Board of Supervisors
Agenda — July 12, 2018
- Date
- July 12, 2018
- Type
- Agenda
- Year
- 2018
- File
- PDF · 7.5 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 1,697 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS July 12, 2018 ENGINEER'SAGENDA Subdivision Review StatusChecklist NextSupervisorsMeetingAugust9,2018 Berkshire Building Service expires7/13/18; TE rec'd from applicant through 9/14/19. GSPPropertiesexpires7/31/18. Subdivision/Zoning/LDP Planscurrentlyinreview. GSPPropertiesFinal LDP- SeeSDEItr.dated6/5/18;Planning Commissionactionexpected @7/11/18mtg. Berkshire Building Services Final LDP- See SDEItr.dated3/5/18; No Action Maidencreek TV & Appliance -- Revised plan; to be handled with Zoning & Building permit. Melrose Place Work on grading swale &properties is mostly complete; survey complete. Paving completed, sidewalks & street trees installed. Punchlist for entire development completed; Subdivision Improvement Agreement expires7/31/18. Projects StormwaterProjects Ina/Rt.73--Lindbergh/Adele-onhold. West ShoreDrive Meet with inspectorfor state regarding Bridge Inspection.Report. Repairs are somewhat extensive; Twp.Involvement is possible Three (3) 60" dia. Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp. to make repairs as schedule permits. Dog Park Page 1 of 2 I:\Projects/MaidencreekTownship/18-0019-0100\Engineer'sAgendal7.12.18.docx BOS awarded contract to Fehl's in the amount of $32,537; contracts executed&NoticetoProceed sent. Work completed; Application for Payment No. 1 in the amount of $30,910.15 for approval (retainage $1,626.85). 2018RoadProjects Contract"A"road paving contract Awarded to H&K Group in the amount of$199,825.14 (includes both parking lot areas on Quarry Rd.) Contract "B" cold-in-place recycling Evansville Rd. contract awarded to H&K Group in the amount of $103,990.86. Noticeof Award issued 6/4/18; PreconstructionMtg.heldon7/2/18. Township road crew proceeding w/Quarry Rd.storm water and Evansville Rd.drainage work. NoticetoProceedissued7/2/18withstartdateof7/25/18. E.Wesner Rd.-Streambank Rehabilitation Settingupmeetingw/DEP Twp.budget? Twp.type of bank rehabilitation? SubdivisionImprovementLOC/EscrowRelease Brandywine Transportation-Release of Maintenance Financial Security. Sewage Enforcement OfficerActivityReport Page 2 of 2 I:/Projects\MaidencreekTownship/18-0019-0100/Engineer'sAgendal7.12.18.docx Most Recent Letter Date 3/6/2018 2/8/2018 Review 3/5/2018 See SDEltr.3/6/18and MTPC Itr. 1/3/18&2/8/18 See SDE Itr.Dated 3/5/18 See SDE Itr.Dated 6/5/18 Comments P.C. Action Itr. 1/4/18 Dated 4/5/18 See SDE Itr. Approved BY BOS 04/12/18 02/08/18 MAIDENCREEKTOWNSHIP,BERKSCOUNTY (may reflect more than one extension) Extension 06/05/18 07/13/18 SUBDIVISION STATUS 7/12/2018 Period Ends 03/06/18 03/06/18 06/05/18 90-Day Review 07/31/18 Review Period 1:/ProjectsiMaidencreek Townshipl18-0019-01001Subdivision Statusi6.14.18 12/06/17 12/06/17 03/07/18 90-Day Begins 05/02/18 Plan Stage Prel. LDP Prel. LDP Final LDP Final LDP APPROVED/PENDINGPLANS: GSP Properties - Business Park GSPProperties -Business Park Berkshire Building Services Berkshire Building Services CURRENT PLANS: Project Name No. BERKS SURVEYING & ENGINEERING,Inc. Land Surveying and Engineering Services 311EastMain StreetFleetwood,PA 19522 BERKS Phone:610-944-8528 Fax:610-944-6123 www.berks-surveying.com e-mail:info@berks-surveying.com Member June13.2018 To: MaidencreekTownship Board of Supervisors P.O.Box 319 1QuarryRoad Blandon,PA19510 E: d.hollenbach@maidencreek.net (DianeHollenbach) Re: BerkshireBuildingServices,WestWesnerRoad To Whom it May Concern: We grantan extension of timeforreview bythe Maidencreek Township Board of until September 14th, 2018. Thank you. Sincerely, Robert D.Hain,PLS,ProjectManager Berks Surveying& Engineering, Inc. ForBerkshirePropertyManagement Company,LLC Z:JOBS-2018\Folino-RRITWP-CO-STATE/2018-06-13_TimeExtensiontill9-14-18.doc PUNCHLIST Page 1 of 2 SYSTEMSDESIGN SDE ENGINEERING,INC DateofInspection(s):06/29/2018 InspectionPerformedBy:ChipPohronezny Project:MelrosePlace Location:Maidencreek Township ProjectNumber:06-0019-0585 Developer:Folino Type of Inspection: Preliminary Item No. Description of Issue All signage shall be straightened and installed at proper heights Replacetreeonvacantlotnear112Lidia Lane Installtreeinislandperplans Install TruncatedDomematat intersectionof Lidia Lane andSofia Blvd Replace stamped Truncated Domewith mat Lidia Laneand Sofia Blvd. ReplacestampedTruncatedDomewithmat301AnnaAve,alsoramphassettled Replace stamped Truncated Dome withmat Sofia Blvd.andAnna Ave. Repair/Replacedrivewayapronat117LidiaLane Repair/Replacedrivewayapronatvacantlotnear117LidiaLane 10 Caulk all Curbingwith sikaflexwereexpansion joint ismissing (throughoutdevelopment) 11 Repair/Replacedrivewayapronat101 Lidia Lane,expansion jointmissing 12 Repair/Replacesidewalkat100LidiaLane,Repair/Replacedrivewayapron 13 Caulkall sidewalkwith sikaflexwhereexpansion joint ismissing (throughoutdevelopment) 14 Replacebrokedlightpostbases 15 Repair/Replacedrivewayapronat 104 Lidia Lane,expansion joint missing 16 Topsoil andseedgrass stripsthroughoutthedevelopmentat sidewalks,severalareas arelow 17 Topsoil and seed around watercurb stops (throughout the development) 18 Repair/Replacedrivewayapronat108 Lidia Lane,expansion jointmissing 19 Repair/Replacedrivewayapronat112LidiaLane,expansion jointmissing 20 Clean asphalt material off all utilites (throughout the development) 21 Removeall inletprotectionfrominlets 22 Clean all inlets, remove any loose concrete and parge with non shrink grout 23 Repair all damaged inlettops (throughoutdevelopment) 24 Repair/Replacesidewalkatdeadend201AnnaAve. 25 Repair/Replacedamagedcurbatdead end ofLidia Lane 26 Missing sign at dead end of Lidia Lane 27 Repair/Replacesidewalk201AnnaAve.,Repair/Replacedrivewayapron 28 InstallsidewalknewLot#3 29 Repair/Replacedrivewayapronat213AnnaAve. 30 Repair/Replacesidewalk213/217AnnaAve.behindhydrant 31 Repair/Replacedrivewayapronat221AnnaAve. 32 Repair/Replacedrivewayapronand sidewalk settlement at225AnnaAve. 33 Install all lotpinsandmonuments 34 Repair/Replacedrivewayapron at 301AnnaAve.,noexpansion joint in apron 35 Repair/Replacedrivewayapronandsidewalkat305AnnaAve. 36 Repair/Replacedrivewayapron and sidewalk at300Anna Ave. Repair/Replacedrivewayapronand sidewalk at StockpileLot AnnaAve. 38 Repair/Replacedrivewayapronandsidewalkat204AnnaAve. 39 Repair/Replacedrivewayapronacross from201Anna Ave. Notes: This punchlist shall be considered Preliminary until final restoration is completed.MaidencreekTownship and/or its Engineer reserves the right to add items after the restoration work is considered complete. Please Contact Michael W."Chip" Pohronezny of our office forty-eight (48) hours prior to starting any work on Punchlistitems PUNCHLIST Page 2 of 2 SYSTEMSDESIGN SDE ENGINEERING,INC Dateof inspection(s):06/29/2018 InspectionPerformedBy:ChipPohronezny Project:Melrose Place Location: Maidencreek Township ProjectNumber:06-0019-0585 Developer:Folino Type of Inspection:Preliminary Item No. Description of Issue 40 Repair/ReplacecurbnearTinyThinkersAcademy 41 Repair/Replace(2)ADArampsatentrancetoMassimo's 42 Repair/ReplacecurbatDentistofficenearupperparkingarea 43 Repair/Replacedrivewayapronat 333SofiaBlvd.,no expansion joint inapron 44 Repair/Replacedrivewayapronat 329SofiaBlvd.,no expansion joint inapron 45 Repair/Replacedrivewayapron at325Sofia Blvd.,no expansion joint in apron 46 Repair/Replace drivewayapron at 321 Sofia Blvd. 47 Repair/Replacedrivewayapronandsidewalkat Lot#49SofiaBlvd. 48 Repair/Replacedrivewayapronandsidewalkat217SofiaBlvd.,noexpansionjointinapron 49 Repair/Replace(2)ADArampsatrearentrancetoMassimo's 50 Repair/Replacecurbat Sofia Blvd.andAnnaAve.Massimo'sADAramp 51 Repair/Replacecurbatexitlaneofdevelopment 52 Repair/Replaceentranceislandcurb 53 Repair/ReplaceADArampatentrancetodevelopment 54 Repair/ReplacecurbatADAramptolightpostnearelectricalboxesatentrance 55 Repair/Replacedrivewayapron at208Sofia Blvd. 56 Repair/Replacedrivewayapron at vacant lot near208Sofia Blvd. 57 Repair/Replacedrivewayapronat216SofiaBlvd. 58 Repair/Replace drivewayapronat220 Sofia Blvd. 59 Repair/Replace curb behindinlet Sofia Blvd.and Lidia Lane at vacantlot 60 Repair/Replacedrivewayapronat312SofiaBlvd. 61 Topsoil and seedatnewhousenextto312SofiaBlvd. 62 Repair/Replacedrivewayapronat320SofiaBlvd. 63 Repair/Replacedrivewayapron at326Sofia Blvd. 64 Repair/Replacedrivewayapron at336Sofia Blvd. 65 Repair/Replacedrivewayapronat340SofiaBlvd. 66 Repair/Replacedrivewayapronat344 SofiaBlvd.,noexpansion joint in apron 67 Repair/ReplacesidewalknearADArampat300AnnaAve. 68 SubmitfinalAs-Built Plans 69 Clean upboth storm waterbasins so that these areas can bemaintained. Notes: This punchlist shall be considered Preliminaryuntil final restoration is completed. Maidencreek Township and/or its Engineer reserves the right to add items after the restoration work is considered complete. Please Contact Michael W."Chip"Pohronezny of our officeforty-eight (48)hours priorto starting anywork on Punchlistitems ENGINEER:SYSTEMSDESIGNENGINEERING,INC. Cc. By: Date: 07/o6l1x SYSTEMSDESIGN ENGINEERING,INC sdei.net July 6, 2018 Maidencreek Township 1 Quarry Road P.0.Box 319 Blandon, PA 19510 Attn:Diane Hollenbach, TownshipManager Re: Township Dog Park Fence Project Release No 1 Completion of Improvements Dear Diane: We are in receipt of a payment application from Fehl's t/a/ K.D. Home and Garden dated June 6, 2018 for the full contract amount of $32,537.00 (copy attached). Final inspection was performed at the Park for the installation of all the required fence and associated hardware in accordance with the contract specifications. Based on our review and final inspection, the work performed to date is in accordance with contract specifications and plans. We recommendpayment of$30,910.15, retaining $1,626.85(5%). Sincerely, SYSTEMSDESIGNENGINEERING,INC Thomas Unger, PE Township Engineer Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor Fehls t/a K.D. Home and Garden SDE,Inc.17-0090-0237 1032 James Drive, Leesport,PA 19533P:610.916.8500F:610.916.8501 Schuylkill Hoven, PA .P: 570.385.5549 Bcyeroan. PA P: 610.369 1319 .85 37,00 08 Page 1o. 910 6l8/208 0/b 17-0090-0237 APPLICATION NO: APPLICATION DATE: ENGINEER'S PROJECT NO: PERIOD TO: CONTRACTDATE: :0120 Application ts mane for Payment, as shown beiow, fn connecton with the Contract. Contractor named herein, Issuance, payment and acceptance of payment are without Ltne from priorapplicarton).... RECOMMENDEO BY: (ENGINEER) SYSTEMS DESIGN ENGINEERING, INC. prejudice to any nights of the Owner or Contrector under this Centract. Funding Agency (If Applicabte) (Line 4 tess Line 5 Total) %of Completed Work .......... (tine3 Less Line 6) Continuatfon Sheet, (is artached). (7J) LESSPREVIOUSPAYMENTS J0% Totaf Retainage: (CotumnL) VIA (ENGINEER): Systems Design Engineering, Inc. RETAINAGE: APPROVEDBY: PROJECT: Dog Park Fence Project (Submit 3 original copies to the Engineer) Leesport, PA 19533 1032James Drive The undersigned Contractor certifies that to the best of its knowledge: (t) all previous progress payments received from DEDUCTIONS (002/st MyCommission expires: indicated, the quality of the Work is in accordance with the Contract Documents, and in accordancewith the Contract Documents,based on on·site observations and the ADDITIONS Notary Public: APPLICATION FOR PAYMENT Per k. Date: the Contractor is entitled topayment of the AMOUNT CERTIFIEO. Date Approved Total TOTALS Koch Road CONTRACTOR'S CERTIFICATION Subscribed and swom tobefore ENGINEER'SCERTIFICATEFORPAYMENT Maidencreek Township Net changeby Change Orders FROM (CONTRACTORI: CHANGE ORDER SUMMARY Change orders approved in previousmonthsbyOwner CONTRACTO.. dayof ApprovedthisMonth CONTRACT FOR: Number TO (OWNER): CONTRAC State of: me this Notice to Proceed Date: July3,2018 Project: 2018Annual PavingProject Owner: Maidencreek Township Owner's Contract No.: Contract: ContractA--RoadImprovements Engineer'sProjectNo.:18-0019-0115 Contractor: H&K Group, Inc. Contractor's Address: P.O. Box 196, Skippack, PA 19474 You are hereby notified that the contract times under the above Contract will commence to run on July25,2018 .On or before that date,you are to start performing your obligations under the Contract Documents. In accordance with Article 4 of the Agreement, the date of substantial completion isAugust 24,2018(30 days)and the date of Final Completion is September23,2018 (60days).Please sign and return four (4)copies of theNotice to Proceedto the Engineer. For:. MaidencreekTownship (Owner) By: (Engineer) Systems Design Engineering, Iinc. 1032JamesDrive Leesport,PA19533 Enclosures: cc: Acceptance of Notice Receipt of theabove"Noticeto Proceed'is herebyacknowledged this day of 2018,and weherebyconsider July25,2018 astheofficial startingdateforthis Contract. By: Title: (Contractor) EJCDCC-55oNoticetoProceed Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Canstruction Specifications Institute. Page 1of1 Noticeto Proceed Date: July 3.2018 Project: 2018AnnualPavingProject Owner: MaidencreekTownship Owner's Contract No.: Contract: Contract B -- Cold-in-Place Recycling Engineer's Project No.: 18-0019-0115 Contractor: H&K Group, Inc. Contractor's Address:P.O.Box196, Skippack,PA 19474 You are hereby notified that the contract times under the above Contract will commence to run on July25,2018 .Onorbeforethatdate,youaretostartperformingyourobligationsunder the Contract Documents.In accordance with Article 4 of the Agreement, the date of substantial completion is. August 24,2018(30 days) and the date of Final Completion is September 23,2018 (60 days).Please sign and return four (4) copies of the Notice to Proceed to the Engineer. For: MaidencreekTownship (Owner) Aais amo By: (Engineer) Systems Design Engineering, Inc. 1032James Drive Leesport, PA 19533 Enclosures: cC: AcceptanceofNotice Receiptof theabove"NoticetoProceed'isherebyacknowledgedthis day of 2018, and we hereby consider July25,2018 as the official starting date for this Contract. By: Title: (Contractor) EJCDCC-550NoticetoProceed Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute. Page 1of 1 SUMMARY IMPROVEMENTAGREEMENTSINVOICES APPROVEDFORPAYMENT MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS JULY 3,2018 DATE OFINVOICE/PAYEE INVOICENO. AMOUNT 1.MelrosePlace 1/31/18MaidencreekTwp.--Re:SDE,Inc. 92279 $7,396.22 AMOUNTDUE $7,396.22 TOTALAMOUNTDUE $7.396.22 I:ProjectsiMaidencreekTownshipVmprovementAgreementSummaries/2018107.03.18.doc SYSTEMSDESIGN ENGINEERING,INC sdei.net July 6, 2018 Maidencreek Township 1 Quarry Road P.O. Box 319 Blandon,PA19510 Attn: Diane Hollenbach, Township Manager Re: Brandywine Transportation Land Development Plan Completion of Improvements Dear Diane: Final inspection was performed for the above referenced project for the installation of all stormwater management facilities and other required items in accordance with the approved plans. Based on our review, the work performed is in accordance with the Township Improvements Agreement and approved plans. We recommend at this time that Brandywine Transportation be released from the maintenance financial security obligation. Sincerely, SYSTEMS DESIGN ENGINEERING,INC Thomas Unger, PE Township Engineer Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor SDE,Inc.16-0019-0605 1032James Drive, Leesport, PA19533P:610.916.8500F:610.916.8501 Schuylkill Haven,Pap.570385.5549 Boyeitown. Pa P: 610 369.1319 nrniartelmainannraak/1gnn1nnnnlaaaaai..l.. Chk# Billed/Paid to Date By Fee Paid Applicant MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT 6/1/18-6/30/18 Applicant/Activity .No updates SEO report,admin/filing. App.# 18-0019-0300 SDE# . Unger 2 copies SEO Desk Cc: