Other Township Records
Resolution 20-2024
- Date
- Date unknown
- Type
- Resolution
- Year
- 2024
- File
- PDF · 1.2 MB
Document text
Machine-extracted from the original — formatting is approximate and there may be recognition errors. Always check the original file above before relying on it. 406 words
MAIDENCREEKTOWNSHIP BERKSCOUNTY,PENNSYLVANIA RESOLUTIONNO.QO_2024 ARESOLUTIONREQUESTINGACATEGORY4FACILITIESLOCAL SHAREASSESSMENTGRANTFORCORNERSTONEBRIDGE Be it RESOLVED, that the Maidencreek Township of Berks County hereby request a Category 4 Facilities Local Share Assessment grant of s 273, 119,ill from the Commonwealth Financing Authority to be used for rebuilding Cornerstone Bridge. Beit FURTHERRESOLVED,that theApplicant doesherebydesignateDavidFranke and Diane Hollenbach as the official(s) to execute all documents and agreements between the Maidencreek Township and the Commonwealth Financing Authority to facilitate and assist in obtaining the requested grant. I, Christina Hafer, duly qualified Secretary of the Maidencreek Township, Berks County, PA, hereby certify that the foregoing is a true and correct copy of a Resolution duly adopted by Resolution has been recorded in the Minutes of the Maidencreek Township and remains in effect as of this date. maictencreek IN WITNESS THEREOF, I affix my hand and attach the seal of the ToWnShi_, this Sth_ day of Auqu st, 2024. Maidencreek Township BerksCounty,Pennsylvania David K. Franke, Chairman JoshuaMeck,ViceChairman Attest: Christina L. Hafer, Secretary Eric Bauman, Supervisor 15,000.00 560.00 6,187.50 20,000.00 1,500.00 949.00 15,000.00 835.00 2,340.00 115,180.00 1 Engineer's opinion of probable Construction Cost are made on the basis of the Engineer's experience and qualifications and represents the Engineer's 4,200.00 1,684.32 233,435.82 $4,669 273,119.91 15,000.00 25,000.00 $23,344 $11,672 10,000.00 TOTAL COST over the cost of labor, materials, equipment, or services furnished by others,or over contractors'methods of determining prices, or over competitive 6/14/2024 8/8/2024 bidding or market conditions, Engineer cannot and does not guarantee that proposals, bids, or actual Construction Costs will not vary from opinions PROJECTCOSTS Date: 15,000.00 5.00 6.50 060 20,000.00 750.00 COSTRUCTION COST LEGAL/ADMINISTRATION/FINANCIAL (2%) Revised 15,000.00 150.00 ENGINEERING (10%) 115,180.00 5,000.00 15,000.00 39.00 8.35 3.19 25,000.00 CONTINGENCY (5%) UNITCOST UNIT QUANTITY 146 112 6875 100 528 OPINIONOFPROBABLEPROJECTCOST BERKS COUNTY, PA MAIDENCREEK This Opinion of Probable Cost (OpC)does not constitutea proposal of services. Actual engineering costs may differ from the amount shown on the OPC. A detailed scope and budget would be assigned should the client request. of probable Construction Cost prepared by the Engineer, ContechALBC System andSteel EXPRESS Foundations Project Name:Maidencreek Estates Culvert Repair Cornerstone DESCRIPTION Aluminum Haunch Plate& Crown Plate AluminumBoxCulvert(ALBC)#88 Erosion Control Blanket/JuteNetting Haunch Ribs & Crown Ribs Allowance for ESC Conditions Erosion&SedimentControl Client:MAIDENCREEK TOWNSHIP Aluminum Headwalls Aluminum Wingwalls Steel Express Footers Demolition/Mobilization 12"Compost Filter Sock 18"Compost Filter Sock Stream Diversion Project No.: 23-0019-0263 ApproachSlabs RiprapApron Construction Structural Fill Abutements SitePrep Guiderails Concrete Crane Labor Disclaimer: Notes: ON PAMELA JEFANNE STEVENS PROFESSIONAL No PE041826 REGISTERED ENGINEER