June 5, 2015
Maidencreek Township Board of Supervisors
c/o Diane Hollenbach, Township Manager
P. O. Box 319
Blandon, PA 19510
Re:
Meadowbrook Subdivision
Request forEscrowRelease
GVC File 3026-012
Dear Supervisors:
On May 28, 2015, Forino Co., LP requested a release of the cash escrow in the amount of
$20,000.00 which was previously deposited with the Township for repairs to stormwater
management facilities within the Meadowbrook Subdivision. On May 26th and 27th, Forino Co.
LP completed repairs to twelve (12) storm sewer inlets within Meadowbrook. These inlets were
previously identified as those requiring most immediate repairs. Our Daily Report for the
Meadowbrook inlet repairs is attached for your reference.
Great Valley Consultants recommends the release of the cash escrow in the amount of
$20,000.00 to Forino Co., LP as requested.
Please feel free to contact us if you have any questions or need additional information regarding
the recently completed inlet repairs.
Sincerely,
CHARLES M. JONES, PE, PLS
Project Manager
CMJ:emm
Enclosures
CC:
Eugene Orlando, Esquire
Scott L. Sweigart, Forino Co., LP
Engineers
Consultants
Planners
Architects
Surveyors
printed on recycled paper

GREAT VALLEY COSULTATS
DAILY REPORT
Page 1 of 2
PROJECT
Meadowbrook Inlet Repairs
PROJIECT NO.
3026-012
DATE
June 1, 2015
REPORT NO.
CLIENT
Maidencreek Township
(Use N/A in spaces if not.applicable)
SIGNED
(Title) Project Manager
Weather Conditions
Sunny
Wind
Calm
Speed
Direction
N/A
Site Conditions
Streets are clean with low traffic volumes
81.
Temperature
High
Low
Barometric Pressure'
Last Precipitation
Amount
Men Employed: Supt.
Foreman
One..
Oper.
Lab.'s
One
Drivers
Contractor
Forino
Subcontractor
 None
Tradesmen
Equipment
Backhoe, pick-up truck, hand tools, masonry equipment
Materials Delivered Quick-setting, high strength mortar
Materials Delivered and Used Quick-setting, high strength mortar
Description and Progress of Job
Twelve storm sewer inlets were identified as requiring repairs and cleaning. Work
began immediately after initial field meeting. Forino continued with repair work until completed.
QA/QC Procedures
N/A
Measures to Protect Unfinished Areas
N/A
Testing: Field and/or Lab
None
Visitors
None
Meetings
Initial field meeting on May 26 with Claude Beaver, Forino, GVC
Staff:
 Charlie Jones
Total Field Hours:
μAM PM
10:30
May 27
TO:
11:30
μAM
FROM:
PM
μAMPM
May 28
10:30
TO:
11:30
FROM:
AMPM
In-office time for report preparation and finalization are charged in addition to the time expended in the field. The costs associated
with review and processing of escrow release requests and correspondence are also additional time charges to the project.
C2015 All Rights Reserved

Page 2 of 2
DAILY REPORT (Cont'd)
PROJECT
Meadowbrook
PROJECT NO.
3026-012
DATE
June 1, 2015
REPORT NO.
CLIENT
Maidencreek Township
SIGNED
(Title) Project Manager
Description and Progress of Job
Regent Street and Walnut Tree Drive - 2 inlets. Patched around pipe insertions and under front walls.
Gallagher Drive and Kensington Boulevard -- 2 inlets. Patched around pipe insertions and other minor patching
Cedrick Avenue and Kensington Boulevard - 2 inlets. Minor patching in both basins. Cleaned out loose debris and
patched brick risers.
basin.
128 Stirling Street - 2 inlets. Raised top unit with hydraulic jack. Forced cement in riser layer. Drilled screws and
patched. Minor patching in second basin.
Stirling Street and Millennium Drive - 1 inlet. Minor patching in front wall.
129 Millennium Drive - 1 inlet. Patching around pipe insertion.
Patching of rough areas was completed in all inlets. Floor of all inlets was cleaned of loose concrete or brick debris.
Work completed will stabilize inlets for the near future. Similar work may be necessary later.