Board of Supervisors
Agenda — September 13, 2018
- Date
- September 13, 2018
- Type
- Agenda
- Year
- 2018
- File
- PDF · 2.6 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 993 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS August 9,2018 ENGINEER'SAGENDA Subdivision Review Status Checklist Next Supervisors Meeting September 13, 2018 Berkshire Building Service expires 9/14/18. GSP Properties expires 9/13/18. Subdivision / Zoning / LDP Plans currently in review. GSP Properties Final LDP - See SDE Itr. dated 6/5/18; Planning Commission action Itr. dated 7/12/18 mtg. Berkshire Building Services Final LDP - See SDE Itr. dated 3/5/18; No Action Melrose Place Work on grading swale & properties is mostly complete; survey complete. Paving completed, sidewalks & street trees installed. Punchlist for entire development completed; Contractor working to complete Punchlist items. Projects Stormwater Projects O Ina/Rt. 73 - Lindbergh/Adele - on hold. WestShoreDrive Meet with inspector for state regarding Bridge Inspection. Report. Repairs are somewhat extensive; Twp. Involvement is possible Three (3) 60" dia. Pipes required as alternative to existing opening. Not desirable due to maintenance. Twp. to make repairs as schedule permits. Dog Park BOS awarded contract to Fehl's in the amount of $32,537; contracts executed & Notice to Proceed sent. Page 1 of 2 I:\Projects\MaidencreekTownship/18-0019-0100\Engineer's Agendal08.09.18.docx Work completed; Application for Payment No. 2 (Final) in the amount of $1,626.85 for approval. 2018 Road Projects Contract "A" road paving contract Awarded to H&K Group in the amount of $199,825.14 (Includes both parking lot areas on Quarry Rd.) Contract "B" cold-in-place recycling Evansville Rd. contract awarded to H&K Group in the amount of $103,990.86. Notice to Proceed issued 7/2/18 with start date of 7/25/18. Met with Contractor to mark roads. E. Wesner Rd.-- Streambank Rehabilitation Spoke with DEP; not ableto meet at this time. Mtg. w/contractor Monday, Aug. 6 @ 1:30. Attached is a Manual from PA Fish & Boat Commission. Attached is narrative on previous Willow Creek Habitat Restoration Project. Project could be as simple as dumping riprap under a GP3 issued by BCCD must limit work to 5oo LF or project similar to previous Willow Creek project which would be a GP1 and could involve other agencies. Schaeffer Road Bridge Attended construction mtg. Pilings being drilled with limited driving impact. Waterline being monitored w/Authority Twp. to be notified when pilings are being driven & any work over waterline. Main St./Grove Rd. Intersection Surveying for clear sight distances. SubdivisionImprovement LOC/Escrow Release Mid-Atlantic Energy -- Release of Maintenance Financial Security. Schwab Land Dev. -- Release of Maintenance Financial Security. Sewage Enforcement Officer Activity Report Page 2 of 2 I:\Projects\MaidencreekTownshipl18-0019-0100\Engineer'sAgenda\08.09.18.docx Most Recent Letter Date 3/6/2018 2/8/2018 Review 3/5/2018 . 3/6/18 and MTPC Itr. 1/3/18 &2/8/18 See SDE Itr. Dated 3/5/18 See SDE ltr. Dated 6/5/18 Comments P.C. Action ltr. 1/4/18 Dated 4/5/18 See SDE ltr. See SDE Itr. Approved BY BOS 04/12/18 02/08/18 MAIDENCREEK TOWNSHIP,BERKS COUNTY (may reflect more than one extension) Extension 06/05/18 09/14/18 09/13/18 SUBDIVISIONSTATUS 8/9/2018 Period Ends 03/06/18 03/06/18 06/05/18 90-Day Review 07/31/18 Review Period 12/06/17 12/06/17 03/07/18 90-Day Begins 05/02/18 Plan Stage LDP Final Prel. DP DP Final LDP PLANS: GSP Properties - Business Park GSP Properties - Business Park Berkshire Building Services Berkshire Building Services /PENDING CURRENT PLANS: Project Name APPROVED No. SYSTEMSDESIGN SDE "A Passion for Engineering Ecellence ENGINEERING,INC sdei.net August 9, 2018 Maidencreek Township 1 Quarry Road P.0. Box 319 Blandon, PA 19510 Attn: Diane Hollenbach, Township Manager Re: Township Dog Park Fence Project Release No 2 (Final) Completion of Improvements Dear Diane: Final inspection was performed at the Park for the installation of all the required fence and associated hardware in accordance with the contract specifications. Based on our review and final inspection, the work performed to date is in accordance with contract specifications and plans. We recommend payment of the retainage in the amount of $1,626.85 to Fehl's t/a/K.D. Home & Garden. Sincerely, SYSTEMS DESIGN ENGINEERING, INC. Thomas Unger, PE Township Engineer Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor Fehls t/a K.D. Home and Garden File 17-0090-0237 1032 James Drive, Leesport, PA 19533P: 610.916.8500。F: 610.916.8501 Schuylkill Haven, PAP:570.385.5549 Boyertown, PA e P: 610.369.1319 SUMMARY IMPROVEMENTAGREEMENTSINVOICES APPROVEDFORPAYMENT MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS AUGUST 3, 2018 DATEOFINVOICE/PAYEE INVOICE NO. AMOUNT 1.Melrose Place 7/31/18 Maidencreek Twp. - Re: SDE, Inc. 92799 $3,955.96 AMOUNTDUE $3,955.96 2.Brandywine Transportation Const. Insp. 7/31/18 Maidencreek Twp. - Re: SDE, Inc. 92800 $ 501.11 AMOUNT DUE $501.11 TOTALAMOUNTDUE $4,457.07 I:\Projects(Maidencreek Townshipllmprovement Agreement Summaries/201818.3.18.doc SYSTEMSDESIGN SDE "A Passicn for Engineering E.cellence" ENGINEERING,INC sdei.net August 9, 2018 Maidencreek Township 1 Quarry Road P.O. Box 319 Blandon, PA 19510 Attn: Diane Hollenbach, Township Manager Re: Mid-Atlantic Energy Land Development Plan Completion of Improvements Dear Diane: Final inspection was performed for the above referenced project for the installation of all stormwater management facilities and other required items in accordance with the approved plans. Based on our review, the work performed is in accordance with the Township Improvements Agreement and approved plans. We recommend at this time that Mid-Atlantic Energy be released from the maintenance financial security obligation. Sincerely, SYSTEMS DESIGNENGINEERING,INC. Thomas Unger, PE Township Engineer Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor SDE, Inc.16-0019-0588 1032 James Drive, Leesport, PA 19533。P: 610.916.8500 F: 610.916.8501 Schuylkill Haven,PAeP:570.385.5549 Boyertown,PAP:610.369.1319 SYSTEMSDESIGN SDE "A Passion for Enginee:ing Excellence" ENGINEERING,INC sdei.net August 9, 2018 Maidencreek Township 1 Quarry Road P.0. Box 319 Blandon, PA 19510 Attn: Diane Hollenbach, Township Manager Re: Schwab Land Development Land Development Plan Completion of Improvements Dear Diane: Final inspection was performed for the above referenced project for the installation of all stormwater review, the work performed is in accordance with the Township Improvements Agreement and approved plans. We recommend at this time that Schwab Land Development be released from the maintenance financial security obligation. Sincerely, SYSTEMS DESIGN ENGINEERING, INC. Thomas Unger, PE Township Engineer Cc: Maidencreek Township Supervisors Diane Hollenbach, Twp. Manager Eugene Orlando Jr., Twp Solicitor SDE, Inc.16-0019-0603 1032 James Drive, Leesport, PA 19533P: 610.916.8500 。F: 610.916.8501 Schuylkill Haven,PAP:570.385.5549 Boyertown, PA P: 610.369.1319 Chk # Billed/Paid to Date By Fee Paid Applicant 《TOWNSHIP YREPORT 7/1/18 - 7/31/18 Applicant/Activity SEO ACTIVITY F MAIDENCREEK SEO report, admin/filing. No updates App. # 18-0019-0300 SDE# . Unger 2 copies SEO Desk Cc: