Other Township Records
Walnut Manor Certified Tab Bid — April 3, 2017
- Date
- April 3, 2017
- Type
- Bid
- Year
- 2017
- File
- PDF · 1.6 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 494 words
MaidencreekTownship Wexcon,inc. RCGDevelopmentL.P ConstructionMasters BarrassoExcavation,Inc. Bertolet Construction Corp H&KGroup,Inc. BerksCounty,Pennsylvania 379Tilden Road 6866ChrisphaltDrive Services,LLC 1523Memorial Hwy 100SouthChurchRoad P.O. Box 196 Walnut Manor Phase Il Mohrsville,PA19541 Bath,PA18014 P.0.Box1063 Oley,PA19547 Wernersville,PA19565 Skippack,PA19474 StormSewerRepairProject Bid Opening April 3,2017 Bid Tab Item Unit Approximate Unit Unit Unit Unit General Description Unit Total Total Total Unit No. Total Total Quantities Price Price Price Price Price Price Total BASEBIDSTORMSEWERREPAIR 1. Storm SewerReconstruction including but not limited to excavation, removal and disposal off-site of existing storm sewer piping, excavate for, furnish and install new HDPE (watertight joints) storm sewer piping and external joint couplers, aggregate bedding/backill, compaction, trench dewatering, bypass pumping, pipe grouting, temporary (as necessary) and permanent trench restoration/stabilization, and modification of existing structures to accommodatenewstormpipe;complete inplaceforeachitem. A. Excavateand Remove Existing Storm Sewer Piping Excavate, remove and properly dispose of existing 15" or 18" storm sewer piping and all other excavated materials off-site, complete per linearfoot. 95 LF $48.00 $151.58 $4,560.00 $14,400.10 $100.00 $9,500.00 $16.00 $1,520.00 $205.00 $19,475.00 $245.00 $23,275.00 B. INSTALLNEW15"STORMSEWERPIPING(APPROX.DEPTH4'to6): Furnishmaterials,equipmentandlaborforinstallationofnew15"diametersmooth interior high-density polyethylene storm sewer (watertight joints), including but not limited to aggregate bedding/backill, compaction, modifying existing pipe openings asnecessaryto accomodate new stormpipes; complete in placeperlinearfoot. 30 LF $155.00 $4,650.00 $194.00 $5,820.00 $180.00 $5,400.00 $275.00 $8,250.00 $355.00 $10,650.00 $1,230.00 $36,900.00 C. INSTALLNEW18"STORMSEWERPIPING(APPROX.DEPTH11'TO13): Furnish material, equipment and labor for installation of new 18"diameter smooth- interior high-density polyethylene storm sewer (watertight joints), including but not limited to aggregate bedding/backill, compaction, modifying existing pipe openings 65 LF $150.00 $9,750.00 $157.96 $10,267.40 $300.00 $19,500.00 $476.00 $30,940.00 $385.00 $25.025.00 $755.00 $49,075.00 D. INSTALL15"PIPECOUPLER manufacturer's specifications; compliete in place pereach. EA $500.00 $1,500.00 $150.00 $450.00 $290.00 $870.00 $250.00 $750.00 $215.00 $645.00 $740.00 $2,220.00 E. INSTALL18"PIPECOUPLER Furnish and install new 18" Mar MacTM Polyseal coupler (or approved equal) per manufacturer's specifications;completeinplacepereach. EA $525.00 $1,050.00 $150.00 $300.00 $305.00 $610.00 $250.00 $500.00 $261.00 $522.00 $775.00 $1,550.00 F. ADDITIONALWORKASDIRECTEDBYENGINEER: INSTALLNEW15"STORMSEWERPIPING: If conditions warrant,constructnew15"HDPE storm sewer,per scopeof Item1.B.; 20 LF completeinplaceperlinearfoot. $155.00 $3,100.00 $194.00 $180.00 $3,880.00 $3,600.00 $275.00 $5,500.00 $355.00 $7,100.00 $1,040.00 $20,800.00 INSTALLNEW18"STORMSEWERPIPING: If conditions warrant, construct new 18" HDPE storm sewer, per scope of Item 1.C.; 20 LF completeinplaceperlinearfoot. $150.00 $3,000.00 $149.50 $2,990.00 $300.00 $6,000.00 $476.00 $9,520.00 $385.00 $7,700.00 $970.00 $19,400.00 3.15"MarMacTMPolyseal Coupler (orapprovedequal): If conditions warrant, furnish and install 15" coupler,per Item 1.D. EA $500.00 $500.00 $150.00 $150.00 $290.00 $290.00 $250.00 $250.00 $215.00 $215.00 $855.00 $855.00 4.18"MarMacTMPolyseal Coupler (orapprovedequal): If conditions warrant,furnish and install 18"coupler,per Item1.E. EA $525.00 $525.00 $150.00 $150.00 $305.00 $305.00 $250.00 $250.00 $261.00 $261.00 $890.00 $890.00 TOTAL BASE BID (Bid Items #1.A.thru #1.F.4.) $28,635.00 $38,407.50 $46,075.00 $57,480.00 $71,593.00 $154,965.00 NOTE:RGC Development L.P.-Multiplication errorfor Bid Item#1.C.for a difference of $o.10 We hereby certify that the above is a true and correct tabulation of the bids received by Maidencreek Township, Berks County, Pennsylvania, on April 3, 2017 for the Wainut Manor Phase ll - Storm Sewer Repair Project, which were opened and read at theTownship on April 3, 2017 at 11:05 A.M. Systems Design Engineering, Inc. haig I:IProjectsIMaidencreekTownshipl16-0019-0248WalnutManorStormSewerRepairlSpecificationsIAdminBidTabulation Craig Momose, P.E. 1 of 1