MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
December13,2018
ENGINEER'SAGENDA
SubdivisionReview StatusChecklist
Next Supervisors Meeting January7,2019
Subdivision / Zoning /LDP
Plans currentlyinreview.
None
Melrose Place
Paving completed, sidewalks & street trees installed.
Punchlistfor entire development compiled; Contractorworkingto
completePunchlist items.
Projects
Stormwater Projects
O Ina/Rt. 73 -- Lindbergh/Adele -- on hold.
WestShoreDrive
Meet with inspector for state regarding Bridge Inspection.Report.
Repairs are somewhat extensive;Twp.Involvement is possible
Three (3) 60"dia. Pipes required as alternative to existing
opening. Not desirable due to maintenance.
Twp.to make repairs as schedule permits.
2018 Road Projects
Contract"A" road paving contract Awarded to H&K Group in the amount
of $199,825.14 (lncludes both parking lot areas on Quarry Rd.)
Contract"B" cold-in-place recycling Evansville Rd.contract awarded to
H&K Group in theamount of$103,990.86.
Time extension Change Order No.1 executed.
Final PennDOT paperwork in progress.
Schaeffer Road Bridge
Continueto attended construction mtg
Page 1 of 2
I:\Projects/MaidencreekTownshipl18-0019-0100\Engineer'sAgendal12.13.18.docx

Contractor/Engineer/PennDOThaveresolvedissueswithpile
driving.
Cold weatherconcreteprovisions beingtaken.
Timeextension beingcoordinated.
Pavingwill notbe completed &bridgenot toopenuntil next
spring. Provisions to be made to open Cornerstone Dr.
Sinkholes
MeadowBrook--MillenniumDrive.DEsscoOtoschedulework.
SubdivisionImprovementLOC/EscrowRelease
SewageEnforcementOfficerActivityReport
Page 2 of 2
I:\Projects/MaidencreekTownship|18-0019-0100\Engineer'sAgenda|12.13.18.docx

Most Recent
Letter Date
10/31/2018
3/6/2018
2/8/2018
9/1/2018
Review
7/6/2018
.3/6/18andMTPCltr.
1/3/18&2/8/18
See SDE Itr.Dated 10/31/18
See SDE Itr.Dated 9/1/18
See SDE Itr.Dated 7/6/18
Approved w/conditions
Approved w/conditions
Comments
P.C. Action Itr. 1/4/18
See SDEItr.
See SDE Itr.
Dated 4/5/18
Approved
04/12/18
02/08/18
09/13/18
BY BOS
11/08/18
11/08/18
MAIDENCREEKTOWNSHIP,BERKSCOUNTY
(may reflect more
than one extension)
Extension
06/05/18
09/14/18
10/12/18
11/09/18
SUBDIVISIONSTATUS
12/13/2018
Period Ends
03/06/18
03/06/18
06/05/18
07/31/18
90-Day
Review
01/01/19
Review Period
I:/ProjectsMaidencreekTownship/18-0019-01001SubdivisionStatusl12.13.18
03/07/18
12/06/17
12/06/17
05/02/18
Begins
90-Day
10/03/18
Plan Stage
Final
Final
LDP
Prel.
LDP
LDP
LDP
Final
Prel.
Plan
APPROVED/PENDINGPLANS:
GSP Properties - Business Park
GSP Properties - Business Park
Berkshire Building Services
Berkshire Building Services
Messinger Annexation Plan
CURRENTPLANS:
Project Name
No.

PUNCH LIST
Page 1of 1
SYSTEMSDESIGN
INGINFIRINGIN(
DateofInspection(s):11/19/2018
InspectionPerformedBy:CPandEK
Project: Melrose Place
Maidencreek Township
Contract:
FINAL PUNCHLIST
11.27.18
ItemNo.
Descriptionof Issue
Manhole rimneeds leveling to streetgrade in Sofia Blvd.(between lots 14and 15 instreet)
WaterValverim(nearaboveMH)needs levelingtostreetgrade.
Stormwater basinbehind commercial lotsneeds debris cleaned out, standing water near inlet needs tobe sddressed
Need outlet area cleaned out, needs to begraded seededand stabilized.
OverflowswalefromparkinglotBMPareatobasinneedsrutsrepaired,seededand stabilized.
Safetygate oninletneedstobesecured.
Allareasinandaroundbasinneedtobemowable.
Stormwater basin behind residential lots needs debris cleaned out.Large boulders need to be removed.Fillneeds to
beplaced near inlet(standing water observed to be 1oto12 inches deep).Outiet needs cleaning out and area around
outlet needs tobe graded, seededandstabilized.Allareas disturbed needtobe stabilized, seeded andmowable.
Safteygate in inlet needs tobesecured.
Ownershall refertooriginal and/orapprovedcorrectiveactionStormwatermanagementdesigns(asapprovedbyDEP/
Berks County Conservation District) forreturning thebasins totheiroriginal conditions.
All areas inand aroundthebasins shall bemowablewithnodebris, rocks,ruts,standingwater,ormud.
StatusofNPDESpermitrenewal/closeoutshallbeprovided.
As-builtplansshallbeprovidedonceallworkiscompleted.
Notes:
This punchlist shall be considered Preliminary until final restoration is complet ete and Maidencreek Township
and/or its Engineer reserves the right to add items after the restoration work is considered complete.
Punchlistitems
ENGINEER:SYSTEMSDESIGNENGINEERING,INC.
By:
Date:
Cc.
I:IProjectsiMaidencreekTownshipl06-0019-0585MelrosePlaceMelroseFinalPunchlist11.27.18

SUMMARY
IMPROVEMENTAGREEMENTSINVOICES
APPROVEDFORPAYMENT
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS
DECEMBER3,2018
DATE OFINVOICE/PAYEE
INVOICE NO.
AMOUNT
1.MelrosePlace
11/30/18MaidencreekTwp.--Re:SDE,Inc.
94045
$1,671.90
AMOUNTDUE
$1,671.90
TOTALAMOUNTDUE
$1.671.90
I:ProjectsMaidencreekTownshiplmprovementAgreementSummaries/2018112.3.18.doc

Chk #
Billed/Paid
to Date By
Fee Paid
Applicant
10/31/18 - Telcon w/Elaine Meisser re: 131 Koller Rd. septic
Send copy of approved design.
MAIDENCREEK TOWNSHIP
SEOACTIVITYREPORT
November 2018
Applicant/Activity
system permitting history.
11/5/18 - misc admin/fling
11/6/18 - SEO report
App. #
18-0019-0300
SDE#
T. Unger 2 copies
SEO Desk
Cc:

Archived from the Maidencreek Township website. Reproduced unaltered; not an official records repository.