Stormwater Best Management Practices Worksheets
Stormwater Management for Minor Land Disturbance Activities addresses the intent of the SWM
Ordinance by managing the runoff through infiltration facilities. To determine the size of infiltration
facilities required for a site for a Minor Land Disturbance Activity, utilize a factor O.23 times the
impervious area. This approximates the net 2-year increase.
STEPONE:DETERMINEREOUIREDVOLUME
TOTAL AREAofIMPERVIOUSCOVER
Includes all areas of new building, paving, concrete and compacted
gravel that are part of the proposed work. (Except pervious paver
blocks)
Sq. ft.
Multiply by 0.23
X 0.23
TOTAL WATER QUALITY VOLUMEREQUIRED (WQ)
Cu. ft.
Details of the BMPs listed below are provided as part of this Appendix. For additional information on
how these BMPs function and ideas of other BMPs refer to the “Pennsylvania Stormwater Best
Management Practices Manual" latest edition prepared by the DEP.
STEP TWO: SELECT BMPs TOBE UTILIZED
BMPNAME
(How Many)
1. Infiltration Basin
2. Infiltration Bed
3. Infiltration Trench
4. Other*
TOTAL
* As approved by the Township Engineer. Provide additional information as needed.
The first three BMPs listed are Infiltration BMPs and as such should be located on the site in areas with the
most suitable soil. Areas of wet or poorly drained soils should be avoided.
Infiltration BMPs shall also be located with the following setbacks:
Ten (10) feet down gradient from a building basement
One hundred (100) feet up gradient from a building basement
Ten (10) feet from property lines
One Hundred (100) feet from wells
Fifty (50) feet from septic system drain fields
Recognizing that Minor Land Disturbance Activities often cannot meet the setback requirements due to the size
of the proposed work area, consideration will be made to reduce the setbacks provided.
W:mastersIBUILDINGIBUILDINGPERMITAPPLICATIONPACKET/2018IPERMITTERMSANDCONDITIONS011818.doc

BMPInstallationNotes:
1.
BMPs shall be protected during construction to prevent sediment-laden water from
entering the facility
2.
Excavation of the BMPs shall be conducted in a manner that will not compact the bottom
of the facility.
3.
The bottom of the facility shall be scarified immediately prior to the placement of the
bottom layer of geotextile for subsurface structures or the topsoil placement for above
ground structures.
4.
Geotextile shall be placed in accordance with the manufacturer's specifications. Seams
shall be overlapped a minimum of 16 inches.
5.
The area of the BMP shall be fenced off during construction. Construction equipment shall
be prohibited from entering the area to avoid soil compaction.
STEPTHREE:DETERMINEVOLUMEPROVIDED
Volume (cu. ft.)
BMP (See details for volume calculations)
1. Infiltration Basin
2. Infiltration Bed
3.Infiltration Trench
4. Other*
TOTAL (must be greater than WQ in Step One)
* As approved by the Township Engineer. Provide additional information as needed.
W:mastersIBUILDINGIBUILDINGPERMITAPPLICATIONPACKET/2018/PERMITTERMSANDCONDITIONS011818.doc

SWMBMP#1-INFILTRATIONBASIN
An Infiltration Basin provides an aboveground area for water to be stored and infiltrate into the ground. Roof
Drains and overland runoff are directed into an aboveground basin to infiltrate. A spillway is provided to release
the larger storm volumes. The spillway should be located to avoid any down slope problems when water is
flowing over the spillway. The spillway shall be lined with a permanent erosion mat to prevent deterioration.
The spillway should be located as far away as possible from any inflow pipes to promote infiltration and settling
of runoff contaminants. The basin shall also be planted with vegetation that is tolerant of the wet conditions that
will occur during infiltration. The depth of the basin may be increased with the approval of the Township
Engineer.
=2xW
GUTTER WITH LEAF
BOTTOMOF
TRAPSCREEN
BASIN
DOWNSPOUT
IN
PROVIDE4”SCH.4OPVCPIPE
FOR ALL UNDERGROUND PIPE.
ALLJOINTSTOBECEMENTED
PROVIDEMINIMUMOF2%SLOPE.
PROVIDE CLEANOUTSATEACHHORIZONTALBEND.
BERM
ADAPTER
SPILLWAY
PLAN VEW OE BASIN
4”SCH.4O PVC"T"
LINING
PRECAST CONCRETE
PROVIDERODENTPROOF
SPLASH:BLOCK
GRATE
-2'
WIDE--
-6”
BOTTOM OF BASIN
DEEP X 10'WIDE SPILLWAY
TO BE LEVEL
MAX
PIPEROOF DRAINS DIRECTLY TO
LINESPILLWAYTOTOEOFBERM
y4 BEND
THE
BASIN WHERE OVERLAND FLQW
INSIDEANDOUTWITHPERMANENT
IS NQT POSSIBLE
"D"
TURFREINFORCEMENT MATTING
NORTHAMERICANGREENC350 OREQUIV.
18 MAX DEPTH
-SEE SETBACKNOTES
ELEVATION VEW OE BASIN
Determinationof Water QualityVolumeprovided:
Bottom Area -- for rectangular basins use L x W, estimate for
Sg. ft.
irregular shaped Basin
Depth of Basin = D
Ft.
Basic Volume = L x W x D (Line 1 x Line 2)
Cu. Ft.
Side Slope Factor “Z"- Use 3 for 3:1 slope, 4 for 4:1 slope, etc
Approx. Additional Volume = (L+W) x Z x D x D
Cu. Ft.
TOTAL VOLUME (WQ) (Line 3 + Line 5)
Cu. Ft.
(Use this number in Step Three)

SWMBMP#2-INFILTRATIONBED
An infiltration bed can be used where surface runoff is not to be captured. Roof Drains from the
proposed structure are piped into an underground basin to infiltrate into the ground. An overflow pipe
is provided to release the larger storm volumes. A cleanout is provided to facilitate maintenance and
provide an inspection port for the bed. The pipe within the bed is perforated and should be run through
the basin to the fullest extent to promote infiltration and distribution of the runoff. The soil over the
basin shall also be planted with vegetation that will not interfere with the operation of the bed. The
depth of the bed may be increased with the approval of the Township Engineer.
L>=2xW
GUTTER WITH LEAF
OVERFLOW
TRAP SCREEN
IN
DOWNSPOUT
-PROVDE4”SCH.4OPVCPIPE
FOR ALL UNDERGROUND PIPE.
NON-WOVEN
ALLJOINTSTOBECEMENTED
PLANYIEW OF BED
GEOTEXTILE
PROVDEMINIMUMOF2%SLOPE.
ALL SIDES,
PROVDECLEANOUTSATEACH HORIZONTAL BEND.
TOP ANDBOTTOM
-ADARTER
PROVIDE SOIL-TIGHT
4"SCH 40 CLEANOUT/
PIPE PENETRATION
4" SCH. 40 PVC "T"
OBSERVATION PORT
PROVIDEPERFORATED PIPE
4”SCH40PVC
PRECAST CONCRETE
WITHIN THE BED.
OVERFLOW PIPE
SPLASH BLOCK
12"MIN COVER
2% SLOPE TO DAYLIGHT
PROVIDE RODENT PROOF
GRATE
"D"
18"MAX
Y4BEND
AASHTONo.4
BOTTOMOFBASIN
STONE CLEAN
TO BE LEVEL
NON-WOVEN GEOTEXTILE
-SEE SETBACK NOTES--
ALL SIDES,TOP AND BOTTOM
ELEVATION VIEW OE BED
Determination of Water Quality Volume provided:
Bottom Area -- for rectangular basins use L x W
Sq. ft.
Depth of Basin = D
Ft.
Basic Volume = L x W x D (Line 1 x Line 2)
Cu. Ft.
Actual Void Volume in Stone Bed (WQv) = 0.4 x Line 3
Cu. Ft.
(Use this number in Step Three)
W:mastersIBUILDINGIBUILDINGPERMITAPPLICATIONPACKET/2018/PERMITTERMSANDCONDITIONS011818.doc

SWMBMP#3-INFILTRATIONTRENCH
Infiltration trenches are utilized along the perimeter of impervious surfaces to collect, store and
infiltrate runoff. River rock will be placed on the bed to allow the runoff to enter the trench; alternately
the bed may utilize a perforated pipe with inlets to get the runoff into the trench. The trench is
constructed as a terraced system with clay dikes to promote infiltration. The depth of the trench may
be increased with the approval of the Township Engineer. Pipe can be utilized within the trench to
increase the available storage volume. Because the trench is installed along paved area that needs to be
compacted during construction, extra attention needs to be paid to avoid compaction in the area of the
trench or loosen the material under the trench prior to installation.
PROPOSED PAVING
AND SUBBASE
-R-4RIVER ROCK
9"MIN THICKNESS
FINISHED GRADE
"D”
12"MIN
25'MAX SPACING-
24"MAX
2'WIDECLAYPLUG
(ML OR CL SOILS)
AASHTONo.4
BOTTOM OFTRENCH
STONE CLEAN
TOBELEVEL
NON-WOVENGEOTEXTILE
LONGITUDINAL SECTION OF TRENCH
ALLSIDES,TOPANDBOTTOM
SECTIONAT EDGEOE PAVING
Determination of Water Quality Volume provided:
Bottom Area = Length of Trench x Width
Sq. ft.
Depth of Basin = D
Ft.
Basic Volume= L x W x D (Line 1 x Line 2)
Cu. Ft.
Actual Void Volume in Stone Bed (WQv) = 0.4 x Line 3
Cu. Ft.
(Use this number in Step Three)
If perforated pipe is used in the bed, adjust volume accordingly.
W:masters\BUILDINGIBUILDINGPERMITAPPLICATIONPACKET/2018/PERMITTERMSANDCONDITIONS011818.doc

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.