a hospital, outpatient clinic, long term care or rehabilitation facility, or retirement 2 or nursing home, community center, place of worship, park or preserve (excluding trails), campground, prison, dormitory, any residence, or agricultural use, when any of the foregoing is not located on a parcel with an existing industrial or commercial use. Section 3. Article XIV I Industrial District, Section 220-48.C of the Zoning Ordinance shall be rewritten to refer to section 220-11, as follows: 220-48 Permitted Uses … C. Uses by Conditional Use. The following uses will be considered by the Board of Supervisors as conditional uses subject to the following criteria, and further subject to the provisions of §220-111. Section 4. Article XIV I- Industrial District within 220-48 Permitted Uses, subsection C Uses by conditional use in the Zoning Ordinance is hereby amended and supplemented to add subsection (7) as follows: (7). Data Center, Data Center Equipment, and Data Center Accessory Uses, subject to the regulations in this zoning district, and all applicable provisions of Section 220-81.1 of this chapter. Section 5. Article XVI, “Supplementary Regulations,” the Zoning Ordinance is hereby amended and supplemented to add new Section 220-81.1 as follows: 220-81.1 Data Centers, Data Center Equipment, and Data Center Accessory Uses A. Dimensional Regulations. 1. The minimum lot size for any Data Center shall be 5 acres. 2. The maximum height for any Data Center shall be 60 feet. 3. The maximum height for any Data Center Equipment or Data Center Accessory Uses shall be 60 feet. 4. The maximum building coverage for any Data Center, Data Center Equipment, or Data Center Accessory Uses shall be 40%. 5. The maximum lot coverage for any Data Center, Data Center Equipment, or Data Center Accessory Uses shall be 50% 6. The Data Center, Data Center Equipment and Data Center Accessory Uses shall be set back at least 100 feet from any lot line and any ultimate right-of-way, although the parking and 3 loading/unloading areas, and internal driveways must be at least 50 feet from any lot line. 7. Notwithstanding the foregoing, the Data Center, Data Center Equipment and Data Center Accessory Uses shall be set back at least 1000 feet from any Sensitive Receptor and from the boundary of any residential zoning district. This distance may be reduced to 500 feet if the applicant can successfully demonstrate how it will exceed other environmental performance standards including noise levels that do not exceed ambient noise for that area, visual screening and/or aesthetic improvements that mask the data center use, and do not contribute to any thermal air changes that would affect the closest sensitive receptors. 8. Data Center Equipment and Data Center Accessory Uses shall not be located between the principal building of the Data Center and any street and must be separated from any adjacent dwelling or residential zoning district by the principal building. B. Aesthetics 1. Any Data Center, Data Center Equipment (DCE), and Data Center Accessory Uses building façade that faces a road or sensitive receptor must incorporate at least two of the following design elements every 150 horizontal feet: a. A change in building material, pattern, texture or color; b. A change in building height; c. Building step-backs or recesses having a minimum depth of five (5) feet. C. Landscape Buffer and Berm. The Data Center, Data Center Equipment (DCE), and Data Center Accessory Uses shall, along all lot lines, have a 50-foot landscaped buffer with a 15 foot earthen berm at a slope ratio of 2:1. The landscape buffer shall include plantings to achieve a dense, opaque, four-season screen and shall consist of native species as follows 1. One (1) large evergreen tree per twenty-five (25) linear feet of buffer. The size of large evergreen trees shall be a minimum of eight (8) feet in height at the time of planting. 2. One (1) deciduous canopy (shade) tree per seventy-five (75) linear feet of buffer. Size of canopy (shade) tree shall be a minimum of 2 ½ inch caliper at the time of planting. 3. One (1) ornamental/flowering tree per fifty (50) linear feet of buffer. The size of the ornamental/flowering trees shall be a minimum height of eight (8) feet for multi-stemmed varieties or 2 ½ inch caliper at the time of planting for single-stemmed varieties. 4. Five (5) shrubs per twenty-five (25) linear feet of buffer. Size of shrubs shall be fully branched and minimum of three (3) in 4 height at time of planting. Shrubs shall be a combination of evergreen and deciduous species, with a minimum of 50% being evergreen. 5. Attempts shall be made to preserve mature trees on the site. D. Equipment Screening. All rooftop and ground-mounted Data Center Equipment (DCE) shall be fully enclosed where not mechanically feasible based on the manufacturer’s specifications. If it is not mechanically feasible to fully enclose equipment, the equipment shall be fully screened from public view by parapet walls or architectural screening of compatible materials and color, opaque landscaping to a height not less than the equipment, or a combination thereof. E. Emergency Management and Access. 1. The applicant shall submit an Emergency Response Plan (ERP) prepared by a qualified professional. The ERP shall: a. Be reviewed and accepted by the local fire department and emergency management coordinator as part of the conditional use process; b. Include detailed procedures for fire suppression, containment, ventilation and evacuation that are sufficiently protective of public health, safety and welfare; c. Demonstrate compliance with NFPA standards for fire suppression systems designed for battery storage if proposing battery storage or any other device or group of devices capable of storing energy in order to supply electrical energy at a later time, whether stored on-site or off-site; d. Ensure that all first responders receive adequate training on the installed systems; e. Include provisions for an annual fire safety inspection by a qualified professional on behalf of the Data Center; f. Evaluate access roads and hydrant locations to ensure suitable access. 2. The Data Center shall have an adequate means of secondary ingress and egress suitable for emergency vehicles in accordance with the standards of the underlying district, if any, as approved by the Township Engineer in consultation with the Chief of the Volunteer Fire Company serving that area of the Township. F. Noise Control. When measured from any lot line, the Data Center, Data Center Equipment, and Data Center Accessory Uses, during normal operations, as well as testing and maintenance operations (e.g. all standby emergency equipment, including but not limited to generators running), shall not exceed a maximum decibel level of 55 dB(A) at all 5 times. Notwithstanding the foregoing, during a power outage, the maximum decibel levels specied above shall not apply up to eight (8) hours per month. G. Noise Study. A Noise Study shall be conducted by a professional acoustical expert concluding that the Data Center, Data Center Equipment, and Data Center Accessory Uses will comply with the Noise Control regulations above and what noise reduction materials, systems or other improvements are proposed for that purpose. The Noise Study shall also evaluate the noise with respect to the above regulations when the power is out. The Noise Study shall be conducted using Sound Level Meters described in ANSI S1.4-2014, and generally accepted criteria. The Noise Study shall occur in the following phases: 1. Preliminary Noise Study – A preliminary noise study for the Data Center, Data Center Equipment, and Data Center Accessory Uses shall be filed with the conditional use application. It shall establish the pre-construction ambient/baseline noise level, estimate the anticipated noise levels during normal operations and during power outages, and propose the noise reduction materials, systems or other improvements to meet the above noise control regulations. 2. Interim Noise Study – An interim noise study shall be filed during the land development review process based upon the expected user or users of the Data Center. The noise reduction materials, systems and other improvements recommended by the interim noise study shall be incorporated into the construction plans for the Data Center. 3. As-Built Noise Study – An as-built noise study shall be filed no more than 6 months after issuance of the Certicate of Occupancy for the Data Center but prior to the nal escrow release for any land development phase. An as- built noise study may also be required thereafter by the Township upon request. If the Township determines that a violation of the above noise control regulations has occurred or is occurring, then the owner, operator, or user of the Data Center shall promptly remediate the violation into compliance with the aforesaid noise limits. The costs for the interim and as-built noise studies shall be posted as part of the financial security prior to release and recordation of the final land development plan. 6 H. Onsite Generation and Backup Power. 1. To reduce grid dependency, at least a portion of the power for the Data Center shall be produced onsite from roof-mounted Accessory Solar Energy System (ASES), subject to any non- conflicting regulations of the Zoning Ordinance, covering at least sixty-five percent (65%) of the roof of the principal building of the Data Center, which must be continually maintained and operable. 2. The Data Center may provide backup power through emergency generators, solar power, wind power, fuel cells, and battery storage installed, used, and maintained in accordance with all applicable federal, state, and local laws, rules, regulations, and codes. a. All diesel generators shall meet U.S. EPA Tier 4 emissions standards or better. b. Generators shall be equipped with secondary containment for fuel systems, sized to contain 110% of tank capacity. c. Cumulative generator maintenance and testing shall not exceed 8 hours per month. d. Generator exhaust stacks shall be directed away from adjacent residential uses. I. Other Performance Standards. 1. Air, Ground, and Water Pollution Controls. The Data Center, Data Center Equipment, and Data Center Accessory Uses shall comply with all standards in Section 220-63 of this chapter, the Air Pollution Control Act, 35 P.S. §§ 4001 through 4015, as amended, and the following standards: a. Visible Emissions. Visible air contaminants shall not be emitted in such a manner that the opacity of the emissions is equal to or greater than 20% for a period or periods aggregating more than three minutes in any one hour, or equal to or greater than 60% at any time, and shall comply with Pennsylvania Code Title 25, Chapters 123 and 127A(7), or their most recent update. b. Particulate, Vaporous and Gaseous Emissions. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer or permit the emission of fugitive particulate, vaporous or gaseous 7 matter from any source in such a manner that the emission is visible or detectable outside the property of that use. c. Hazardous Air Emissions. All emissions shall comply with National Emissions Standards for Hazardous Air Pollutants promulgated by the United States Environmental Protection Agency under the Federal Clean Air Act (42 U.S.C. § 7412) as promulgated in 40 CFR 61, or its most recent update. d. Odor. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer or permit the emission into the outdoor atmosphere of any malodorous air contaminants from any source in such a manner that the malodors are detectable outside the property of that use. The prohibition on odors shall not apply to odor emissions arising from the premises of a farm operation. Any process which causes an odor emission shall be operated in a manner such that escaping odors are eliminated. Backup odor reduction equipment shall be maintained to support primary odor reduction equipment. e. Toxic and Hazardous Substances. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer, or permit toxic or hazardous substances to be emitted, leached, deposited, or detectable beyond the property of that use. f. Water Protection. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer, or permit harm to or the endangerment of ground water levels and quality in the area beyond the property of that use, nor adversely affect ground water supplies of the same. 2. Vibration Control. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer, or permit any vibration, exceeding 200 micrometers per second (RMS) or which is discernible to the human sense of feeling, beyond the property for that use. 3. Glare and Heat Control. Any operation producing intense glare or heat shall be performed within an enclosed building or behind a solid fence in such manner as to be completely imperceptible from any point beyond the lot lines. 8 a. A heat mitigation plan shall be required and implemented that identifies primary sources of heat and designs measures to mitigate heat. b. Site lighting shall be cool temperature LED lighting (less than 3000k) with zero uplight. No light shall be emitted above 80 degrees from nadir. To prevent nuisance glare to neighboring parties, Data Centers must use cut off shields, glare control devices, motion activated security lighting or other measures to reduce the impact of the site lighting. Site lighting shall be reduced to 2 lux during late night hours to preserve dark skies. 4. Control of Radioactivity or Electrical Disturbance. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer, or permit the emission of dangerous or harmful radioactivity. There shall be no electrical disturbance (except from domestic household appliances) adversely affecting the operation of any equipment located beyond the property boundary of the creator of such disturbance. 5. Fire and Explosive Hazards. No owner or operator of the Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause, suffer, or permit flammable and explosive materials to be stored, used and transported unless in accordance with the applicable state and federal regulations regarding such materials and associated storage vessels. 6. Outdoor Storage. All outdoor storage facilities for fuel, flammable or explosive materials and raw materials shall be enclosed by a fence adequate to prevent the access of children and other members of the general public. No materials or waste shall be deposited upon a lot in such form or manner that they may be transferred off the lot by natural causes or forces. All material or waste which might cause fumes or dust or which constitute a fire hazard, or which may be edible or otherwise be attractive to rodents or insects, shall be stored outdoors only in closed, sealed containers. 7. Waste Disposal. No Data Center, Data Center Equipment, or Data Center Accessory Uses shall cause industrial waste to be stored, discharged, incinerated or otherwise disposed of except in conformance with the applicable state and federal regulations regarding solid and hazardous wastes. 8. Electrical Power. The Data Center, Data Center Equipment, and Data Center Accessory Uses shall be designed and operated so that the service lines, substation, etc., shall conform to the most acceptable safety requirements recognized by the Pennsylvania 9 Bureau of Labor and Industry, shall be so constructed, installed, etc., as to be an integral part of the architectural features of the plant or, if visible from abutting residential properties, shall be concealed in accordance with the landscaping requirements herein. 9. Electric Report. The applicant shall submit an interconnection agreement from the electric service provider indicating that transmission and distribution capacity are available, the data center will be served, and the upgrades required to the grid before such service. Any and all upgrades to the grid related to transmission or distribution shall be borne solely by the applicant. The impact upon electric rates or the availability of electricity for others uses as a result of the Data Center shall be thoroughly addressed, projected, and explained. 10. Water. The Data Center, Data Center Equipment, and Data Center Accessory Uses must have sufficient water. The Data Center, Data Center Equipment, and Data Center Accessory Uses shall have a close-loop system which must recirculate, reuse and recycle water at the site, and the same shall be explained and shown in a separate report and plan. The Data Center, Data Center Equipment, and Data Center Accessory Uses must have water usage effectiveness consistent with or better than the then-existing industry standards. No such use shall be permitted that poses adverse impact on any source of water. As such, the owner or operator of the Data Center, Data Center Equipment, and Data Center Accessory Uses shall connect the same with a public water system. In the event that the Data Center, Data Center Equipment, and Data Center Accessory Uses cannot be served by public water, the Township may allow the same to utilize a nonpublic source of water. Regardless of whether public water supply or groundwater is to be utilized, the following information must be set forth in a study, under the seal of a professional engineer licensed in the Commonwealth with the requisite education, qualifications, and experience on the following matters, presented by the applicant: a. An analysis of raw water needs for all capacity, including domestic and cooling uses, indicating quantity of water required. b. A geologic map of the area with a radius of at least one mile from the site with the locations of all existing and proposed wells within 3,000 feet of the site (with a notation of the capacity of all high-yield wells) and all streams within 1,000 feet of the site (with all known point sources of pollution). 10 c. The long-term safe yield shall be determined based on the geologic formation(s) underlying the site. d. A determination of the effects of the proposed water supply system on the quantity and quality of water in nearby wells, streams, and the groundwater table. 11. Hydrological Study. The applicant shall submit a hydrological study prepared and sealed by a Professional Geologist licensed in the Commonwealth of PA indicating that the proposed use will not have any adverse impact on ground water supply and quality in the area. 12. Wastewater/Sewage Report. The Data Center, Data Center Equipment, and Data Center Accessory Uses must have a sufficient method of handling wastewater and sewage. No such use shall be permitted that poses adverse impact upon the environment. As such, the owner or operator of the Data Center, Data Center Equipment, and Data Center Accessory Uses shall connect the same with a public sanitary sewer system and present the Township with a will-serve letter from the applicable public authority. The issuance of a Will Serve Letter shall be at the sole discretion of the public sewer system provider. In the event that the Data Center, Data Center Equipment, and Data Center Accessory Uses cannot be served by public sewer, the Township may allow the same to utilize another method for sewage disposal if all applicable federal, state, and local laws, rules, and regulations are followed. 13. Delaware River Basin Commission. If the use is to rely upon non- public sources of water, the applicant shall provide proof of review and approval from the Delaware River Basin Commission for any Data Center proposing: water withdrawals of 50,000 gallons per day (gpd) or more over a 30-day average from any source or combination of sources within the Delaware River Basin; or any consumptive water use of 20,000 gpd or more over a 30-day average from any water source. 14. All costs (including but not limited to permitting, engineering, legal, administrative, construction and contingencies) associated with increasing conveyance, treatment, capacities, and/or upgrading any public sanitary sewer and water system facilities, if required by the system Owner, shall be borne by the Data Center developer. 11 J. Decommissioning. 1. The owner or operator of the Data Center shall, at its sole obligation, cost, and expense, complete decommissioning of the Data Center within 12 months of the end of its useful life or the Data Center no longer being in operation for a consecutive period of 12 months, whichever comes first. 2. The owner or operator of the Data Center shall inform the Township in writing within 30 days of the Data Center reaching the end of its useful life or having not been operable for a period of at least 12 consecutive months. 3. Decommissioning shall include complete and total deinstallation and removal of all structures and facilities, components, features, and appurtenances of the Data Center, whether above, equal to or below ground, in strict accordance with any and all applicable federal, state, and local laws, rules, regulations, and codes. Materials shall be recycled or reused where applicable. Stormwater facilities and healthy landscaping shall remain undisturbed. 4. An independent, certified professional engineer licensed to practice in the Commonwealth of Pennsylvania shall be retained to estimate the total cost of decommissioning without regard to salvage value of the equipment, and the cost of decommissioning net salvage value of the equipment (the “Net Decommissioning Cost”). Said estimates shall be submitted to the Township prior to final approval of the land development plan, and after the first year of operation and every fifth year thereafter. 5. The owner or operator of the Data Center shall prepare a decommissioning plan for review and approval during the conditional use hearing and shall prepare a cost estimate of the decommissioning as set forth in the plan. Thereafter, the owner or operator of the Data Center shall post and maintain financial security pursuant to said approved plan and cost estimate to ensure the proper and timely decommissioning before or contemporaneous with the Township’s release of the final land development plan. 6. The funds for the financial security for decommissioning shall be posted and maintained with a bonding company, or federal- or commonwealth-chartered lending institution chosen by the owner or operator of the Data Center; provided, however, that the bonding company or lending institution is authorized to conduct such business within the commonwealth and is approved by the Township. 12 7. The financial security for decommissioning may be in the form of a performance bond, surety bond, letter of credit or other form of financial assurance as may be acceptable to the Township. 8. If the owner or operator of the Data Center fails to complete decommissioning within the prescribed period, then the landowner shall have 6 months to complete decommissioning. 9. If neither the owner or operator of the Data Center nor the landowner complete decommissioning within the periods prescribed herein, then the Township may take such measures as necessary to complete decommissioning through the use of the financial security for decommissioning provided by the owner or operator of the Data Center. 10. The entry into the municipal improvements agreement by the landowner shall constitute consent of the parties to the decommissioning. K. Parking. 1. Data Centers are to be provided with at least one parking space per 6,000 square feet of floor area designed and intended to be accessible regularly by employees, or one parking space for every one employee, based upon the maximum number of employees on site during the largest shift, plus 15 spaces for visitors, whichever is greater. 2. Notwithstanding the above, the Township may ask for an additional 25 percent of required parking spaces to be held in reserve. L. Electronic Waste Standards. 1. An Electronic Waste Plan shall be submitted with the conditional use application outlining procedures for safe removal and recycling and/or disposal of server infrastructure, hazardous materials, batteries, electronic waste, and related products that meet all state and federal requirements, which will apply in cases when the equipment within the data center is updated or decommissioned. The Report shall be subject to review and comment by the Township. The Township shall have the right to require supplemental or amended reports based upon comments by the Township prior to any zoning approval. 13 M. Public Engagement Process. 1. The applicant shall hold a public meeting prior to the first planning commission meeting when the proposed land development or conditional use application is discussed. The purpose of the meeting shall be to inform the public about the nature of the proposed development, including the location, scale, and general characteristics. A representative(s) of the applicant with knowledge of the project and the ability to answer general questions from the public about the project’s general location, scale, and parameters shall participate in the meeting. The public meeting shall be advertised, at the cost of the applicant, consistent with “public notice” as defined by the Pennsylvania Municipalities Planning Code (PA Act 247). 2. The applicant shall create and maintain a project website for viewing by the general public. The site shall explain the project parameters, including maps and elevations/renderings, beginning at least two weeks prior to the meeting discussed above, and until the time of final land development approval. The site shall provide a description of the proposed use, construction timelines and phasing plans, dates of public meetings with Township bodies, and status of permits. N. Conflict. If the regulations of the underlying zoning district where the Data Center is proposed to be developed, or any applicable provision in any other Article in the Code of Maidencreek Township conflict with these regulations in this Ordinance then these regulations shall control. Section 6. Severability. If any article, section, subsection, provision, regulation, limitation, restriction, sentence, clause, phrase or word in this Ordinance, is, for any reason declared to be illegal, unconstitutional or invalid by any Court of competent jurisdiction, such decision shall not affect or impair the validity of this ordinance as a whole, or any other article, section, subsection, provision, regulation, limitation, restriction, sentence, clause, phrase, word or remaining portion of the within Ordinance. The Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania, hereby declares that it would have adopted the within Ordinance and each article, section, subsection, provision, regulation, limitation, restriction, sentence, clause, phrase and word thereof, without the limitation, restriction, sentence, clause, phrase or word declared illegal, unconstitutional or invalid. Section 7. Effective Date. This Ordinance shall become effective at the earliest date permitted by law. 14 DULY ENACTED AND ORDAINED as an Ordinance of Maidencreek Township, Berks County, Pennsylvania on this ________ day of _________________, 2026. BOARD OF SUPERVISORS MAIDENCREEK TOWNSHIP BERKS COUNTY, PENNSYLVANIA ___________________________________ Joshua G. Meck, Chairman ___________________________________ Eric Bauman, Vice Chairman ____________________________________ Dawn Geschwindt, Member Attest: ____________________________ Christina L. Hafer, Secretary 15 MUNICIPAL CERTIFICATION I, Diane Hollenbach, Township Manager, certify that this is a true and correct copy of the Ordinance enacted by the Board of Supervisors of Maidencreek Township, Berks County, Pennsylvania on ___________ _____, 2026. ____________________________________ Diane Hollenbach, Manager 16