Subdivision Review StatusChecklist
NextSupervisorsMeetingAugust9,2018
Berkshire Building Service expires7/13/18; TE rec'd from applicant through
9/14/19.
GSPPropertiesexpires7/31/18.
Subdivision/Zoning/LDP
Planscurrentlyinreview.
GSPPropertiesFinal LDP- SeeSDEItr.dated6/5/18;Planning
Commissionactionexpected @7/11/18mtg.
Berkshire Building Services Final LDP- See SDEItr.dated3/5/18; No
Action
Maidencreek TV & Appliance -- Revised plan; to be handled with Zoning
& Building permit.
Melrose Place
Work on grading swale &properties is mostly complete; survey
complete.
Paving completed, sidewalks & street trees installed.
Punchlist for entire development completed; Subdivision Improvement
Agreement expires7/31/18.
Projects
StormwaterProjects
Ina/Rt.73--Lindbergh/Adele-onhold.
West ShoreDrive
Meet with inspectorfor state regarding Bridge Inspection.Report.
Repairs are somewhat extensive; Twp.Involvement is possible
Three (3) 60" dia. Pipes required as alternative to existing
opening. Not desirable due to maintenance.
Twp. to make repairs as schedule permits.
Dog Park
Page 1 of 2
I:\Projects/MaidencreekTownship/18-0019-0100\Engineer'sAgendal7.12.18.docx

BOS awarded contract to Fehl's in the amount of $32,537; contracts
executed&NoticetoProceed sent.
Work completed; Application for Payment No. 1 in the amount of
$30,910.15 for approval (retainage $1,626.85).
2018RoadProjects
Contract"A"road paving contract Awarded to H&K Group in the amount
of$199,825.14 (includes both parking lot areas on Quarry Rd.)
Contract "B" cold-in-place recycling Evansville Rd. contract awarded to
H&K Group in the amount of $103,990.86.
Noticeof Award issued 6/4/18; PreconstructionMtg.heldon7/2/18.
Township road crew proceeding w/Quarry Rd.storm water and Evansville
Rd.drainage work.
NoticetoProceedissued7/2/18withstartdateof7/25/18.
E.Wesner Rd.-Streambank Rehabilitation
Settingupmeetingw/DEP
Twp.budget?
Twp.type of bank rehabilitation?
SubdivisionImprovementLOC/EscrowRelease
Brandywine Transportation-Release of Maintenance Financial
Security.
Sewage Enforcement OfficerActivityReport
Page 2 of 2
I:/Projects\MaidencreekTownship/18-0019-0100/Engineer'sAgendal7.12.18.docx

Most Recent
Letter Date
3/6/2018
2/8/2018
Review
3/5/2018
See SDEltr.3/6/18and MTPC Itr.
1/3/18&2/8/18
See SDE Itr.Dated 3/5/18
See SDE Itr.Dated 6/5/18
Comments
P.C. Action Itr. 1/4/18
Dated 4/5/18
See SDE Itr.
Approved
BY BOS
04/12/18
02/08/18
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
(may reflect more
than one extension)
Extension
06/05/18
07/13/18
SUBDIVISION STATUS
7/12/2018
Period Ends
03/06/18
03/06/18
06/05/18
90-Day
Review
07/31/18
Review Period
1:/ProjectsiMaidencreek Townshipl18-0019-01001Subdivision Statusi6.14.18
12/06/17
12/06/17
03/07/18
90-Day
Begins
05/02/18
Plan Stage
Prel.
LDP
Prel.
LDP
Final
LDP
Final
LDP
APPROVED/PENDINGPLANS:
GSP Properties - Business Park
GSPProperties -Business Park
Berkshire Building Services
Berkshire Building Services
CURRENT PLANS:
Project Name
No.

BERKS SURVEYING & ENGINEERING,Inc.
Land Surveying and Engineering Services
311EastMain StreetFleetwood,PA 19522
BERKS
Phone:610-944-8528
Fax:610-944-6123
www.berks-surveying.com
e-mail:info@berks-surveying.com
Member
June13.2018
To:
MaidencreekTownship
Board of Supervisors
P.O.Box 319
1QuarryRoad
Blandon,PA19510
E:
d.hollenbach@maidencreek.net (DianeHollenbach)
Re:
BerkshireBuildingServices,WestWesnerRoad
To Whom it May Concern:
We grantan extension of timeforreview bythe Maidencreek Township Board of
until September 14th, 2018.
Thank you.
Sincerely,
Robert D.Hain,PLS,ProjectManager
Berks Surveying& Engineering, Inc.
ForBerkshirePropertyManagement Company,LLC
Z:JOBS-2018\Folino-RRITWP-CO-STATE/2018-06-13_TimeExtensiontill9-14-18.doc

PUNCHLIST
Page 1 of 2
SYSTEMSDESIGN
SDE
ENGINEERING,INC
DateofInspection(s):06/29/2018
InspectionPerformedBy:ChipPohronezny
Project:MelrosePlace
Location:Maidencreek Township
ProjectNumber:06-0019-0585
Developer:Folino
Type of Inspection: Preliminary
Item No.
Description of Issue
All signage shall be straightened and installed at proper heights
Replacetreeonvacantlotnear112Lidia Lane
Installtreeinislandperplans
Install TruncatedDomematat intersectionof Lidia Lane andSofia Blvd
Replace stamped Truncated Domewith mat Lidia Laneand Sofia Blvd.
ReplacestampedTruncatedDomewithmat301AnnaAve,alsoramphassettled
Replace stamped Truncated Dome withmat Sofia Blvd.andAnna Ave.
Repair/Replacedrivewayapronat117LidiaLane
Repair/Replacedrivewayapronatvacantlotnear117LidiaLane
10
Caulk all Curbingwith sikaflexwereexpansion joint ismissing (throughoutdevelopment)
11
Repair/Replacedrivewayapronat101 Lidia Lane,expansion jointmissing
12
Repair/Replacesidewalkat100LidiaLane,Repair/Replacedrivewayapron
13
Caulkall sidewalkwith sikaflexwhereexpansion joint ismissing (throughoutdevelopment)
14
Replacebrokedlightpostbases
15
Repair/Replacedrivewayapronat 104 Lidia Lane,expansion joint missing
16
Topsoil andseedgrass stripsthroughoutthedevelopmentat sidewalks,severalareas arelow
17
Topsoil and seed around watercurb stops (throughout the development)
18
Repair/Replacedrivewayapronat108 Lidia Lane,expansion jointmissing
19
Repair/Replacedrivewayapronat112LidiaLane,expansion jointmissing
20
Clean asphalt material off all utilites (throughout the development)
21
Removeall inletprotectionfrominlets
22
Clean all inlets, remove any loose concrete and parge with non shrink grout
23
Repair all damaged inlettops (throughoutdevelopment)
24
Repair/Replacesidewalkatdeadend201AnnaAve.
25
Repair/Replacedamagedcurbatdead end ofLidia Lane
26
Missing sign at dead end of Lidia Lane
27
Repair/Replacesidewalk201AnnaAve.,Repair/Replacedrivewayapron
28
InstallsidewalknewLot#3
29
Repair/Replacedrivewayapronat213AnnaAve.
30
Repair/Replacesidewalk213/217AnnaAve.behindhydrant
31
Repair/Replacedrivewayapronat221AnnaAve.
32
Repair/Replacedrivewayapronand sidewalk settlement at225AnnaAve.
33
Install all lotpinsandmonuments
34
Repair/Replacedrivewayapron at 301AnnaAve.,noexpansion joint in apron
35
Repair/Replacedrivewayapronandsidewalkat305AnnaAve.
36
Repair/Replacedrivewayapron and sidewalk at300Anna Ave.
Repair/Replacedrivewayapronand sidewalk at StockpileLot AnnaAve.
38
Repair/Replacedrivewayapronandsidewalkat204AnnaAve.
39
Repair/Replacedrivewayapronacross from201Anna Ave.
Notes:
This punchlist shall be considered Preliminary until final restoration is completed.MaidencreekTownship
and/or its Engineer reserves the right to add items after the restoration work is considered complete.
Please Contact Michael W."Chip" Pohronezny of our office forty-eight (48) hours prior to starting any work on
Punchlistitems

PUNCHLIST
Page 2 of 2
SYSTEMSDESIGN
SDE
ENGINEERING,INC
Dateof inspection(s):06/29/2018
InspectionPerformedBy:ChipPohronezny
Project:Melrose Place
Location: Maidencreek Township
ProjectNumber:06-0019-0585
Developer:Folino
Type of Inspection:Preliminary
Item No.
Description of Issue
40
Repair/ReplacecurbnearTinyThinkersAcademy
41
Repair/Replace(2)ADArampsatentrancetoMassimo's
42
Repair/ReplacecurbatDentistofficenearupperparkingarea
43
Repair/Replacedrivewayapronat 333SofiaBlvd.,no expansion joint inapron
44
Repair/Replacedrivewayapronat 329SofiaBlvd.,no expansion joint inapron
45
Repair/Replacedrivewayapron at325Sofia Blvd.,no expansion joint in apron
46
Repair/Replace drivewayapron at 321 Sofia Blvd.
47
Repair/Replacedrivewayapronandsidewalkat Lot#49SofiaBlvd.
48
Repair/Replacedrivewayapronandsidewalkat217SofiaBlvd.,noexpansionjointinapron
49
Repair/Replace(2)ADArampsatrearentrancetoMassimo's
50
Repair/Replacecurbat Sofia Blvd.andAnnaAve.Massimo'sADAramp
51
Repair/Replacecurbatexitlaneofdevelopment
52
Repair/Replaceentranceislandcurb
53
Repair/ReplaceADArampatentrancetodevelopment
54
Repair/ReplacecurbatADAramptolightpostnearelectricalboxesatentrance
55
Repair/Replacedrivewayapron at208Sofia Blvd.
56
Repair/Replacedrivewayapron at vacant lot near208Sofia Blvd.
57
Repair/Replacedrivewayapronat216SofiaBlvd.
58
Repair/Replace drivewayapronat220 Sofia Blvd.
59
Repair/Replace curb behindinlet Sofia Blvd.and Lidia Lane at vacantlot
60
Repair/Replacedrivewayapronat312SofiaBlvd.
61
Topsoil and seedatnewhousenextto312SofiaBlvd.
62
Repair/Replacedrivewayapronat320SofiaBlvd.
63
Repair/Replacedrivewayapron at326Sofia Blvd.
64
Repair/Replacedrivewayapron at336Sofia Blvd.
65
Repair/Replacedrivewayapronat340SofiaBlvd.
66
Repair/Replacedrivewayapronat344 SofiaBlvd.,noexpansion joint in apron
67
Repair/ReplacesidewalknearADArampat300AnnaAve.
68
SubmitfinalAs-Built Plans
69
Clean upboth storm waterbasins so that these areas can bemaintained.
Notes:
This punchlist shall be considered Preliminaryuntil final restoration is completed. Maidencreek Township
and/or its Engineer reserves the right to add items after the restoration work is considered complete.
Please Contact Michael W."Chip"Pohronezny of our officeforty-eight (48)hours priorto starting anywork on
Punchlistitems
ENGINEER:SYSTEMSDESIGNENGINEERING,INC.
Cc.
By:
Date: 07/o6l1x

SYSTEMSDESIGN
ENGINEERING,INC
sdei.net
July 6, 2018
Maidencreek Township
1 Quarry Road
P.0.Box 319
Blandon, PA 19510
Attn:Diane Hollenbach, TownshipManager
Re: Township Dog Park Fence Project
Release No 1
Completion of Improvements
Dear Diane:
We are in receipt of a payment application from Fehl's t/a/ K.D. Home and Garden dated June 6, 2018
for the full contract amount of $32,537.00 (copy attached). Final inspection was performed at the Park
for the installation of all the required fence and associated hardware in accordance with the contract
specifications. Based on our review and final inspection, the work performed to date is in accordance
with contract specifications and plans.
We
recommendpayment of$30,910.15, retaining
$1,626.85(5%).
Sincerely,
SYSTEMSDESIGNENGINEERING,INC
Thomas Unger, PE
Township Engineer
Cc: Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor
Fehls t/a K.D. Home and Garden
SDE,Inc.17-0090-0237
1032 James Drive, Leesport,PA 19533P:610.916.8500F:610.916.8501
Schuylkill Hoven, PA .P: 570.385.5549
Bcyeroan. PA  P: 610.369 1319

.85
37,00
08
Page
1o.
910
6l8/208
0/b
17-0090-0237
APPLICATION NO:
APPLICATION DATE:
ENGINEER'S PROJECT NO:
PERIOD TO:
CONTRACTDATE:
:0120
Application ts mane for Payment, as shown beiow, fn connecton with the Contract.
Contractor named herein, Issuance, payment and acceptance of payment are without
Ltne from priorapplicarton)....
RECOMMENDEO BY: (ENGINEER) SYSTEMS DESIGN ENGINEERING, INC.
prejudice to any nights of the Owner or Contrector under this Centract.
Funding Agency (If Applicabte)
(Line 4 tess Line 5 Total)
%of Completed Work
..........
(tine3 Less Line 6)
Continuatfon Sheet, (is artached).
(7J)
LESSPREVIOUSPAYMENTS
J0%
Totaf Retainage:
(CotumnL)
VIA (ENGINEER): Systems Design Engineering, Inc.
RETAINAGE:
APPROVEDBY:
PROJECT: Dog Park Fence Project
(Submit 3 original copies to the Engineer)
Leesport, PA 19533
1032James Drive
The undersigned Contractor certifies that to the best of its knowledge: (t) all previous progress payments received from
DEDUCTIONS
(002/st
MyCommission expires:
indicated, the quality of the Work is in accordance with the Contract Documents, and
in accordancewith the Contract Documents,based on on·site observations and the
ADDITIONS
Notary Public:
APPLICATION FOR PAYMENT
Per k.
Date:
the Contractor is entitled topayment of the AMOUNT CERTIFIEO.
Date Approved
Total
TOTALS
Koch Road
CONTRACTOR'S CERTIFICATION
Subscribed and swom tobefore
ENGINEER'SCERTIFICATEFORPAYMENT
Maidencreek Township
Net changeby Change Orders
FROM (CONTRACTORI:
CHANGE ORDER SUMMARY
Change orders approved in
previousmonthsbyOwner
CONTRACTO..
dayof
ApprovedthisMonth
CONTRACT FOR:
Number
TO (OWNER):
CONTRAC
State of:
me this

Notice to Proceed
Date:
July3,2018
Project:
2018Annual PavingProject
Owner:
Maidencreek Township
Owner's Contract No.:
Contract:
ContractA--RoadImprovements
Engineer'sProjectNo.:18-0019-0115
Contractor:
H&K Group, Inc.
Contractor's Address:
P.O. Box 196, Skippack, PA 19474
You are hereby notified that the contract times under the above Contract will commence to run on
July25,2018
.On or before that date,you are to start performing your obligations under
the Contract Documents. In accordance with Article 4 of the Agreement, the date of substantial
completion isAugust 24,2018(30 days)and the date of Final Completion is
September23,2018
(60days).Please sign and return four (4)copies of theNotice to Proceedto the Engineer.
For:.
MaidencreekTownship
(Owner)
By:
(Engineer)
Systems Design Engineering, Iinc.
1032JamesDrive
Leesport,PA19533
Enclosures:
cc:
Acceptance of Notice
Receipt of theabove"Noticeto Proceed'is herebyacknowledged this
day of
2018,and weherebyconsider
July25,2018
astheofficial startingdateforthis
Contract.
By:
Title:
(Contractor)
EJCDCC-55oNoticetoProceed
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Canstruction Specifications Institute.
Page 1of1

Noticeto Proceed
Date:
July 3.2018
Project:
2018AnnualPavingProject
Owner:
MaidencreekTownship
Owner's Contract No.:
Contract:
Contract B -- Cold-in-Place Recycling
Engineer's Project No.: 18-0019-0115
Contractor:
H&K Group, Inc.
Contractor's Address:P.O.Box196, Skippack,PA 19474
You are hereby notified that the contract times under the above Contract will commence to run on
July25,2018
.Onorbeforethatdate,youaretostartperformingyourobligationsunder
the Contract Documents.In accordance with Article 4 of the Agreement, the date of substantial
completion is. August 24,2018(30 days) and the date of Final Completion is September 23,2018
(60 days).Please sign and return four (4) copies of the Notice to Proceed to the Engineer.
For:
MaidencreekTownship
(Owner)
Aais amo 
By:
(Engineer)
Systems Design Engineering, Inc.
1032James Drive
Leesport, PA 19533
Enclosures:
cC:
AcceptanceofNotice
Receiptof theabove"NoticetoProceed'isherebyacknowledgedthis
day of
2018, and we hereby consider
July25,2018
as the official starting date for this
Contract.
By:
Title:
(Contractor)
EJCDCC-550NoticetoProceed
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Construction Specifications Institute.
Page 1of 1

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
JULY 3,2018
DATE OFINVOICE/PAYEE
INVOICENO.
AMOUNT
1.MelrosePlace
1/31/18MaidencreekTwp.--Re:SDE,Inc.
92279
$7,396.22
AMOUNTDUE
$7,396.22
TOTALAMOUNTDUE
$7.396.22
I:ProjectsiMaidencreekTownshipVmprovementAgreementSummaries/2018107.03.18.doc

SYSTEMSDESIGN
ENGINEERING,INC
sdei.net
July 6, 2018
Maidencreek Township
1 Quarry Road
P.O. Box 319
Blandon,PA19510
Attn: Diane Hollenbach, Township Manager
Re: Brandywine Transportation
Land Development Plan
Completion of Improvements
Dear Diane:
Final inspection was performed for the above referenced project for the installation of all stormwater
management facilities and other required items in accordance with the approved plans. Based on our
review, the work performed is in accordance with the Township Improvements Agreement and approved
plans. We recommend at this time that Brandywine Transportation be released from the maintenance
financial security obligation.
Sincerely,
SYSTEMS DESIGN ENGINEERING,INC
Thomas Unger, PE
Township Engineer
Cc: Maidencreek Township Supervisors
Diane Hollenbach, Twp. Manager
Eugene Orlando Jr., Twp Solicitor
SDE,Inc.16-0019-0605
1032James Drive, Leesport, PA19533P:610.916.8500F:610.916.8501
Schuylkill Haven,Pap.570385.5549
Boyeitown. Pa P: 610 369.1319

nrniartelmainannraak/1gnn1nnnnlaaaaai..l..
Chk#
Billed/Paid
to Date By
Fee Paid
Applicant
MAIDENCREEKTOWNSHIP
SEOACTIVITYREPORT
6/1/18-6/30/18
Applicant/Activity
.No updates
SEO report,admin/filing.
App.#
18-0019-0300
SDE#
. Unger 2 copies
SEO Desk
Cc:

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.