Other Township Records
Document — March 3, 2008
- Date
- March 3, 2008
- Type
- Document
- Year
- 2008
- File
- PDF · 1.4 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 260 words
11.23.2015 Re:109&111GroveRoad To:MaidencreekTownship ToWhomItMayConcern: Could you please complete the final inspection and release the escrow funds in whole if possible, or if not, then in part, for the properties at 109 and 111 Grove Road? Please make payment to Matt Zimmerman. (see attached letter) Icanbereachedat484.388.1735ormattzzimm@gmail.com Thank you, MattZimmerman mailing address 413 Park FleewodlPA /9Soa MAIDENCREEKTWP.PC.JANTZSUBDIVISIONCOSTESTIMATE SDE SDE PREPAREDBY:BERKSSURVEYING&ENGINEERING,INC. DATE: 3/3/2008 REVISEDBYSYSTEMSDESIGNENGINEERING,INC. PLANSDATED:MAY02,2007 UNIT COST UNITS QUANTITY AMOUNT DESCRIPTION A)STORMWATERMANAGEMENT $4.00 CY 62 $248.00 1.Excavation/Grading $12.00 Tons 126 $1,512.00 2.AASHTO#1 $0.10 SF 1,148 $114.80 3.FilterFabric $3.00 LF 150 $450.00 4.4"PVC Pipe IncludingFittings $2,324.80 STORMWATERMANAGEMENTSUBTOTAL B)PAVING/RESTORATION $2,500.00 EA $5,000.00 1. Utility Trench Restoration $20.00 SY 117 $2,340.00 2. 1 1/2" Superpave Wearing Course $7,340.00 PAVING/RESTORATIONSUBTOTAL $9,664.80 TOTALPROJECTCOSTESTIMATEOFITEMSATHRUB $966.48 Construction Observation (10% +/-) $483.24 Admin & Legal (5% +/-) $483.24 Contingency(5%+/-) $11,597.76 SUBTOTALOFCONSTRUCTIONCOSTS $1,159.78 Additional Security (10%) $12,757.54 TOTALRECOMMENDEDESCROWAMOUNT * A separate Escrow shall be posted with the Maidencreek Township Authority for the proposed sanitary sewer lateral and water service connection. EST: MWP CHECKED:TSU Sde/Projects/Maidencreek.Twp.P.C./07-0024-0673/JantzSub'd.cost.est/03.03.08 PAGE1of1 12/16/201512 Towhomitmayconcern, I am writing to you in regards to the Jantz subdivision on Grove Rd. in Maiden Creek Township.1 previously owned the property at io3 Grove Rd. and had Berks Surveying & Engineering, Inc. subdivide that property into three lots.I sold lots 1 and 2 to Matthew and Shelia Zimmerman, He aiso forwarded the funds for the esarow account that was opened in regards to the proposed street imnprovements. It is rmy understanding that the projecr is finished and the esarow account can be closed.Those funds can be released to Matthew or Shelia Zimmerman. Sincerely, GregoryJantz