Board of Supervisors
Correspondence — June 5, 2015
- Date
- June 5, 2015
- Type
- Correspondence
- Year
- 2015
- File
- PDF · 401 KB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 582 words
PHONE:(610)375-8822 GREATVALLEY CONSULTANTS 1-800-733-4821 FAX:(610) 375-8977 75COMMERCEDRIVEWYOMISSING,PA19610-3323 June 5, 2015 Maidencreek Township Board of Supervisors c/o Diane Hollenbach, Township Manager P. O. Box 319 Blandon, PA 19510 Re: Meadowbrook Subdivision Request forEscrowRelease GVC File 3026-012 Dear Supervisors: On May 28, 2015, Forino Co., LP requested a release of the cash escrow in the amount of $20,000.00 which was previously deposited with the Township for repairs to stormwater management facilities within the Meadowbrook Subdivision. On May 26th and 27th, Forino Co. LP completed repairs to twelve (12) storm sewer inlets within Meadowbrook. These inlets were previously identified as those requiring most immediate repairs. Our Daily Report for the Meadowbrook inlet repairs is attached for your reference. Great Valley Consultants recommends the release of the cash escrow in the amount of $20,000.00 to Forino Co., LP as requested. Please feel free to contact us if you have any questions or need additional information regarding the recently completed inlet repairs. Sincerely, CHARLES M. JONES, PE, PLS Project Manager CMJ:emm Enclosures CC: Eugene Orlando, Esquire Scott L. Sweigart, Forino Co., LP Engineers Consultants Planners Architects Surveyors printed on recycled paper GREAT VALLEY COSULTATS DAILY REPORT Page 1 of 2 PROJECT Meadowbrook Inlet Repairs PROJIECT NO. 3026-012 DATE June 1, 2015 REPORT NO. CLIENT Maidencreek Township (Use N/A in spaces if not.applicable) SIGNED (Title) Project Manager Weather Conditions Sunny Wind Calm Speed Direction N/A Site Conditions Streets are clean with low traffic volumes 81. Temperature High Low Barometric Pressure' Last Precipitation Amount Men Employed: Supt. Foreman One.. Oper. Lab.'s One Drivers Contractor Forino Subcontractor None Tradesmen Equipment Backhoe, pick-up truck, hand tools, masonry equipment Materials Delivered Quick-setting, high strength mortar Materials Delivered and Used Quick-setting, high strength mortar Description and Progress of Job Twelve storm sewer inlets were identified as requiring repairs and cleaning. Work began immediately after initial field meeting. Forino continued with repair work until completed. QA/QC Procedures N/A Measures to Protect Unfinished Areas N/A Testing: Field and/or Lab None Visitors None Meetings Initial field meeting on May 26 with Claude Beaver, Forino, GVC Staff: Charlie Jones Total Field Hours: μAM PM 10:30 May 27 TO: 11:30 μAM FROM: PM μAMPM May 28 10:30 TO: 11:30 FROM: AMPM In-office time for report preparation and finalization are charged in addition to the time expended in the field. The costs associated with review and processing of escrow release requests and correspondence are also additional time charges to the project. C2015 All Rights Reserved Page 2 of 2 DAILY REPORT (Cont'd) PROJECT Meadowbrook PROJECT NO. 3026-012 DATE June 1, 2015 REPORT NO. CLIENT Maidencreek Township SIGNED (Title) Project Manager Description and Progress of Job Regent Street and Walnut Tree Drive - 2 inlets. Patched around pipe insertions and under front walls. Gallagher Drive and Kensington Boulevard -- 2 inlets. Patched around pipe insertions and other minor patching Cedrick Avenue and Kensington Boulevard - 2 inlets. Minor patching in both basins. Cleaned out loose debris and patched brick risers. basin. 128 Stirling Street - 2 inlets. Raised top unit with hydraulic jack. Forced cement in riser layer. Drilled screws and patched. Minor patching in second basin. Stirling Street and Millennium Drive - 1 inlet. Minor patching in front wall. 129 Millennium Drive - 1 inlet. Patching around pipe insertion. Patching of rough areas was completed in all inlets. Floor of all inlets was cleaned of loose concrete or brick debris. Work completed will stabilize inlets for the near future. Similar work may be necessary later. @2015 All Rights Reserved