Manager's Report Activity in the Month of June Permit applications, bills, deposits and bank reconciliations were handled in a timely manner. Attended Board of Supervisors meeting, Planning Commission, Police Commission meeting and executive session, Authority meeting. Met with Verizon on VOIP phone system. Pension Audit (June 12, 20, 28) Met with Pennsylvania Economic League on future development for study conducting for Fleetwood Area School District enrollment projections. PA Department of Environmental Protection meeting regarding ordinances and grant application. Met with recycling hauler over service concerns. Attended manager's meeting Held safety meeting. The office staff is currently working on review of the 2020 Census address list. This will take several months. Schaeffer Road Bridge construction has begun. Delivery of the new pickup truck is expected mid to late July. Open Enrollment for Ag Security Area begins August 1 st. Respectfully Submitted. Diane Hollenbach, Manager MCCORMICK TAYLOR Schaeffer Road Bridge Replacement Progress Meeting #2 Minutes Meeting Date: June 26, 2018 Location: Project Field Office Attendance Sheet Attached Discussion: Reviewed previous meeting minutes. MPT and Detour related signage in place. R. Altemose, PaDOT F.A.M. Coordinator directed IIC to utilize PaDOT Form CS-9O1 until Apps can be downloaded onto I-pad for MPT Reports. Ed Seidel stated that Met Ed power lines had been transferred and work completed. Note that existing poles still had telephone and TV cable to be transferred to new poles. Frontier Communications responsible for coordinating this operation. Kyle Eaton to follow up on this matter. These utilities will not impact construction of bridge. Estimate #2 will be generated 6-29-2018. Three Week Look Ahead presented by Mike Tomson, Rylind Const. Site Supt.. Bridge demo to start week of 7-2 -18. E&S measures were being installed presently and will all be in place by the end of day Ryan Hunter, County of Berks, requested plaque on existing bridge be returned to the County. Kyle Eaton, Rylind Construction, presented Demolition Plan for discussion and review of procedures outlined within. It was noted by Brian Janis, PaDOT to exercise caution when removing the existing metal railing. IIC to check SP for transfer of material. After demolition contact Brian Janis, bjanis@pa.gov and Tyler Frantz, tyfrantz@pa.gov 2 - 3 days before driving piling. Dynamic Pile Load Testing will be done by Vibra-Tech. Next meeting: July 10th @ 1:00PM 600EagleviewBoulevard,2ndFloorExton,PA19341]610.640.3500 www.mccormicktaylor.com MCCORMICK TAYLOR Attendees: Ed Seidel Medvecsky Associates LTD Mike Kuhns Larson Design Group Brian Janis PaDOT Jennifer Payne McCormick/Taylor Ryan Hunter County of Berks Randy Altemose PaDOT Michael Tomson Rylind Construction Kyle Eaton Rylind Construction