Manager Report — September 5, 2017
- Date
- September 5, 2017
- Type
- Report
- Year
- 2017
- File
- PDF · 1.9 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 511 words
Manager's Report Activity in the Month of August Attended Supervisors meeting, Police Commission meetings, Melrose Place site visit Maidencreek Township Authority meeting, Planning Commission meeting. Permit applications, bills, deposits and bank reconciliations were handled in a timely manner. Prepared pension MMO, discussed with Actuary Mailed Act 44 Pension Disclosure to pension provider, Standard Insurance Co. Mailed summer newsletter. Continued work on recycling calendar. Prepared Ag Security information for a newsletter, reviewed map Met with various sales people in preparation for budget Traffic study on Chestnut to engineer. Joint Ambulance workers compensation research and discussion. REMINDER - Sept 22nd breakfast with the Commissioners, Oct. 19th Berks County Convention for Elected Officials See attached letter Blandon Avenue. From: 08/11/201713:53 #100P.001/001 Towhomitmayconcern, Today8/11/2017mysonwasridinghisscooterfromourhomewhichislocated onBlandonAvedown Midwayto Sunset and was almost hit bya work van that washeaded to the business's down on Excelsior.Iknow our streets are residential however the traffic light that is at Park Road and Excelsior was placed there to help with the traffic going inand out from the business complexes. We need something to be done on our street. The nonresidents use our street as a through way to either connect to Route 73 or to Park Road. Our street (Blandon Ave) has a lot of children living there and one of either our children or another child from our street is going to get hit by the speeding traffic. The cars don't even stop at the stop sign at Blandon Ave and Midway which is adjacent to the township supervisor's home. I know that multiple parents along with myself have been to township meetings expressing our concerns along with contacting Northern Berks Police Department. Nothing is getting done with this issue we have. I have even spoke to the companies on Excelsior Drive to ask their employees to use the traffic light as they fly up our street and this shouldn't have to get this bad before something is done. I am askingthat removable speed bumpsbe placed, reduced speed limit, or a one way.I think slow childrenatplaysignsareseenhoweverignored. Sinc JaneenBrooksConcernedhomeowner Berks County/PennDOT5-0 Berks#53ABridgeReplacement-FinalDesign Blandon Bridge-Schaeffer Road over Willow Creek STATUSREPORT LDG Project No.: 5475-001-F DATE: September 5, 2017 LDG Project Manager: James A. Patil, P.E. PROJECTCOSTS Approved Construction Cost Estimated Construction Cost (excluding C. Insp.) $ 1,271,000 SCHEDULE MILESTONES Part2-FinalDesignNoticetoProceed:9/29/2015Expiration:12/31/2017 Overall Design 99% complete Utilities/ROW clearance efforts are in progress APPROVALSAND/ORACTIVITIESCOMPLETED Final Structure Plans conditionally approved 7/6/17. Mylar plans fully signed on 8/14/17. 8/30/17. Construction Items uploaded to ECMS Construction Plan Review comments addressed. Constructability Review comments received 8/18/17 and all are addressed except one (seeking additional info for potential need for coordination efforts with another nearby project). SUBMISSIONSCURRENTLYUNDERREVIEW RevisedConstructionSchedulesubmittedon9/5/2017. PS&E Submission submitted for initial review 9/5/2017 pending the determination of any changes necessary for nearby project coordination. ACTIVITIESSCHEDULEDFOREARLYSEPTEMBER County is performing Right of Way acquisition. All documents and checks are at the ready. The County is coordinating signatures and issuance of payment in order to receive ROW clearance by the District in early September. Revisions toPS&E documentation as needed. UNRESOLVEDPROJECTISSUESREQUIRINGRESOLUTIONORINFORMATIONREQUIRED ENGINEER'SOPINIONOFPROBABLECONSTRUCTIONCOSTSSUMMARY,COSTUPDATED Updated construction cost estimate : $ 1,271,000 (excluding construction inspection) LDG