Board of Supervisors
Agenda — January 4, 2021
- Date
- January 4, 2021
- Type
- Agenda
- Year
- 2021
- File
- PDF · 1.8 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 652 words
MAIDENCREEKTOWNSHIPBOARDOFSUPERVISORS December 10,2020 ENGINEER'SAGENDA Subdivision ReviewStatus Checklist Next Supervisors Meeting January 4, 2021 Reorganization mtg; Jan.14,2021 Subdivision/Zoning/ LDP JoJaz Subdivision Prel./Final see SDE review Itr.Dated 8/4/20. Redner's Quickshop &Car Wash Prel.Plan Bos conditional approval PreliminaryPlan11/12/20. David Kopfer Sketch Plan for Record see SDE Itr.Dated 6/3/20; zoning variance approved for flag lot. Gun Range regulations draft reviewed w/P.C. on 1/8/20 revisions/additions being made. Burning Ordinance regulation draft reviewed by P.C. on 9/2/2020 additional revisions/additionsbeingmade. Projects Street Projects 2020 Excelsior Drive& June Ave.BOS awarded: Contract"A"to Recon Constructionin the amountof $206,038.00; work completed 8/20/20. Application for Payment No. 1 (Final) in the amount of $199,976.78; Change Order No. 1 credit (decrease) in the amount of $6061.22 Contract "B" to New Enterprise Stone & Lime Co. in the amount of $135,317.50; work completed. Application for Payment No.1 (Final) in the amount of $128,818.02; Change Order No. 1 credit (decrease) in the amount of $6499.48. LutzPropertyE.WesnerRd.stormwaterissue Reviewed Walnut Manor &GoldenManorSubdivision Plans (Plans start in 1987). There is no storm water easement on plans. No notes for storm water system maintenance on plans. Inspectedsitew/KeithS. Established that headwall is at 20'6"from centerline & Twp.r/w is 26'6". Proposed Twp. Scope of Work provided to Twp. Page1of 2 I:\Projects/MaidencreekTownshipl20-0019-0100\Engineer'sAgendal12.10.20.docx Storm Damage 241 W. Walnut Tree Dr.-inspected and walked site during two (2) rain events; presenteddiagrams and sketches @B0s Meeting 11/12/20. Reviewed Twp.Wide storm water systems; there are over 1167inlet structures; Bos agreed to form a storm water action committee (one BOS, Manager, Road Foremen, One PC Member and Twp.Engineer) SubdivisionImprovementLOC/EscrowRelease None SewageEnforcementOfficerActivityReport See Attached Page 2 of 2 I:/ProjectslMaidencreekTownship\20-0019-0100\Engineer'sAgendal12.10.20.docx Most Recent Letter Date 11/10/2020 5/1/2020 10/7/2020 Review 6/3/2020 BOS granted conditional Prel. Approval conditioned on SDE Zoning Variance granted Comments Plan approval 11/12/20 reviewletter Approved BY BOS 05/14/20 MAIDENCREEK TOWNSHIP, BERKS COUNTY (may reflect more than one extension) Extension 11/30/2020 2/28/2021 12/1/2020 12/01/20 3/1/2021 SUBDIVISIONSTATUS 12/10/2020 Period Ends 07/16/20 09/01/20 90-Day Review 09/01/20 09/01/20 Review Period 04/17/20 06/03/20 Begins 90-Day 06/03/20 06/03/20 Plan Stage Prelm/Final Prelm/Final Prelm Plan Sketch Plan for Record Plan Plan APPROVED/PENDINGPLANS: Redner's Quickshop and Car Wash David Kopfer Subdivision CURRENT PLANS: Schick Dental Office Jojaz Subdivision Project Name No. MAIDENCREEKTOWNSHIP SEOACTIVITYREPORT November,2020 Fee Paid to Date By SDE# Aop.# Applicant/Activity Applicant Billed/Paid Chk # 120Koller Rd 16-0019-0471 Z187417 Transfer septic permit to new owner. 30.00 Paid 1612 281Blandon Road 7/19/19-Replacementseptic systemapplication.Testingwas performed by previous SEO. Verify test site. Send idemntification 19-0019-0479 form to applicant.Septic system permit cannot be issued until the Z176966 notarized indemnification is receivedby SEO. 9/4/19-Process application andverification of priortestingfornew septic system.Reviewdesign/issuepermit No update 724.00 Paid 1002 65 Troxel Rd. 19-0019-0480 Z203635 10/7/19-Reviewdesign/issuepermitfornewsystem No update $585.00 Paid 122 Misc Admin Telcon and send appliaiton package to transfer a septic permit 20-0019-0300 from Nobin Nagle to the new property owners at 120 Koller General Work Rd. 1142PleasantHill Road-Ownerwantstosubdivideanotherlotoff of the farm. 2/17/20 -Schedule testing and notify PADEP. 3/5/20-Probesforprimary andreplacement systemon newlot and replacement area for existing lot. 3/6/20-Conduct percolation testing for primary and replacement systemon newlot. 20-0019-0481 Subdivision 3/31/20-Completesoilreports,sendtoconsultant 6/2/20 - Rec incomplete planning module. Send letter to consultant. 6/9/20-Communicationsw/Phil AshearandPADEPre:nitrate easementrequirements. 11/9/20 -Discuss septic system options wlconsultant. Spray irrigation may be a possibility. Waiting for consultant to schedule a date for additional soil testing. $1,608.00 Paid 114 1070 Maidencreek Road - The property didn't pass the real estate inspection. Replacement septic system testing is necessary. 20-0019-0482 Z215216 3/17/20 -Conduct soil probes. Dig/presoak perc holes. 3/18/20-Performpercolationtest. No update 692.00 Paid 872ParkRd-Replacementsystem 5/13/20-Processapplication 5/14/20-Observeprobes 20-0019-0485 Z210426 5/15/20-Perform percolation test 5/18/20Soil reportand sendtodeigner 6/11/20 - Review design. Fees due before permit can be issued. No update $570.00 Paid 50873 Maidencreek Road;Developer wants to create3lots and one residual lot (4 total). 9/23&9/24/20-Observesoilprobes. 20-0019-0487 9/25/20-Observe percolation testing. JoJaz Subdivsion 9/28&9/29/20-Observe percolation testing. 10/15/20 -Discuss testing results w/Phil Ashear. No update $1,500.00 Paid 1186 20-0019-0488 Applicant wants to convertthehome intoan office.Perform 932Park Rd site visit and compose letter to re-use septic system. $180.00 Paid 1019 Cc:T.Unger 2 copies SEO Desk projects/maidencreek/20-0019-0300/seoactivity