Board of Supervisors
Correspondence — April 2, 2015
- Date
- April 2, 2015
- Type
- Correspondence
- Year
- 2015
- File
- PDF · 6.7 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 503 words
PHONE: (610) 375-8822 VALLEY CONSULTANTS GREAT 1-800-733-4821 FAX: (610) 375-8977 75COMMERCEDRIVEWYOMISSING,PA19610-3323 April 2, 2015 Maidencreek Township Board of Supervisors c/o Diane Hollenbach, Township Manager P. O. Box 319 Blandon, PA 19510 Re: Small Properties Storage Units Escrow Release Request No. 1 GVC File 3026-011 Dear Supervisors: Maidencreek Township received an escrow release request from David Small for the Small Properties Storage Units located on the western side of Hoch Road, approximately 300 feet to the north of Park Road. At the Township's request, our office has reviewed the site and offers the following as our recommendation. During a site visit, we observed the completion of the work as requested. The work included installation of all required Erosion and Sediment controls as well as the storm sewer improvements. 10% of the storm sewer was not requested since the grouting of all pipes and channels within the inlets has not yet been completed. We agree with this retainage of these funds. Therefore, GVC is recommending Escrow Release No. 1 in the amount of $37,050.00. Following is a breakdown of the financial security: Initial Amount $ 56,076.08 Release No. 1 $ 37,050.00 Current Balance $ 19,026.08 Please do not hesitate to contact me if you have any questions or need additional information regarding the above. Sincerely, CHARLES M. JONES, PE, PLS Project Manager CMJ:SCA:emm Enclosures cc: Eugene Orlando, Esquire Engineers Architects Planners Consultants Surveyors printed onrecycledpaper GREATVALLEYCONSULTANTS DAILY REPORT Page 1 of 1 Small Propeties Storage PROJECT NO. PROJECT 3026-011 DATE Friday, March 27, 2015 REPORT NO. 001 (DAY OF WEEK AND MONTH) CLIENT Maidencreek Township (Use N/A in spaces if not applicable) SIGNED (Title) Construction Observer Good, Sunny Speed Wind Weather Conditions Direction Site Conditions Muddy, some puddles and minor snow coverage -°F High 48°F Low 37°F Barometric Pressure Temperature N/A Amount March 26, 2015 Last Precipitation 0.79" Foreman Oper. Lab.'s Drivers Men Employed: Supt. 0. Subcontractor David Small - Small Plumbing Contractor None Tradesmen General Site Equipment None (all parked) Materials Delivered None Materials Delivered and Used None Description and Progress of JobNo work being performed. Checked site for completion of work per the escrow request. Site reflected the completion as stated in the request. I spoke with David Small. He questioned who will be continuing the building inspections? He also asked to place the fence on the other side of the basin and match trees that the HOA has planted to the north. I told him I would get back to him with answers. QA/QC Procedures Observed work for compliance to Specifications and Plans. Measures to Protect Unfinished Areas E&S Controls, WZTC Testing: Field and/or Lab N/A Visitors N/A Meetings N/A Total Field Hours : Staff:Scott C. Anderson 1.75 FROM::3:15 AM TO: 5:00 PM AM PM TO: AM PM AM FROM: PM In-office time for report preparation and finalization are charged in addition to the time expended in the field. The costs associated with review and processing of escrow release requests and correspondence are also additional time charges to the project. 3az/s mimi